Reference no: EM131446739
Braxton Corp. has no debt but can borrow at 6.2 percent. The firm’s WACC is currently 8 percent, and the tax rate is 35 percent.
a. What is the company’s cost of equity? (Do not round intermediate calculations. Enter your answer as a percent rounded to 2 decimal places, e.g., 32.16.)
b. If the firm converts to 20 percent debt, what will its cost of equity be? (Do not round intermediate calculations. Enter your answer as a percent rounded to 2 decimal places, e.g., 32.16.)
c. If the firm converts to 50 percent debt, what will its cost of equity be? (Do not round intermediate calculations. Enter your answer as a percent rounded to 2 decimal places, e.g., 32.16.)
d-1 If the firm converts to 20 percent debt, what is the company’s WACC? (Do not round intermediate calculations. Enter your answer as a percent rounded to 2 decimal places, e.g., 32.16.)
d-2 If the firm converts to 50 percent debt, what is the company’s WACC? (Do not round intermediate calculations. Enter your answer as a percent rounded to 2 decimal places, e.g., 32.16.)
Using the covered interest arbitrage theory
: Suppose the spot pound and the 90-day forward pound are both selling for $1.65, while the U.S. interest rates are 10 percent and British interest rates are 6 percent. Using the covered interest arbitrage theory, describe what will happen to the spot ..
|
Risk free rate-market risk premium and beta
: We talked at lenght about the CAPM formula and how we can use it to compute the Required Rated investors would need to invest in a company's stock (or equity). The Formula is Rs=Risk Free Rate+Market Risk Premium *Beta. How do we derive the 3 input v..
|
What is the spot rate for the british pound
: What is the spot rate for the British pound (GBP) on Wednesday in terms of the U.S. dollar (USD)? Or, from the U.S. perspective, what is the direct quote on pounds?) Calculate the annualized forward premium or discount on six-month forward yen (need ..
|
Calculate the eac for both conveyor belt systems
: Lang Industrial Systems Company (LISC) is trying to decide between two different conveyor belt systems. System A costs $264,000, has a four-year life, and requires $81,000 in pretax annual operating costs. Calculate the EAC for both conveyor belt sys..
|
What is the companys cost of equity
: Braxton Corp. has no debt but can borrow at 6.2 percent. The firm’s WACC is currently 8 percent, and the tax rate is 35 percent. What is the company’s cost of equity? If the firm converts to 50 percent debt, what will its cost of equity be?
|
We covered a lot of material over the past several weeks
: We covered a lot of material over the past several weeks. For your discussion forum for this week simply let me know your thoughts on what was the most important concept or concepts that you learned from Finance 300.
|
Financial analysis project
: The Company that you work for has excess capital that needs to be invested. Because you have knowledge of managerial finance, the top management team of the organization has given you the assignment to conduct a thorough financial analysis on a publi..
|
Company incentive plan does not have guaranteed wage
: A worker is paid the day-work rate if she earns less than 100% incentive premium. The standard for producing a certain part is 85 units per hour. The operator completes 140 good parts. What are her earned hours? What would her pay for this time perio..
|
Peng plasma pricing
: Peng Plasma Pricing. Peng Plasma is a privately held Chinese business. It specializes in th manuifacture of plasma cutting torches. Over the past eight years it has held the Chinese renminbi price of the PT350 cutting torch fixed at Rmb 17.300 per un..
|