What is the best procurement route

Assignment Help Project Management
Reference no: EM132302116

Contract and Procurement management

Assessment: Case Study

Introduction:

Recently, Central Queensland University (CQU) has achieved a high ranking record (Well above average) in research excellence in various disciplines including Engineering. As a result, increasing number of students are expected to apply and join CQU in all campuses mainly Melbourne Campus.

CQuniversity has acquired this property (it is now CQU) and intends to construct a unique campus to meet the increasing student's numbers as well as to provide a proper university life within the Melbourne campus. CQU has high expectations to achieve.

Project Elements:

CQU is looking forward to including the following elements in the new project:
1. Main lecture's building (can accommodate 300 Students)
2. Computer and engineering Laboratories
3. A Motel where it can accommodate staff and visitors coming for across other campuses (up to 50 rooms).
4. Conference hall with up to date facilities and infrastructure (250 people)
o The work is intended to take place in phases giving the following facts:

The CQU Requirements:
1) CQU has already got the land and its under the university control.
2) CQU has high expectations to get an innovative and high quality project.
3) All project parts (elements) to be completed simultaneously within the timeframe (ASAP)
4) CQU has not got good experience in this type of development .Therefore CQU has appointed your consultancy firm called PPMP20011 Company to MANAGE the project on its behalf.
5) Your firm (PPMP20011) is an experienced consultancy firm who provides good and in-depth advices to clients on how to proceed and what can be done and what cannot upon evaluation of the project elements and project constraints

Your Task As PPMP20011 Management Consultant Company

You are the construction manager to the CQuniversity and you are asked to advise CQU on the following:

Under the current conditions explained above, you need to respond to the following:

Task

What is the best procurement route (method) your PPMP20011 consultant company will advise CQ to follow keeping in mind the constraints and priorities as well as the experience of CQU as project owner

Why do you think this is the best route (giving the project factors).Justify your selection

What is the advantages of this route over other routes (traditional/non-traditional)

What are the risks associated with this selected rout for both the owner and the contractor

How does this route will satisfy the main points (Cost, time, and Quality).

Select the best contract type for this project (Fixed price (lump sum, unit price etc.) Or reimbursement (CPF, CPFF, etc...)

Attachment:- Case Study.rar

Verified Expert

This document is regarding the procurement routes that a company can adopt while implementing construction projects. Pros and cons of each route are provided with detailed explanation of specific route which is best according to the requirements.Different types of contracts are also explained.

Reference no: EM132302116

Questions Cloud

Population sample and regular sample in daily life : What is the difference between the population sample and regular sample in daily life?
What are the segments of the general environment : Choose the two (2) segments of the general environment that would rank highest in their influence on the corporation you chose. Assess how these segments.
Find the correct critical value for the given a-level : What is the most he will ever have to order? (Use Excel's NORMSINV() function to find the correct critical value for the given a-level.
What mistakes do companies make when developing strategies : Prior to beginning work on this discussion forum, read Five Steps to a Strategic Plan, The Single Strategy You Need to Fuel Business Growth Right Now.
What is the best procurement route : PPMP20011 - Contract and Procurement management - Central Queensland University - What is the advantages of this route over other routes
Define total quality management : Define total quality management and how it relates to the companies. Compare/Contrast.
What are the five major categories of pricing strategies : What are the five major categories of pricing strategies? Give at least two examples of specific strategies that fall into each category.
Which factor determines the absolute size of the multipliers : Which factor determines the absolute size of the multipliers? What does this mean for the impact of changes in taxation, in the model but also when you consider
Difference between manufacturer brands and store brands : What is the difference between manufacturer brands and store brands? Between family branding and individual branding?

Reviews

len2302116

5/9/2019 2:30:35 AM

must follow each line of cast study with proper referencing and facts and figure with attractive to gain near to 75% marks. give your rate with words how many word is enough for this assignment? and give rate with words as well as one saperate rate for PPT also.

len2302116

5/9/2019 2:30:14 AM

This work includes an Oral presentation (10% scaled) • Preparation and consistency of presentation (10%) • Understanding and relevance of the presentation content (40%) • Set up and use of visual aids, including PowerPoint slides (10%) • Timing including Q&A (5%) • Response to Questions during Q&A (30%) • Presentation manner (5%) Failing to present will result in ZERO grade. Details about presentation times and slots will be announced closer to the time

len2302116

5/9/2019 2:30:07 AM

Hint: You may use different type of contracts for different project component This means (lecture building could have different contract than the laboratories and the Motel and others) Expected Outcome from PPMP20011 Company: • You are expected to discuss at least four main procurement routes (i.e DBB, DB, Management …..) • You are expected to apply each route to explain the above 6 main points to • Highlighting advantages and disadvantages of each route as well as how each route can meet the three main constrains by the owner • Recommend the BEST ROUTE according to the CQU priority list. • For the recommended route you are expected to explain the contractual arrangement through drawing a diagram show the contractual relationship among the CQU, PPMP20011, Contractor, subcontractor

len2302116

5/9/2019 2:29:56 AM

If you recommend a specific procurement route, what are the risks associated with this route from CQU pointview (owner). What are risks from contractor view Explain in details what the methodology (procedure is) What type of contract you recommend (based on the selected route) Why do you think this is a suitable contract Advantages/disadvantages and how this satisfy the project requirement and element Make sure CQU look for high quality with priority to time and cost Justify how this can be the best contract type

len2302116

5/9/2019 2:29:42 AM

You may need to summarise this in a group of factors including but not limited to : 1- Time 2- Cost 3- Quality (level of service) 4- Changing orders 5- Claims 6- Risk 7- Management capacity and ability/experience 8- Responsibility and other issues Explain advantages and disadvantages of the recommended route Why do you think this a good route over others in the case of the CQU

len2302116

5/9/2019 2:29:36 AM

must follow each line of cast study with proper referencing and facts and figure with attractive to gain near to 75% marks. give your rate with words how many word is enough for this assignment? and give rate with words as well as one saperate rate for PPT also. Expectations Report to address different routes and compare them based on the below elements. Explain each route in details (how does it work) What is its advantages/disadvantages of each Risks associated with it How this route can be good/ bad in the case of CQU Reflect on the constraints and the CQ experience

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd