What is the conversion rate for parts per million by volume

Assignment Help Civil Engineering
Reference no: EM13534554

1.a)Find the change in currents due to change of voltage by (a)5mv, (b) -10mv, (c) 15mv using small signal model and exponentialmodel of diode with n= 1 and biased at 2mA.

b)A step up transformer has the turn ratio of2:5, find the secondary voltage of transformer ifprimary voltage given is 240 Vac.

2.What surveying observations does a contractor need to lay a 36 inch diameter pipe?

3.What is the conversion rate for parts per million by volume (ppmv)conversion. How is this converted into atm, Pa, and torr?

Reference no: EM13534554

Questions Cloud

Estimate the evaporation volume for the month : The pedestal supports a load P at its center. If the material has a mass density p, determine the radial dimension r as a function of z so that the average normal stress in the pedestal remains constant. The cross section is circular.
What is the mean annual volume of rainfalling on the water : The mean anual rainfall depth over a 280 km2watershed is 725 mm. What is the mean annual volume of rainfalling on the watershed in m3 ?
Calculate the corrected distance : When measuring a distance AB, the first taping pin was placed 1.5ft to the right of line AB and the second pin was set 1.5 ft leftof line AB. The recorded distance was 236.89 ft. ( Assume 3 tapedsegements, the first two 100 ft each.) Calculate the co..
What is the length of the core in inches if the diameter is : If the porosity of a core sample is 26 percent, the pore volume is7.7 cc, what is the length of the core in inchesif the diameter is 1.5 inches?
What is the conversion rate for parts per million by volume : What is the conversion rate for parts per million by volume (ppmv)conversion. How is this converted into atm, Pa, and torr?
Calculate specific surface : Immediately after the bouncing golf ball leaves the floor itscomponent of velocity are Vx= 0.662 m/s and Vy= 3.66 m/s. determinethe horizontal distance from the point where the bal
Is the fluid accelerating uphill : A fluid with a specific weight of 100lb/ft^3 and a negligibleviscous effects flows in a pipe. The pipe is inclined at 30degrees. Point (1) is located above point (2) in the pipe.
Show that 1 millimeter of the 0.02 n h2so4 solution : A load of 14 tonnes is suspended at the end of a steel rope.If the load is subjected to a maximum acceleration/deceleration of2.5m/s2, when raised and lowered, calculate the diameter of therope needed to support the load. Assume the following:
Compute the pressure at a point in a building : A rectangular culvert 4 feet x 6 feet is running full and discharging 3,500 cfm. There is no friction loss. Find the velocity in fps. The culvert empties into a 10 ft wide culvert and the velocity reduces to 0.6 fps. How deep is the water level in th..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the placement d of the column at b

The concrete girder supports the two column loads. If the soil pressure under the girder is assumed to be uniform, determine its intensity w and the placement d of the column at B.

  What is the diameter d of the smallest -size particles

in a hydrometer test , the results are as follows:Gs =2.60 , temperature of water=24c ,and R=43at 60 min after the start of sedimentation . what is the diameter , D, of the smallest -size particles

  Determine the size of pipe for a water temperature

The difference in water level is 60ft. Determine the size of pipe for a water temperature of 60 degrees Fahrenheit. Apply The Darcy-Weisbach equation.

  Formulate the shear and bending moment expressions

Show/formulate the shear and bending moment expressions for each board, and plot/draw the shear and bending moment diagrams of the boards.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  How long the train blocked the crossing

Assuming constant acceleration, determine how long the train blocked the crossing. Dis- regard the width of the crossing.

  Calculate the efficiency of an esp required to meet federal

Assume that 30% of the ash falls out as bottom ash in the furnace. Calculate the efficiency of an ESP (electrostatic precipitator) required to meet federal new source performance standards

  When will the queue clear

where u(t) is in vehicles per minute and t is in minutes. When will the queue clear?

  Determine what is the ice point of water in the scale

Devise an absolute temperature scale where the boiling point of water at 1 atmosphere (101 kPa) pressure = 100 degrees in your scale. What is the ice point of water in your scale

  Determine required value for m to 2 m wide rectangular gate

A 1 m diameter mass, M is connected to a 2 m wide rectangular gate. The gar is to open when the water level ,h, drops below 2.5 m. Determine the required value for M.

  Determine the required pumping rate of the construction

It is required to dewater a construction site 80 m by 80 m. The bottom of the construction will be 1.5 m below the initial water surface elevation of 90 m. Four pumps are to be used in 0.5-m diameter wells at the four corners of the site.

  What is the equivalent amount in year 10 of an expenditure

What is the equivalent amount in year 10 of an expenditure of $5,000 in year one, $8,000 in year two, and increasing by $1,000 per year through year 10 Assume the interest rate is 10% per year.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd