Reference no: EM13910138
1) A product improvement will raise sales and the firm's cash flows will rise by $80,000 at the end of the first year, $100,000 at the end of the second year, and $120,000 at the end of the third year. After that we expect no effect from the product innovation. The cost of the innovation is $280,000, which is less than the total cash flow generated by the innovation. This amount will be paid today. Should your firm spend $280,000 to get $300,000 back?
2) How much would the cost of the innovation have to be to make you indifferent between investing or not?
3) You are able to lower cost of innovation to $200,000 but it will take more time to do the work. This means higher profits and cash flows will be delayed by one year. The investment of $200,000 will occur today. Which option is better ($200,000 with delay or $280,000 without delay)? What is the NPV of the project with the lower cost of innovation ($200,000) and the delay?
4) The $200,000 option is not guaranteed to work. You feel there is a 95% probability it will work in which case the firm's cash flows will rise as described in 3). If the innovation fails, then cash flows will not change (ie: the increase is zero). The success of the innovation is a function solely of whether the production process works. The $200,000 will be spent today before you know whether the new innovation works. Now which option is better ($200,000 with delay and risk or $280,000 without delay)? What is the NPV of the project with the lower cost of innovation ($200,000), delay, and risk?
SOLVE IN EXCEL, SHOW FORMULAS
What is the concentration of the na
: What is the concentration of the Na and K if we take 1ml from Na (10ppm) and 1ml from K (10ppm) and dissolved them together with dist. water to be 10 ml mixed soln.?
|
How does one determine an optimal equity split for a deal
: What issues must be considered? Do not cut and paste from textbooks. Do some actual research from graduate papers, and cite them.Give an example of an actual deal.
|
Determine your own state of energy balance
: What is your 1-day energy (kcal) intake and what is your Estimated Energy Requirement (EER) - Compare your calculated state of energy balance to your current weight status.
|
Deferring aircraft maintenance
: American Airlines has historically manipulated its earning by deferring aircraft maintenance. Discuss how this behavior may be unethical to both its shareholders and customers.
|
What is npv of the project with the lower cost of innovation
: You are able to lower cost of innovation to $200,000 but it will take more time to do the work. This means higher profits and cash flows will be delayed by one year. The investment of $200,000 will occur today. Which option is better ($200,000 wit..
|
Find the molecular formula
: a) Find the molecular formula of this compound if the Formula mass is 62.12 g/mole. b) Determine how many H atoms would be in a 3.50g sample of this compound.
|
Difference between an equation and an expression
: What is the difference between an equation and an expression? Can we multiply every term of an equation by anything we want? How about an expression?How do you find the common denominator of two or more fractions
|
Pollutant turned the painting black
: Lead pigments were used in water colour painting which turned black after prolonged to an air pollutant the original color was restored by using H2O2 which pollutant turned the painting black?
|
Construct a spreadsheet model to compute free cash flow
: What level of annual unit sales does it take for the investment to achieve a zero NPV? Use your spreadsheet model to answer this question
|