Reference no: EM13531124
1) You are given the following information about a dry-batchpaving operation. You are going to use one mixer that has a servicerate of 30 serives/hr. The dry-batch trucks you use forbringing concrete to the paver have an arrival rate of 7.5 arrivals/hr. Each truck carries 6 cu yd of concrete. You have a totalamount of 13,500 cu yd of concrete to pour. You rent a truckat $100/hr, and the paver at $300/hr.If the job takes more than 80hrs, you pay a penalty of $700/hr owing to delays in jobcompletion. On the basis of least cost, determine the numberof trucks you should use. Plot the cost versus the number oftrucks used.
2) As a contractor, you are blasting rock out of a quarry andhauling it down to the waterfront in dump trucks to form a jetty(see picture on following page).
Quarry blasting
Blasted rock has 0.69 swell factor
Loose rock density = 1.4 tons/yd3
Blasting produces 500 yd3 of loose rock every houron average
Efficiency is already factored in to the blasting productionrate
Trucking
You have 5 off-road dump trucks to transport the rock
Capacity = 25 yd3 of loose rock each on average
Efficiency: trucks work 55 minutes out of every hour
Typical haul cycle:
5 minutes loading
8 minutes from quarry to jetty
1 minute dump
8 minutes return trip
Jetty placement
The jetty consists of 100,000 yd3 of rock materialthat you must place
Once placed, “jetty rock” has an average density of1.45 tons/yd3 in place
It takes 3 minutes for the excavator on the jetty to adjust therocks dumped by each truck so that they are properly positioned inthe jetty. The next truck cannot dump its rocks until the excavatoris done with the positioning from the previous truck.
Efficiency: excavator works 50 minutes out of every hour
Answer the following questions:
What is the density of the rock (in tons/yd3) in the bank before it is blasted out?
How many complete cycles can a truck make in 1 hour?
What is the productivity of this operation in terms ofyd3/hr of jetty rock?
How many total truck loads do you need to place all the jettyrock?
Estimate the tension in the rope if the wind
: The intensity of Na light passing through a gold film wasmeasured to be about 15% of the incoming light. What is thethickness of the gold film? ( λ=589 nm; k=3.2).
|
What is the original unstretched length of the cable
: A 57.0 kg skier is being pulled up a 13.0° slope by a steelcable. The cable has a cross-sectional area of 7.18 10-5 m2. The cable applies a force tothe skier
|
Determine the approximate drag coefficient for the parachute
: A 5-m-diameter parachute of a new design is to be used to transporta load from flight altitude to the ground with an average verticalspeed of 3 m/s. The total weight of the load and theparachute is 200 N. Determine the approximate dragcoefficient for..
|
Do the same for saturated vapor steam in an adiabatic
: Saturated liquid water is in an adiabatic compressor with inlet and outlet pressures of 100 kPa and 1 Mpa. The isentropic efficiency is 85%. Find the work input (kj/kg) and entropy generation (kj/ kg K).Do the same for saturated vapor steam in an adi..
|
What is the density of the rock before it blasted
: You are given the following information about a dry-batchpaving operation. You are going to use one mixer that has a servicerate of 30 serives/hr. The dry-batch trucks you use forbringing concrete to the paver have an arrival rate of 7.5 arrivals/hr...
|
A street car line on the center of an 80 ft street makes
: A street car line on the center of an 80 ft street makes a 75degrees 24' turn into another street of equal width. Thecorner curb line has R=12 ft. What's the largest R that canbe given a circular curve for the tract center line if the law requires it..
|
Knowing that the coefficient of restitution between the
: A 2-lb sphere A is moving to the left with a velocity of 40 ft/swhen it strikes the inclined surface of a 5-lb block B which is atrest. The block is supported by rollers and is attached to a springof constant k=12 lb/in.
|
Determine the required capacity of the motor of the
: A step-type escalator as shown is designed to transport 120 persons per minute at a constant speed v=1.5 ft/s. The overall efficiency of the escalator is estimated to be 70%, and a 200% overload is to be allowed. Assuming that the average weight per ..
|
What is the underflow flow rate
: A settling tank in a water treatment plant has an inflow of 2m3/min and a solids concentration of 2100 mg/L. The effluentfrom this settling tank goes to sand filters. Theconcentration of sludge coming out of the bottom (the underflow) is18,000 mg/L, ..
|