Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Your contracting company has just been awarded a large earthmoving contract that would be well suited for a Caterpillar 950H loader to load trucks with. A local rental yard said that they will supply you the loader for $50.00 per hour plus $4.15 sales tax not including any operating costs. You need to analyze what it would cost your company to purchase the loader instead of renting it. The purchase price including sales tax and attachments is $260,000. The project will last 5 years and you are not sure that you will have work for the loader after this project therefore you need to plan on selling it at the end of 5 years for 60% of the original purchase price. According to the schedules that the project managers have put together it appears that you will be able to get 1,500 hours of utilization per year on the loader during all five years and they also anticipate 45 minute efficiency working hours. According to the Chief Financial Officer of the company your cost of money is 8% and the insurance on the loader will be .4% of the value. Your tire sales person says that a set of 4 tires will cost $9,000.00, last 2,500 hours and the average repairs will be about 14% of the purchase price over the life of the tires. The preventative maintenance schedule that your fleet is on has PM1 oil changes completed every 225 hours with oil, lube and filter cost at $8.00 per gallon, the repair and maintenance cost is $3.00 per hour and your throttle load factor for the loader is 65%. The loader will be scraping the ground about 30% of the time with high wear ground engaging cutting edges that cost $400.00 per set and will last 200 hours performing this application before they wear out. Diesel fuel is $3.00 per gallon.
a. What is the ownership cost per hour?
b. What is the operating cost per hour?
c. What does it cost to use the rental machine per hour?
d. Over 5 years at 1,500 hours per year what is the total cost difference?
e. What is one unique fact that you learned about the 950 loader?
calculate the change in entropy of a gas of mass 8kg when 100 kj of heat energy is supplied to the gas. the temperature of the gas remains constant at 100 c during the heat transfer process
what is the probability that less than 0.5 inches of precipitation will occur in any January? What is the probability that more than 2.5 inches wil
an incident occurs on a freeway that has a capacity in the northbound direction, before the incident, of 4000 veh/h and a constant flow of 2900 veh/h during the morning commute.
The casting has a mass of 3 Mg. Suspended in a vertical position and initially at rest, it is given an upward speed of V mm/s in 0.3s using a crane hook H. Determine the tension in cables AC and AB during this time interval if the acceleration is ..
Geometric design and construction of a new two-lane two-way road has been recently completed and now it is time for design pavement near Ballarat, Victoria.
A 200-kg mass is hanging from a hook conncted to a pulley. The chord around the pulley is connected ot the overhead support at two points. What is the tension in each cord connected to the support if the angle of the chord from vertical is 0º
A water storage tank is on the roof of a factory building & the surface of the water is 50 ft above the floor of the factory. if a pipe connects the storage tank to the floor level & the pipe is full of static water
Make a list of threats which may be vulnerable to the company's information system.
If you deposit $1000 per month into an investment account that pays interest at a rate of 6% per year, compounded quarterly, how much will be in the account at the end of 5 years
The compound bar carries the axial forces P and 2P. Find the maximum allowable value of P if the working stresses are 40 ksi for steel and 20 ksi for aluminum, and the total elongation of the bar is not to exceed 0.2 in.
What is the peak discharge for an area with the following characteristics The rainfall intensity is 120 mm/hour. Land use Area, m2 Forest 10,000 Single family residential 9,000 Parking lots 5,000
The velocity of the bed is limited to a maximum value of 150mm/s to the right and 300mm/s to the left; the acceleration is successively equal to 150mm/s^2 to the right, zero 150 mm/s^2 to the left, zero, etc.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd