1. Pipeline fluid flows are indicated below. Determine the maximum flow from Node 1 to Node 4.

From

To

Fluid

Node

Node

Flow

1

2

400

2

1

0

1

4

200

4

1

200

1

3

200

3

1

0

2

4

200

4

2

200

3

4

300

4

3

300

  (a) 200

  (b) 300

  (c) 600

  (d) 700

  (e) none of the above

2. Given the following distances between destination nodes, what is the minimum distance that connects all the nodes?

From

To

Distance

1

2

200

1

3

300

1

5

400

2

3

300

2

4

400

3

4

200

3

5

200

4

5

100

4

6

300

5

6

400

  (a) 1000

  (b) 800

  (c) 700

  (d) 1100

  (e) none of the above

Table 13-4

The following represents a project with known activity times. All times are in weeks.

Activity

Immediate

Predecessor

Time

A

-

4

B

-

3

C

A

2

D

B

7

E

C, D

4

F

B

5

G

E, F

4

3. Using the data in Table 13-4, what is the minimum possible time required for completing the project?

  (a) 8

  (b) 12

  (c) 18

  (d) 10

  (e) none of the above

4. Using the data in Table 13-4, what is the latest possible time that C may be started without delaying completion of the project?

  (a) 0

  (b) 4

  (c) 8

  (d) 10

  (e) none of the above

5. Using the data in Table 13-4, compute the slack time for activity D.

  (a) 0

  (b) 5

  (c) 3

  (d) 6

  (e) none of the above

6. Consider a project that has an expected completion time of 50 weeks and a standard deviation of 9 weeks. What is the probability that the project is finished in 57 weeks or fewer? (Round to two decimals.)

  (a) 0.68

  (b) 0.78

  (c) 0.22

  (d) 0.32

  (e) none of the above

The following table provides information for the next few questions.

Table 13-6

Activity

 

Immediate

Predecessor

Optimistic

 

Most

Likely

Pessimistic

 

Expec-ted t

 

s

 

s2

 

A

-

2

3

4

3

0.333

0.111

B

-

2

5

8

5

1.000

1.000

C

A

1

2

9

3

1.330

1.780

D

A

5

5

5

5

0.000

0.000

E

B, C

6

7

8

7

0.333

0.111

F

B

12

12

12

12

0.000

0.000

G

D, E

1

5

9

5

1.333

1.780

H

G, F

1

4

8

4.167

1.167

1.362

7. Which activities are part of the critical path?

  (a) A, B, E, G, H

  (b) A, C, E, G, H

  (c) A, D, G, H

  (d) B, F, H

  (e) none of the above

8. What is the variance of the critical path?

  (a) 5.222

  (b) 4.364

  (c) 1.362

  (d) 5.144

  (e) none of the above

Table 14-1

M/M/2

 

Mean Arrival Rate:

9 occurrences per minute

Mean Service Rate:

7 occurrences per minute

Number of Servers:

2                

 

 

Queue Statistics:

 

Mean Number of Units in the System:

2.191

Mean Number of Units in the Queue:

0.905

 

Mean Time in the System:

14.609 minutes

Mean Time in the Queue:

6.037 minutes

Service Facility Utilization Factor:

0.643

Probability of No Units in System:

0.217





9. According to the information provided in Table 14-1, on average, how many units are in the line?

  (a) 0.643

  (b) 2.191

  (c) 2.307

  (d) 0.217

  (e) 0.905

10. According to the information provided in Table 14-1, what proportion of time is at least one server busy?

  (a) 0.643

  (b) 0.905

  (c) 0.783

  (d) 0.091

  (e) none of the above

11. Using the information provided in Table 14-1 and counting each person being served and the people in line, on average, how many people would be in this system?

  (a) 0.905

  (b) 2.191

  (c) 6.037

  (d) 14.609

  (e) none of the above

12. According to the information provided in Table 14-1, what is the average time spent by a person in this system?

  (a) 0.905 minutes

  (b) 2.191 minutes

  (c) 6.037 minutes

  (d) 14.609 minutes

  (e) none of the above

13. According to the information provided in Table 14-1, what percentage of the total available service time is being used?

  (a) 90.5%

  (b) 21.7%

  (c) 64.3%

  (d) It could be any of the above, depending on other factors.

  (e) none of the above

Table 14-5

M/D/1

 

Mean Arrival Rate:

5 occurrences per minute

Constant Service Rate:

7 occurrences per minute

 

 

Queue Statistics:

 

Mean Number of Units in the System:

1.607

Mean Number of Units in the Queue:

0.893

Mean Time in the System:

0.321 minutes

Mean Time in the Queue:

0.179 minutes

Service Facility Utilization Factor:

0.714

14. According to the information provided in Table 14-5, which presents the solution for a queuing problem with a constant service rate, on average, how much time is spent waiting in line?

  (a) 1.607 minutes

  (b) 0.714 minutes

  (c) 0.179 minutes

  (d) 0.893 minutes

  (e) none of the above

15. According to the information provided in Table 14-5, which presents the solution for a queuing problem with a constant service rate, on average, how many customers are in the system?

  (a) 0.893

  (b) 0.714

  (c) 1.607

  (d) 0.375

  (e) none of the above

16. According to the information provided in Table 14-5, which presents a queuing problem solution for a queuing problem with a constant service rate, on average, how many customers arrive per time period?

  (a) 5

  (b) 7

  (c) 1.607

  (d) 0.893

  (e) none of the above

Table 15-2

A pharmacy is considering hiring another pharmacist to better serve customers. To help analyze this situation, records are kept to determine how many customers will arrive in any 10-minute interval. Based on 100 ten-minute intervals, the following probability distribution has been developed and random numbers assigned to each event.

 

 

 

Number of Arrivals

Probability

Interval of Random Numbers

6

0.2

01-20

7

0.3

21-50

8

0.3

51-80

9

0.1

81-90

10

0.1

91-00

17. According to Table 15-2, the number of arrivals in any 10-minute period is between 6 and 10, inclusive. Suppose the next three random numbers were 18, 89, and 67, and these were used to simulate arrivals in the next three 10-minute intervals. How many customers would have arrived during this 30-minute time period?

(a) 22

(b) 23

(c) 24

(d) 25

(e) none of the above

18. According to Table 15-2, the number of arrivals in any 10-minute period is between 6 and 10, inclusive. Suppose the next three random numbers were 20, 50, and 79, and these were used to simulate arrivals in the next three 10-minute intervals. How many customers would have arrived during this 30-minute time period?

(a) 18

(b) 19

(c) 20

(d) 21

(e) none of the above

19. According to Table 15-2, the number of arrivals in any 10-minute period is between 6 and 10 inclusive. Suppose the next 3 random numbers were 02, 81, and 18. These numbers are used to simulate arrivals into the pharmacy. What would the average number of arrivals per 10-minute period be based on this set of occurrences?

(a) 6

(b) 7

(c) 8

(d) 9

(e) none of the above

Table 15.3

A pawn shop in Arlington, Texas, has a drive-through window to better serve customers. The following tables provide information about the time between arrivals and the service times required at the window on a particularly busy day of the week. All times are in minutes.

 

 

 

Time Between Arrivals

Probability

Interval of Random Numbers

1

0.1

01-10

2

0.3

11-40

3

0.4

41-80

4

0.2

81-00

 

 

 

Service Time

Probability

Interval of Random Numbers

1

0.2

01-20

2

0.4

21-60

3

0.3

61-90

4

0.1

91-00

The first random number generated for arrivals is used to tell when the first customer arrives after opening.

20. According to Table 15-3, the time between successive arrivals is 1, 2, 3, or 4 minutes. If the store opens at 8:00a.m. and random numbers are used to generate arrivals, what time would the first customer arrive if the first random number were 02?

(a) 8:01

(b) 8:02

(c) 8:03

(d) 8:04

(e) none of the above

21. According to Table 15-3, the time between successive arrivals is 1, 2, 3, or 4 minutes. The store opens at 8:00a.m. and random numbers are used to generate arrivals and service times. The first random number to generate an arrival is 39, while the first service time is generated by the random number 94. What time would the first customer finish transacting business?

(a) 8:03

(b) 8:04

(c) 8:05

(d) 8:06

(e) none of the above

22. According to Table 15-3, the time between successive arrivals is 1, 2, 3, or 4 minutes. The store opens at 8:00a.m. and random numbers are used to generate arrivals and service times. The first 3 random numbers to generate arrivals are 09, 89, and 26. What time does the third customer arrive?

(a) 8:07

(b) 8:08

(c) 8:09

(d) 8:10

(e) none of the above

23. According to Table 15-3, the time between successive arrivals is 1, 2, 3, or 4 minutes. The store opens at 8:00a.m. and random numbers are used to generate arrivals and service times. The first two random numbers for arrivals are 95 and 08. The first two random numbers for service times are 92 and 18. At what time does the second customer finish transacting business?

(a) 8:07

(b) 8:08

(c) 8:09

(d) 8:10

(e) none of the above

Table 15-4

 

 

 

Variable Value

Probability

Cumulative Probability

0

0.08

0.08

1

0.23

0.31

2

0.32

0.63

3

0.28

0.91

4

0.09

1.00

 

 

 

Number of Runs

200

 

Average Value

2.10

24. According to Table 15-4, which presents a summary of the Monte Carlo output from a simulation of 200 runs, there are 5 possible values for the variable of concern. If this variable represents the number of machine breakdowns during a day, what is the probability that the number of breakdowns is 2 or fewer?

(a) 0.23

(b) 0.31

(c) 0.32

(d) 0.63

(e) none of the above

25. According to Table 15-4, which presents a summary of the Monte Carlo output from a simulation of 200 runs, there are 5 possible values for the variable of concern. If this variable represents the number of machine breakdowns during a day, what is the  probability that the number of breakdowns is more than 4?

(a) 0

(b) 0.08

(c) 0.09

(d) 1.00

(e) none of the above

26. According to Table 15-4, which presents a summary of the Monte Carlo output from a simulation of 200 runs, there are 5 possible values for the variable of concern. If this variable represents the number of machine breakdowns during a day, based on this simulation run, what is the average number of breakdowns per day?

(a) 2.00

(b) 2.10

(c) 2.50

(d) 200

(e) none of the above

Reference no: EM13241735

Questions Cloud

Explain the following five solutions are mixed together : when the following five solutions are mixed together, only one reaction occurs. write the net ionic equation for that precipitation reaction. KCl(aq),Cu(NO3)(aq),AgNO3(aq),CaCl2(aq),and Ba(No3)2(aq)
How do you calculate standard deviation : Using the standard normal table, the total probability to the right of z=2.18 and to the left of z=1.75 is?
Find the magnitude of the average current in this region : Suppose that a particle accelerator is used to move two beams of particles in opposite directions, what is the magnitude of the average current in this region
What is one of the two differences between the way zst : What is one of the two differences between the way ZST or ZLT are calculated?
What is the average number of breakdowns per day : This variable represents the number of machine breakdowns during a day, based on this simulation run, what is the average number of breakdowns per day?
Calculate the substitution effect and ordinary income effect : Suppose that an i-phone producer produces 300 i-phones a week. Initially the price of i-phone is $200 and the demand function for i-phone is: x1=20+(m/(10*p1)), where x1 is the amount of i-phones demanded
Find the final pressure and draw a pv diagram : One mole of a monatomic gass initially at 273 K and 1 atm is compressed isothermally (T constant) from volume 22.4 L to 11. 4 L, Find the final pressure and draw a PV diagram, Labeling the initial and final states 1 and 2
Can you please explain the 1.5 sigma shift they use in : Can you please explain the 1.5 sigma shift they use in determining process sigma?
Find the final pressure and draw a pv diagram : One mole of a monatomic gass initially at 273 K and 1 atm is compressed isothermally (T constant) from volume 22.4 L to 11. 4 L, Find the final pressure and draw a PV diagram, Labeling the initial and final states 1 and 2

Reviews

Write a Review

Applied Statistics Questions & Answers

  What is the probability that all will arrive on time

What is the probability that at least one of the flights will be late and why the binomial model is not appropriate for finding the probability that at least one flight will be late.

  Use correlation coefficient to identify collocations

Would there be a possibility to use the correlation coefficient to identify collocations and Compare with the Chi2 test and How could we maybe do that

  Develop a pareto chart

Develop a Pareto chart to identify the more significant types of rejection.

  Information and the research study

Please read through the case scenario shown below to gain an understanding of the background information and the research study

  Regression of the rate of inflation

Using the data on the growth rate of Money and inflation, run a regression of the rate of inflation on the rate of growth of the money supply

  How much revenue would be made

How much of each product do you recommend be produced that you believe maximizes revenue? How much revenue would be made if they followed your recommendation?

  Compute the mean and sd of the probability

Compute the mean and SD of the probability of the mean and determine the test statistic

  Determine the stream function and plot the streamlines

Determine the stream function and plot the streamlines and Discretise the expression for the second derivative using the finite difference approach

  What is the importance of the decision theory

Decision Trees are graphic displays of the decision process. When do you feel it is appropriate to use decision trees?

  Evaluate the study

Binge drinking and alcohol-related behaviours amongst Pacific youth: a national survey of secondary school students

  Quantitative analysis for decision making assignment

Graphical Solutions in Linear Programming have limited number of decision variables. What is the maximum number of decision variables used in graphical solutions?

  Which country should import bed linens

Suppose South Korea can produce 100 computer chips with 10 hours of labor input and 50 bed linens with 6 hours of labor input. The US can produce 100 computer chips with 8 hours of labor input and 50 bed linens with 4 hours of labor input.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd