What is the density of the wood

Assignment Help Risk Management
Reference no: EM132513334

A wooden raft has a surface area of 5.00 m2 and Volume 0.7 m3. When the raft is placed in salt water (ρ=1050 kg/m3), the bottom 9.07 cm of the raft is submerged. What is the density of the wood?

Reference no: EM132513334

Questions Cloud

Calculate the net payout for a written put option : Calculate the net payout for a written put option at 66p and 67p for the following possible Maturity prices: 55p, 60p, 65p, 70p, 75p.
Coefficient of linear expansion of the rod : By how much does the length of the rod change (in cm) if the coefficient of linear expansion of the rod is 33 x 10-6 1/°C?
Homeland security : Why didn't we cover GEOINT? Isn't that a big part of intelligence collections? I'd like you to each address the question, why didn't we cover GEOINT in course
Water flows through a section of hose : A second section of hose has a diameter of 1.1 cm. At what speed (in m/s) does the water flow through the narrower section of hose?
What is the density of the wood : When the raft is placed in salt water (?=1050 kg/m3), the bottom 9.07 cm of the raft is submerged. What is the density of the wood?
Which calculation kristin use during year two of asset life : Plant assets over a 10-year life with a 10% salvage value. Using straight-line depreciation, which calculation Kristin use during year 2 of the asset's life?
What is the potential energy of the spring : What is the potential energy of the spring/block system 0.25 s after releasing the block?
Health care policy and law : Explain how Medicaid is funded? What changes would you recommend that states make to the Medicaid program?
What is velocity at the end of the acceleration : An airplane takes off from rest. It accelerates 4 m/s2 for 35 seconds. What is its velocity at the end of the acceleration? How far did it go in the 35 seconds?

Reviews

Write a Review

Risk Management Questions & Answers

  Company manufactures and distributes smoothies

Sunshine Smoothies Company (SSC) manufactures and distributes smoothies. What is the value of the abandonment option?

  What is the appropriate hedging strategy using call options

What is the appropriate hedging strategy using call options - what is the cash flow of the hedging strategy and what is the maximum gain possible on expiration?

  Who should be appointed to own risk on a project

Who should be appointed to own risk on a project? What is a risk owner's role in the risk response plan? How should a project manager assess and deal with risk?

  Focus on operational risk management

The best way to begin this paper is to think of companies that you have heard of in the headlines in a negative way, or companies that have gone out of business in the last several years.

  A leader in your firm has been studying the foreign

a leader in your firm has been studying the foreign exchange market for a number of years and believes that she can

  Contributed to the firm poor performance

What problems might have contributed to the firm’s poor performance?

  What are the most important operational and financial risks

What are the most important operational and financial risks in this arrangement? How can the company pay its Canadian employees, who presumably want Canadian dollars, when its U.S. customers are paying in U.S. dollars?

  Determine the approach that would carry the smaller risk

Determine the approach that would carry the smaller risk and the approach that would carry the bigger risk. Provide a rationale for your response. 1-2 Paragraphs.

  What is the risk from systems engineering perspectives

Your teams sensitivity analysis and recommendations based on the risk factor calculated for your assumption - What is the RISK from Systems Engineering perspectives if we want to become the Agent and distributer in the UAE

  Determine the expected costs for each named risk

Determine the expected costs for each named risk. Determine the Risk Probability for each named risk. Determine the Risk Impact to project.

  What do you think are the likely consequences of the risk

What do you think are the likely consequences of the risk and What do you think is the likelihood of the risk occurring

  Describe the likelihood and potential impact of such risk

Identify key risks (both positive and negative) associated with embarking on a graduate program. Describe the likelihood and the potential impact of such risks.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd