A light manufacturing firm has set up a project for developing a new machine for one of its production lines. The most likely estimated cost of the project itself is $1,000,000, but the most optimistic estimate is $900,000 while the pessimists predict a project cost of $1,200,000. The real problem is that even if the project costs are within those limits, if the project itself plus its implementation costs exceed $1,425,000, the project will not meet the firm's NPV hurdle. There are four cost categories involved in adding the prospective new machine to the production line: (1) engineering labor cost, (2) nonengineering labor cost, (3) assorted material cost, and (4) production line down-time cost. The engineering labor requirement has been estimated to be 600 hours, plus or minus 15 percent at a cost of $80 per hour. The nonengineering labor requirement is estimated to be 1500 hours, but could be as low as 1200 hours or as high as 2200 hours at a cost of $35 per hour. Assorted material may run as high as $155,000 or as low as $100,000, but is most likely to be about $135,000. The best guess of time lost on the production line is 110 hours, possibly as low as 105 hours and as high as 120 hours. The line contributes about $500 per hour to the firm's profit and overhead. What is the probability that the new machine project will meet the firm's NPV hurdle?
Under what environmental conditions are price wars most likely to occur in the industry? What are the implications of price wars for a company?
Analyze reliability of computer-driven shoe machines process in Shuz world Shanghai plant.
You need to determine upper control line for a "p" chart for quality control purposes. You take several samples of a size of 100 items in your production process. From samples you determine.
Meanwhile the % of rooms sold for full price compared to the discount would be 100-2X (some people would wait to book gambling a discount would happen). Find the ideal discount %.
how much will his long term average satisfaction be? For Steve, what amount (in nearest whole $) would give him the same satifaction equal to the previous question?
Illustrate what kind of challenges did the IRS encounter when implementing its CDW. Illustrate what management, organization also technology issues had to be addressed.
What are the advantages of financing via the Internet as Marrone did? Are there any disadvantages to financing via the Internet?
An innovative restaurateur owns and operates a dozen "Ultimate Low-Carb" restaurants in northern Arkansas. His signature item is a cheese-encrusted beef medallion wrapped in lettuce.
I-mart is a discount optical shop that can fi ll most prescription orders in around 1 hour. The management is analyzing the processes at the store. There currently is one person assigned to each task below.
What management concerns made BP reexamine their leadership model? What business issues did they face? How did this form of human expression assist in moving the top management perception of the organizational culture forward?
Discuss the legal and ethical issues surrounding Solyndra, the California based solar panel manufacturer. Incorporate two to three specific laws or ethical codes that apply to the situation.
In what ways does the service that you are thinking about exhibit characteristics that indicate that it is "well-designed", and in what ways could changes be made to make the service more consistent with the seven characteristics? For example, is ..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd