Page Engineering designs and constructs air conditioning and heating systems for hospitals and clinics. Currently, the company's staff is overloaded with design work. There is a major design project due in 8 weeks. The penalty for completing the design late is $14 000 per week, since any delay will cause the facility to open later than anticipated, and cost the client significant revenue. If the company uses its inside engineers to complete the design, it will have to pay them overtime for all work. Page has estimated that it will cost $12 000 per week (wages and overhead), including late weeks, to have company engineers complete the design. Page is also considering having an outside engineering firm do the design. A bid of $92 000 has been received for the completed design. Yet another option for completing the design is to conduct a joint design by having a third engineering company complete all electromechanical components of the design at a cost of $56 000. Page would then complete the rest of the design and control systems at an estimated cost of $30 000.
Page has estimated the following probabilities of completing the project within various time frames when using each of the three options. Those estimates are shown in the following table:
Option On Time Week Late 2Weeks Late 3Weeks Late
Internal Engineers .4 .5 .1 -
External Engineers .2 .4 .3 .1
Joint Design .1 .3 .4 .2
What is the best decision based on an expected monetary value criterion? (Note: You want the lowest EMV because we are dealing with costs in this problem.)
Illustrate what effect should a realistic job preview have on a new hire's attitude also behaviour.
A manufacturing operation must periodically purchase bulk quantities of washers. The washers are purchased in boxes of 400 and are consumed at a constant rate.
If it were necessary to crash to 250 or 240 days, Elucidate how would Hill do so also at illustrate what costs. As noted in the case, suppose that optimistic time estimates can be used as crash times.
Any equipment which is in need of repair or replacement is removed for off-site service (or replacement) prior to the next day. Illustrate what Principles of Operations Management are supported by this policy.
Give an example of a good decision you made that resulted in a bad outcome or an example of a bad decision you made that had a good outcome. Why was the decision considered good or bad?
What do you think about this situation? Should parties to a sales contract be able to rescind a contract because of mutual mistake of fact? Why or why not? Did either party act unethically in this case?
Compare and contrast the 2 moral philosophies, teleology and deontology. Explain how each philosophy type would use their beliefs/philosophy to evaluate the morality of a particular activity.
Illustrate what is the possible daily output of this "process" if 8 hours of processing time is available each day. Given your output in part a, illustrate what is the efficiency of the process.
Analyze the flow chart drawn above utilizing the basic question. Suggest improvements for increasing the efficiency or effectiveness of the above chosen function.
A furniture company manufacture desk and chairs. . Given that the profit per chair is $50 and that of the desk is $100, determine the optimal production mix for the company.
The solution offers step by step guidance on how to formulate the problem mathematically. It comprises a solution to problem instance using Excel Solver.
An airplane flew for 4.23 hours with a 25.5-km/hr tail wind. The return flight against the same wind took 4.97 hours. Find out the speed of the plane in still air.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd