What is the concentration of mlvss in the activated sludge

Assignment Help Civil Engineering
Reference no: EM13313453

The half-saturation constant (kinetic constant) of the Monod model which governs the reactions in the activated sludge system is 90 mg COD L-1. The concentration of Chemical Oxygen Demand (COD) in the effluent from this system is 25 mg L-1. The growth rate of the organisms in this case is 0.9 days-1. The activated sludge tank has a volume of 50 m3 and the flow rate through it is 500 m3 day-1. The organism  concentration is measured as MLVSS (mixed liquor volatile suspended solids) and they are being produced at a rate of 150 mg MLVSS L hour at steady state. For this problem assume that the death rate in the process is zero (kd = 0.0) -1 -1

(a) What is the maximum specific growth rate of the organisms (day-1)

(b) What is the concentration of MLVSS in the activated sludge (mg L-1)

(c) What is the sludge wastage rate (kg day-1)?

(d) If the yield coefficient (mass suspended solids produced/mass substrate removed) of the system is 0.8, what is the concentration of COD (mg L-1) in the influent?

Reference no: EM13313453

Questions Cloud

What would be the absolute pressure of carbon dioxiode : What would be the absolute pressure, P in kPa, of carbon dioxiode at 20 degrees celcious if the specific weight of carbon dioxide at 20 degrees celcious is 18 N/m^3 and the gas constant, R =1.889x10^2 J/kg*K.
Explain the equilibirum approach to calculate the ph : Need some assistance: 2a) Calculate the pH of a buffer solution that is 0.250 M in HCN and 0.170 M in KCN. For HCN, Ka = 4.9 x 10^-10 (pka = 9.31). Use the equilibirum approach to calculate this pH
What is the concentration of cod in the effluent : The maximum specific growth rate of the organisms driving this reaction is 5.0 days -1 and the growth rate is 0.54 day-1. The activated sludge tank has a volume of 40 m3 and the flow rate into it is 400 m3/day.
Calculate the magnitude of the frictional force : Two blocks with masses M1=7.90kg and M2=1.20kg are attached by a thin string which goes over a frictionless, Calculate the magnitude of the frictional force acting on M1
What is the concentration of mlvss in the activated sludge : The concentration of Chemical Oxygen Demand (COD) in the effluent from this system is 25 mg L-1. The growth rate of the organisms in this case is 0.9 days-1. The activated sludge tank has a volume of 50 m3 and the flow rate through it is 500 m3 da..
Explain the most mechanism of reactivity for the solvoysis : The most probable mechanism of reactivity for the solvoysis of 2-chloro-norbornane is: a. Sn1 b. Sn2 c. E1 d. E2 The reaction for this secondary compound was very slow going compared to solvolysis of benzyl chloride
What is the speed at which the satellite travels : A satellite is in a circular orbit about the earth (ME = 5.98 x 1024 kg). The period of the satellite is 2.11 x 104 s. What is the speed at which the satellite travels
Find the energy stored in the capacitor when fully chaged : A 0.350-{\rm m}-long cylindrical capacitor consists of a solid conducting core with a radius of 1.25mm, Calculate the energy stored in the capacitor when fully charged
Determine max value of dz if the flow is to remain laminar : The slope of the hill is such that for each 1.5 km of horizontal distance, the change in elevation is dz meter. Determine the maximum value of dz if the flow is to remain laminar, with a temperature of T=20°C and pressure all along the pipe is con..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Which project will company choose on present value criteria

A company facing an interest rate of 8% must choose among projects offering the following four-year cash flows. If the company is employing the net present value criterion, which project should they choose

  Determining the crest and sag vertical curves

Determine, for the crest and sag vertical curves required, the stationing and elevation of the PVCs and PVTs given that the PVC of the crest curve(on westernmost level highway section) is at station 0+00 and elevation 100 ft.

  Determine what is the length of the smooth pipe

Straight pipe, pump head=100 ft, pipe diameter=4inches, velocity is 10 ft/sec, no elevation changes. Water at 20C. What is the length of the smooth pipe

  What is the required length of the curve

The back tangent gradient is -4 percent, the forward tangent gradient is 2 percent, and the elevation of the curve at station 48+50 must equal to at least 510ft. What is the required length of the curve?

  Find the force ratio equation

How do you find the force ratio equation to determine the maximum total load that can be applied to a truss?

  Develop preliminary wbs for small one-story to be construct

The exterior and interior walls are of concrete block. The roof is constructed of bar joists covered with a steel roof deck, rigid insulation, and built-up roofing.

  What are slack variable in linear programming constraint eqn

what is a dummy activity and slack activity and also what are slack variables in linear programming constraints equation

  Find the height and the width of the triangular soil bank

The soil's angle of repose is 35° and its swell is 25%. Find the height and the width of the triangular soil bank that will result from the trench excavation

  Sample of natural glacial-groundwater table

A sample of natural glacial till was taken from below the groundwater table. The water content was found to be 52%. Estimate the wet density, dry density, buoyant density, porosity and void ratio. Clearly state any necessary assumptions.

  Determine effective annual interest rate for a nominal rate

Determine the effective annual interest rate for a nominal rate of 8% per year, in which is compounded quarterly.

  Determine the distances the spacecraft must be from earth

consider a spacecraft that is positioned directly between the earth and moon.the mass of the moon's is approximately 7.35 X10^22 kg, and at the instant under consideration, the moon is 3.8 X 10^8 km from earth.

  Determine what is the deflection at the center of the beam

A C10x20 catilever beam is 12 feet long, supported on the right side. The beam supports two point loads: Load 1 is 2500 lbf and is located 2.5 feet from the wall. Load 2 is 1300 lbf and is located 12 feet from the wall.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd