Q: Which of the following statements about the Emergency Change Advisory Board (ECAB) is CORRECT?

It will be used for emergency changes where there is insufficient time to call a full CAB.

It will review completed emergency changes.

It will consider every high priority Request for Change.

It will be chaired by the IT Director.

Q: Which of the following is NOT a type of change?

Normal Change

Standard Change

Matrix Change

Emergency Change

Q: Which of the following has the responsibility to filter, accept, and classify all Request For Change (RFC)?

Change Director

Incident Manager

Change Manager

Problem Manager

 

Q: Which of the following processes governs each release via a request for change?

Capacity Management process

Service Management process

Incident Management process

Change Management process

 

Q: Which of these is part of the scope of IT change management?

Business strategic changes

Project changes

IT service changes

Minor operational changes

 

Q: Which of the following is defined as the major object or the entity that is used to instantiate a change?

Customer Request

Service Request

Urgent Change

Request for Change

 

Q: Which process ensures that standardized methods and procedures are used for efficient handling of all changes?

Incident management

Change management

Request management

Risk management

 

Q: Who should initially evaluate the category of a proposed change within an ITIL compliant Change Management process?

Change Advisory Board

Change Requestor

Change Implementer

Change Manager

 

Q: Who should carry out advance testing once a change has been built under an ITIL Change Management process?

Change Builder

Independent tester

Change Advisory Board

Change Manager

 

Q: Which of these statements represent acceptable criteria for defining a standard change?

1. The risk associated to the change is low or clearly understood.

2. The change follows a defined procedure or predefined steps.

3. The change can be completed within 24 hours of being requested.

4. The change can be traced to a predefined trigger.

5. The change delivers its results to IT service providers only.

1, 2, and 4

2, 3, and 4

1, 2, 3, 4, and 5

1, 3, and 5

 

Q: Which of the following requests is used to replace something within the IT infrastructure?

Request for change

Replacement request

Service Request

Request for Release

 

Q: Which process has the scope of covering changes to baseline service assets and configuration items across the complete service lifecycle?

Configuration management

IT management

Service management

Change Management

 

Q: Which of these is a recognized "business benefit" or "value statement" for the service transition lifecycle stage?

1. Deliver changes to services with a consistent approach

2. Manage the business strategic plans

3. Control the assets of the infrastructure

4. Improve business strategy through service transformation

5. Provide increased confidence in the success of changes

1, 3, and 5

1, 2, 3, 4, and 5

1, 2, 3, and 4

2, 4, and 5

 

Q: Which of the following concepts is part of Change Management?

Service Request

Emergency Release

Post Implementation Review

Work-group

 

Q: Which process ensures that the new or changed services are better aligned with the customer's business operation?

Service Strategy

Continual Service Improvement

Service Design

Service Transition

 

Q: Which of these would be a reason to raise a change proposal for authorization?

If the change has been raised by a user

If the change has been assessed as being technical

If the change has a major cost impact on the business

If the change has been assessed by a supplier

 

Q: Which of the following is a cumulative body that is used to access, prioritize, and plan changes?

Change Advisory Board

Compliance

Accreditation Body

Baseline

 

Q: Which of these is a valid reason for closing a change record?

The change has been authorized and implemented.

The change has been released.

The release has been implemented.

The change acceptance criteria have been met

 

Q: Which of these statements best reflects the purpose of change management?

To provide success strategies for the business

To provide controlled change

To deliver successful projects to operations

To deliver an accurate configuration management system

 

Q: Which of these statements is the best description of the purpose of the service transition lifecycle stage?

Ensure services are measured and improved according to improvement guidelines.

Ensure services are operated according to service level agreements.

Ensure services are designed to meet business expectations.

Ensure services agreed on and designed in strategy and design are delivered effectively into operation

 

Q: Which of the following is NOT a Change Management activity?

It changes an action that results in a new status.

It provides updates to the Configuration Management Database.

It provides reports of changes to the infrastructure.

It records, accepts, authorizes, plans, tests, and implements RFCs

 

Q: Which of the following has an objective to ensure that all the changes are assessed, approved, implemented, and reviewed in a controlled manner?

Capacity Management

Change Management

Problem Management

Incident Management

 

Q: Who is responsible for authorizing a request for change as part of the change management process?

Customer

User

Supplier

Change authority

 

Q: Which of the following has the responsibility to ensure that the back-out plans are created?

Capacity Management

Problem Management

Change Management

Incident Management

 

Q: Which of the following manages the rollout of the new releases?

Customer Management

Incident Management

Change Management

Service Management

 

Q: Which of the following processes governs Release Management?

Problem Management

Service Level Management

Configuration Management

Change Management

 

Q: For which of the following processes is the purpose of priorities based on impact and importance of an essential activity?

Service Level Management

Financial Management

Change Management

Configuration Management

 

Q: Which of these is not a recognized output document from the change management process?

Remediation plan

Project service outage

Change schedule

Configuration schedule

 

Q: Which of the following is a formal communication seeking an alteration to one or more configuration items?

Change plan

Change phase

Change advisor

Change request

 

Q: Which of the following is the aim of Change Management?

Reduction in back-out activities

Incident detection and recording

Incident ownership, monitoring, tracking, and communication

Maximum disruption of services

 

Q: Which of the following advises Change Management regarding the priorities of the RFCs?

Accreditation body

Change Advisory Board

Incident Manager

Problem Manager

 

Q: Which of the following is the main purpose of the Service Portfolio is to describe services in terms of?

Service Level Requirements

IT Service Infrastructure

Business Value

Functionality

 

Q: Which of the following is responsible for processing RFCs?

Release Management

Change Management

Service Level Management

Configuration Management

 

Q: Which process is the necessary means to realize, plan, and manage the new service?

Service Operation

Service Design

Service Strategy

Service Transition

 

Q: Which of the following is true about change management?

Low-risk changes may be preapprove

The change advisory board is for technical assessment and approval of changes only.

All changes, however small, must be approved by the change advisory board before implementation.

Emergency changes are too urgent to need approval before implementation

 

Q: What is the benefit of using a change model?

It allows predefined steps to be used when handling similar types of change.

It allows project teams to use the change process for project changes.

It allows the customer to bypass the normal change process.

It allows a change to be accepted into release more easily

Reference no: EM13842848

Questions Cloud

Calculate the formula weight of sucrose : Calculate the formula weight of sucrose
Causes of the downward trend by surveying : Sue Taylor, Director of Global Industrial Sales, is concerned by a deteriorating sales trend. Specifically, the number of customers is stable at 1,500, but they are purchasing less each year. She orders her staff to search for causes of the downwa..
What is the molarity? : What is the molarity?
How and why did the tokugawas isolate japan? : How and why did the Tokugawas isolate Japan?
What is the benefit of using a change model : Which of the following is true about change management. What is the benefit of using a change model
Actionable strategic plan for riordan manufacturing : Prepare a convincing and comprehensive presentation of your team's actionable strategic plan for Riordan Manufacturing, one that would take 20-30 minutes to deliver to the board of directors, including intentional and active board involvement
What are the needs of the priority population : Who is the priority population? what are the needs of the priority population? which subgroups within the priority population have greatest need? where are the subgroups located geographically
Important feature of digital cameras : An important feature of digital cameras is battery life, the number of shots that can be taken before the battery needs to be recharged. The file contains battery life information for 29 subcompact cameras and 16 compact cameras. (Data extracted f..
How they are used for measuring quality : Describe how they are used for measuring quality by at least four professionals in a health care organization. You must include at least one administrative health professional, one midlevel provider, one physician, and one auxiliary staff member

Reviews

Write a Review

Business Management Questions & Answers

  Relationship of leadership to politics of organization

Discuss the relationship of leadership to the politics of the organization. Please be sure to address the following issues.

  Examine the decision-making model

Various elements of critical thinking examine the decision-making model you selected and explain how it influences and/or impacts your proposed solutions

  Motivation for coming off shoringgiven the situation below

motivation for coming off shoringgiven the situation below where an organization has decided to form a team to

  Action plans and goal achievements

How are action plans related to goal achievement. Can goals be achieved without action plans?

  Management decision problems

The following list represents examples of management decision problems. Restate each of these management decision problems to represent marketing research problems.

  Are these notes negotiable instruments

Five years after the notes were executed, Salomon sky and Armstrong claimed which because the notes were negotiable instruments, the statute of limitations on the enforcement of the notes has run. Are these notes negotiable instruments?

  Design operationsyou are the operations managers of a

design operationsyou are the operations managers of a company planning to open a chain of large computer stores in

  What are the key concerns that prevent western mnes

What are the key concerns that prevent Western MNEs from aggressively investing in emerging economies

  Statements is not true about continuous audit

Audit of banks is an example of - a) Statutory audit b) Balance sheet audit c) Concurrent audit d) Both (a) and (b) e) All of the above 2. Concurrent audit is a part of­ a) Internal check system b) Continuous audit c) Internal audit system d) None

  A local law enforcement professional

As a local law enforcement professional, you have been invited as a guest speaker at a local community meeting in which town residents, officials, and other law enforcement personnel may be in attendance. This will be an informational meeting in whic..

  What is needed to break even on the project

The CEO is relying on you to help decide how this project can be afforded Provide details about the estimated product costs, what is needed to break even on the project, and what level of return this product is expected to provide.

  Cross-price elasticity and complements

Cross-Price Elasticity and Complements - Positive cross-price elasticity is said to occur when the demand and price for two products are moving in the same direction.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd