Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Three parallel rural routes connect two cities A and B. Traffic on these routes mainly consists of heavy trucks for a logging company, and passenger vehicle flow can be neglected. The performance functions of these three routes are: t1=50+0.2v1, t2=80+0.1v2, t3=120 + 0.05v3 t1, t2, t3 and are travel times in minutes; v1, v2, v3 are flows in number of trucks per day. There is a bridge along route 2. The structural design of the bridge allows a maximum of 1000 trucks per day. However, the bridge has been deteriorating in recent years due to the lack of proper maintenance. At the beginning of each logging season, the company will assess the condition of the bridge to determine the maximum trucks per day the bridge can safely handle. This season, the company discovers that the bridge can only handle 400 trucks per day. The company also estimates that it will generate a demand of 1500 trucks per day between the two cities in this logging season. The operating cost of each truck is $2 per minute.
1. Formulate an optimization problem to help the company find a routing strategy for this season in order to reduce its transportation operating cost.
2. Solve the problem and report the number of trucks on each route and the total operating cost of the logging company.
3. What is the loss in truck operating cost for the logging company compared to when the bridge was at its design loading capacity?
4. Derive the KKT condition of the problem formulated in part 1.
what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?
what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?
In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.
Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.
Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.
Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.
Develop a simple urban constructed wetland design.
Evaluate company performance in relation to GRI standards and comment on Stigler's theory.
Determine the corresponding error in the computed discharge
Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel
Write a paper on steel sustainability.
Writing case study about bridge collapse
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd