Q1. Darlene, Inc. manufactures item "B500" per the design and specification of its customers, and accordingly uses the job order costing system. In March 2022, it finished 10,000 pieces for a customer at a cost of P50.00 per unit for direct materials and P40.00 per unit for direct labor. Factory overhead is applied at 100% of direct labor cost. The production incurred 500 defective units due to an error in the specifications made by the customer and that had to be reworked at a direct labor cost of P10.00 per unit.

If the customer is billed at 25% above cost, how much is the billing price?

Q2. War Room Company manufactures fire extinguisher per the design and specification of its customers, and accordingly uses a job order cost system. In March 2015, it finished 50,000 pieces for a customer at a cost of P1,500 per unit for direct materials and P1,000 per unit for conversion costs. The production incurred 500 defective units due to an error in the specification made by the customer and had to be reworked at a cost of P200 per unit. No allowance for rework is included in the budgeted overhead.

If War Room wants to maintain a 30% gross profit rate, how much is the selling price per unit?

Q3. On January 1, there were two jobs in process at Worship Printing Company. Details of the jobs are:

Job A-15: DM - 8,700; DL - 3,200

Job A-38: DM - 1,600; DL - 4,200

Materials inventory at January 1 totaled P46,000 and P5,800 in materials were purchased during the month. A requisition for P800 in supplies was filed. On January 1, finished goods inventory consisted of two jobs: Job No. A-07 costing P19,600 and Job No. A-21 costing P7,900. Both jobs were sold during the month. Also during January, Job Nos. a-15 and A-38 were completed. Completing Job No. A-15 required additional P3,400 in direct labor and P1,500 in direct materials. The Job No. A-38 completion costs included an additional P5,400 in direct materials and P10,000 in direct labor. Job No. A-40 was started during the period but was not finished. A total of P15,700 of direct materials were brought from the storeroom during the period and total direct labor costs for the period amounts to P20,400. Factory overhead was applied at 150% of direct labor costs to all of the jobs.

What is the cost of job completed in January?

Reference no: EM133129906

Questions Cloud

Experience of the audience and community : In what ways does the contoller of distribution affect the shared experience of the audience and community? Community meaning local and global.
Enjoying near total dominance in the market : This case study focuses on the pay-for-viewing TV (Pay TV in short) industry in Australia.
Large gains in insurance coverage : One of the goals of the Affordable Care Act (ACA) was to increase insurance coverage in the United States. This was accomplished through a variety of policies:
Determine the optimal number of units to put in a package : A monopoly is considering selling several units of a homogeneous product as a single package. Analysts at your firm have determined that a typical consumer's de
What is the cost of job completed in January : Materials inventory at January 1 totaled P46,000 and P5,800 in materials were purchased during the month. What is the cost of job completed in January
Explain the meaning of the term elasticity : Explain the meaning of the term elasticity. Use your results to report the elasticity of output with respect to changes in capital.
What is the actual OH : If applied OH is 100 while COGS at actual cost is 800. COGS at normal cost is 820. What is the actual OH? Any under over applied OH is immaterial
Operating expenses expected to be generated : A machinery that costs $100,000, has a service life of 5 years and a salvage value of $10,000 at the end of service life. The Gross Income - Operating Expenses
How globalization relates to the practice of outsourcing : a. Discuss how globalization relates to the practice of outsourcing.

Reviews

Write a Review

Cost Accounting Questions & Answers

  Make the appropriate journal entries for spoilage

Make the appropriate journal entries for spoilage for the three independent cases given below. Also calculate the average cost of one good unit of chair

  Library research assignmentassuming that you are the

library research assignmentassuming that you are the controller for a publicly traded company your cfo has asked you

  What is the corporate bond value

AMCOR Limited, payments will be repaid, without interest, at maturity. What is the corporate bond's value (the price for AMCOR's bond)?

  Your organization city rehab has been approached by an mco

your organization city rehab has been approached by an mco looking for an exclusive arrangement for the rehabilitation

  How much input tax credit could be claimed

The total cost of the acquisition was $26,500 (GST inc). How much input tax credit could be claimed. What would be the BAS code for the acquisition

  Explain which method is better for the company being discuss

Explain, with the help of an example, how a company could use a variable costing system, as well as an absorption costing system. Explain which method is better for the company being discussed.

  Prepare one for the molding department

Using the weighted average method, prepare two production reports: one for the Molding Department and one for the Assembly Department.

  1a management that wanted to increase the financial

1.a management that wanted to increase the financial leverage of its firm wouldnbsp1.nbspnbspnbspnbspnbspnbspnbsp raise

  Journalize the september transactions - rand equipment

Prepare a trial balance at September 30, journalize and post adjusting entries and prepare an adjusted trial balance.

  Calculate npv

Discount tables for several different interest (discount) rates that are to be used in any discounting calculations are given below. Assume for questions 2-6 that Hilltop is not subject to income taxes.  If Hilltop requires investments to earn an 8% ..

  Estimate of the mean number of days

Construct a 95% confidence interval estimate of the mean number of days between the receipt of a complaint and the resolution of the complaint.

  What is the eup for materials

What is the EUP for materials? The quality control inspection takes place when the units are 75% completed and materials are added at the start of the process.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd