Reference no: EM132909363
Berkeley Manufacturing Company (BMC) employs a four-step production process to produce metal-alloy-coated precision parts. The first step is fabrication. The fabrication machine takes 7.5 minutes per unit to mold raw material into the proper shape of a part. The second step is coating. The coating machine applies a layer of one of many metal alloys at high heat. The coating machine takes 24 minutes, and it can coat up to six units of parts(of the same metal alloy) at a time. The third step is cooling. It takes 50 minutes for a coated part to cool. No equipment is required for this step, and there is plenty of cooling space. The fourth step is polishing, which takes 5 minutes per part. For simplicity, we assume the production system operates continuously (i.e., 24 hours a day) and that the system has been running for some time.
A) Currently, BMC is following a production sequence in which each part produced is a coated with a different alloy than the last one(e.g., an aluminum-alloy part is followed by a titanium-alloy part, which is followed by a bronze-alloy part, etc.). As a result, the coating machine can coat one unit at a time. What is the capacity of the production process?
B) In February, BMC purchased an additional polishing machine. What is the capacity of the production process now? Explain why it has (or has not) changed from your answer to Question A.
C) In March, BMC changed to produce parts in batches of two (e.g., produce two aluminum-alloy parts in one batch, followed by a batch of two titanium-alloy parts, which is followed by a batch of two bronze-alloy parts, etc.). What is the capacity of the production process now(assume no setup time for each batch)? Explain why it has (or has not) changed from your answer to Question B.
D) In April, BMC purchased a second coating machine. (BMC continues to produce parts in batches of two.) What is the capacity of the production process now? Explain why it has (or has not) changed from your answer to Question C.
E) In April, BMC installed fans throughout the cooling space which reduced the cooling time to 15 minutes. What is the capacity of the production process now? Explain why it has (or has not) changed from your answer to Question D.
What is the present value of the annuity
: What is the present value of the annuity in (a) if you have to wait an additional year for the first payment? Do not round intermediate calculations
|
How have you recognized the elements of caring-faith
: How have you recognized the elements of caring-faith, hope, love and tending, playing, and learning-in a concrete caring situation? Give examples.
|
What is the service rate of each trappy machine
: UP Fitness will install 3new "trapezoidal gel-resistance toners" ("trappy" for short), the latest exercise gadget, specifically designed to contour upper back m
|
Make a schedule for each month showing budgeted cash
: All units are sold on account for $15 each. Make a schedule for each month showing budgeted cash disbursements for Clay Company
|
What is the capacity of the production process
: Berkeley Manufacturing Company (BMC) employs a four-step production process to produce metal-alloy-coated precision parts. The first step is fabrication. The fa
|
Explain-hypothalamic-pituitary-thyroid axis
: Explain-Hypothalamic-Pituitary-Thyroid axis and interrelationship. What is the likely diagnosis, and what symptoms made you consider that diagnosis?
|
What is the shop current average inventory level
: One of the top-selling items at a gift shop at Hilo, HI are autographed pictures of Jack Star. Sales are 18 pictures per week, and the supplier charges $60 per
|
Artificial intelligence to stop school shooting
: How can we use Artificial Intelligence (AI) to stop school shooting?"
|
Identify the cardiovascular and microvascular risk factors
: Identify the cardiovascular and microvascular risk factors in the history, physical examination, and laboratory data in this patient.
|