What is the daily capacity of the assembly line

Assignment Help Case Study
Reference no: EM13859274

CASE: Designing Toshiba's Notebook Computer Assembly Line

Toshihiro Nakamura, manufacturing engineering section manager, examined the prototype assembly process sheet (shown in Exhibit 6A.18) for the newest subnotebook computer model.

With every new model introduced, management felt that the assembly line had to increase productivity and lower costs, usually resulting in changes to the assembly process. When a new model was designed, considerable attention was directed toward reducing the number of components and simplifying parts production and assembly requirements. This new computer was a marvel of high-tech, low-cost innovation and should give Toshiba an advantage during the upcoming fall/winter selling season.Production of the subnotebook was scheduled to begin in 10 days. Initial production for the new model was to be at 150 unitsper day, increasing to 250 units per day the following week (management thought that eventually production would reach 300 units per day). Assembly lines at the plant normally were staffed by 10 operators who worked at a 14.4-meter-long assembly line. The line could accommodate up to 12 operators if there was a need. The line normally operated for 7.5 hours a day (employees worked from 8:15 A.M. to 5:00 P.M. and regular hours included 1 hour of unpaid lunch and 15 minutes of scheduled breaks). It is possible to run one, two, or three hours of overtime, but employees need at least three days' notice for planning purposes.

The Assembly Line

At the head of the assembly line, a computer displayed the daily production schedule, consisting of a list of model types and corresponding lot sizes scheduled to be assembled on the line. The models were simple variations of hard disk size, memory, and battery power. A typical production schedule included seven or eight model types in lot sizes varying from 10 to 100 units. The models were assembled sequentially: All the units of the first model were assembled, followed by all the units of the second, and so on. This computer screen also indicated how far along theassembly line was in completing its daily schedule, which served as a guide for the material handlers who supplied parts to the assembly lines. The daily schedules were shared with the nearby Fujihashi Parts Collection and Distribution Center. Parts were brought from Fujihashi to the plant within two hours of when they were needed. The material supply system was very tightly coordinated and worked well. The assembly line consisted of a 14.4-meter conveyor belt that carried the computers, separated at 1.2-meter intervals by white stripes on the belt. Workers stood shoulder to shoulder on one side of the conveyor and worked on the units as they moved by. In addition to 10 assembly workers, a highly skilled worker, called a "supporter," was assigned to each line. The supporter moved along the line, assisting workers who were falling behind and replacing workers who needed to take a break. Supporters also made decisions about what to do when problems were encountered during the assembly process (such as a defective part). The line speed and the number of workers varied from day to day, depending on production demand and the workers' skills and availability. Although the assembly line was designed for 10 workers, the number of workers could vary between 8 and 12. Exhibit 6A.18 provides details of how the engineers who designed the new subnotebook computer felt that the new line should be organized. These engineers design the line assuming that one notebook is assembled every two minutes by 10 line workers. In words, the following is a brief description of what each operator does:

I. The first operator lays out the major components of a computer between two white lines on the conveyor.

II. The second operator enters the bar codes on those components into a centralized computer system by scanning the bar codes with a hand-held scanning wand. On a shelf above theconveyor, portable computers display the operations that are performed at each station.

III. The next six steps of the assembly process involve a large number of simple operations performed by hand or with simple tools, such as electric screwdrivers. Typical operations involve snapping connectors together or attaching parts with small screws. All tools are hung by a cable above the operators, within easy reach. Although the individual operations are simple, they require manual dexterity and speed.

IV. The last two operations are the hardware and shock tests. Toprepare for the hardware test, an operator inserts a memory card into the USB port containing software designed to test different components of the computer circuitry. Because it takes nearly four minutes to load the testing software, the cycle time of this operation is longer than the other cycle times on the line. To achieve a lower cycle time for the line, the hardware test is performed in parallel on three different units. The units remain on the moving conveyor, and the tests are staggered so that they can be performed by a single operator. The shock test (the last operation on the assembly line) tests the ability of the computer to withstand vibrations and minor impacts. The computers are moved to a burn-in area after the assemblyline shock test. Here computers are put in racks for a 24-hour 25 ° C "burn-in" of the circuit components. After burn-in, the computer is tested again, software is installed, and the finished notebook computer is packaged and placed on pallets.

Tweaking the Initial Assembly Line Design

From past experience Toshihiro has found that the initial assemblyline design supplied by the engineers often needs to be tweaked. Consider the following questions that Toshihiro is considering:

1 What is the daily capacity of the assembly line designed by the engineers?

2 When it is running at maximum capacity, what is the efficiency of the line?

3 How should the line be redesigned to operate at the target 300 units per day, assuming that no overtime will be used? What is the efficiency of your new design?

4 What other issues might Toshihiro consider when bringing the new assembly line up to speed?

Reference no: EM13859274

Questions Cloud

Design an algorithm to input student records : Design an algorithm to input student records; each record contains a student name, registration code, and credits field. A registration code of 1 indicates that the student is a resident. A registration code of 2 indicates that the student is a nonre..
Combinatorics-passing by reference : Create a new project (called, for example, "homework05"), for this assignment. Do not use spaces in the name. Follow the same process as you did in the first assignment; if you need a refresher, please refer back to Homework 1.
Use matlab to verify the central limit theorem : Use Matlab to verify the central limit theorem for the sum of N independent exponential RVs (with a=0 and b=2) for N= 10 and 20. Repeat for the sum of N independent Weibull RVs (with a=1 and b=4). Comment on the fit to the approximate Gaussian pdf..
Write an algorithm for the hangman game : 1 Write an Algorithm for the Hangman game(include step by step instructions for the game)2 Variable list for Hangman    Variable Name           Data Type        What it holds
What is the daily capacity of the assembly line : What is the daily capacity of the assembly line designed by the engineers? When it is running at maximum capacity, what is the efficiency of the line
What is the annual dividend on the preferred stock : Story Inc. has 5,000 shares of 6%, $100 par value, cumulative preferred stock and 50,000 shares of $1 par value common stock outstanding at December 31, 2013. What is the annual dividend on the preferred stock?
What is the assembly-line efficiency? : What is the assembly-line efficiency?
Why cap on price of gasoline would hurt middle class people : Explain to truck drivers why a cap on the price of gasoline would hurt middle class people more than the high price of gasoline hurts.
Calculate the bending moment and shearforce diagrams : Matlab code that will calculate the bending moment and shearforce diagrams for the attached file. It must be possible to input lengths,udl values fro each element and the programme must calculate the reaction forces at A,B,C

Reviews

Write a Review

Case Study Questions & Answers

  From the scenario, prioritize the attributes of golds reling

From the scenario, prioritize the attributes of Golds Reling's brand from the brand map presented in the scenario according to the attributes that you believe would be most important to the new tablet's target market. Provide support for your respons..

  Discuss critically infosys current and future strategy

Discuss critically Infosys current and future strategy. What advice would you give Kris Gopalakrishnan and KShop has resulted in information overload among staff. What operational measures would you suggest to overcome such challenges?

  Review tarmac business case for diversity

Review Tarmac's Business Case for Diversity and the Learning Resources. Think about Tarmac's approach to managing diversity and how it relates to organisational behaviour concepts and human resource processes.

  Enron case shared activity

Enron was the first nationwide natural gas pipeline network in the United States. As the company grew, executives shifted the company's primary focus from energy delivery and infrastructure to investing in the stock market.

  Ebay inc internet success or fairy tale

Read the case study "eBay Inc.: Internet Success or Fairy Tale? "and answer the question below,   Use the 2002 financial statement data to replicate the Meyer's report calculations that illustrate the conclusion based on the 2001 data reached in the ..

  Mintendo game girl case study

Which option delivers the maximum profit for the supply chain: Sandra's plan, Bill's plan, or no promotion plan at all? How does the answer change if a discount of $10 must be given to reach the same level of impact that the $5 discount received?

  Splash soft drinks case study

Splash Soft Drinks Inc. (SSD) has recently achieved sales that exceeded its expectations after it introduced a new beverage that was greatly welcomed by their customers. The company is currently considering opening a new plant to which some of the pr..

  Details of the task using tesco plc

Details of the task Using Tesco plc (www.tesco.com) as a case study, prepare a report of no more than 2,500 words that:

  What are the common manifestations of alcoholic cirrhosis

What are the common manifestations of alcoholic cirrhosis? Which of these are secondary to hepatocellular failure? Which are secondary to portal hypertension?

  Judge the extent to which the marketing plan at just us

From the case study, judge the extent to which the marketing plan at Just Us! is outdated. Propose two (2) ways that Just Us! could improve the customer experience and thus sustain future growth.

  Read natasha kingery case and answer the questions

Read the DATA CASE on pages 126-127 about Natasha Kingery who is considering furthering her education and is seeking financial advice. Determine the interest rate she is currently earning on her inheritance by going to Yahoo!

  Identify the relevant facts of the case study

Imagine you are the financial controller of XYZ Ltd a corporation that is a very large donor to HOHO. You have recently become aware that its TV advertising has resulted in the charity violating the 25% expenditure ratio for its charity drive.    Id..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd