A divided multilane highway in a recreational area (fp = 0.90) has four lanes (two lanes in each direction) and is on rolling terrain. The highway has 10-ft lanes with a 6-ft right-side shoulder and a 3-fl left-side shoulder. The posted speed is 50 mi/h. Formerly, there were 4 access points per mile, but recent development has increased the number or access points to 12 per mile. Before the development, the peak-hour factor was 0.95 and the directional hourly volume was 2300 vehicles with 10% large trucks and buses and 3% recreational vehicles. After the development, the peak-hour directional flow is 2700 vehicles with the same vehicle percentages and peak-hour factor. What is the level of service before and after the development?

Reference no: EM13312134

Questions Cloud

Create an master production schedule : Create an Master Production Schedule and a Material Requirement Planning Chart
How many feet of head must the pump add to achieve : At a pumped storage facility, water is pumped from a large reservoir to a point 150 feet above the resevoir. How many feet of head must the pump add to achieve 10,000 lbm/hr flow through a 24 inch pipe with a friction head loss of 1.5 feet
Find the velocity of the wood : A block of wood of mass 4.85 kg rests on a horizontal frictionless surface. find the velocity of the wood after the bullet has passed through
What is the fluid velocity in the pipe in feet per second : Water enters a pipe at 100 psig and 70 degrees F. The density of water under these conditions is 62.3 lbm/ft^3. The pipe has an inside diameter of 4.5 inches. The mass flow rate of the water is measured to be 7500 lbm/hr.
What is level of service before and after the development : A divided multilane highway in a recreational area (fp = 0.90) has four lanes (two lanes in each direction) and is on rolling terrain. The highway has 10-ft lanes with a 6-ft right-side shoulder and a 3-fl left-side shoulder.
What is the acceleration of the two teams : Two teams of nine members each engage in a tug of war. The first team's members have average masses of 65 kg and exert average forces of 1350 N horizontally. What is the acceleration of the two teams
Security of information in business organisations : Definitions and descriptions of the terms, 'integrity', 'availability' 'confidentiality', 'authenticity' and 'non-repudiation' in relation to the security protection of information assets in the chosen topic environment, i.e. what is it about thes..
Estimate the inside diameter and wall thickness of the pipe : Estimate the inside diameter, wall thicknes and outside diameter of the pipe. The carbon steel pipe has tensile yield strength of 250 MPa. Assume safety factore of 2 and a corrosion allowance of 2mm. The maximumoperating pressure (MOP) is 55 bar.
Determine what is the maximum elevation of the reservoir : If a 100 horsepower pump is used to pump water (rho = 1.94 slugs/ft3) from a lake to a raised reservoir what is the maximum elevation of the reservoir above the lake if the pump operates at 30 cubic feet per second

Reviews

Write a Review

Civil Engineering Questions & Answers

  How to show the oscillation of each of the systems

mechanical oscillations can be described in general by the following function: y(t)= e^(-t/m) *sin(wt+phi). where (t) is time and (w) is the oscillation angular frequency in radians per unit time.

  Plot the shape of water surface from the center to radius

a whirlpool is modeled as the combination of a free and a forced vortex. the maximum velocity in the whirlpool is 10 m/s, and the radius at the juncture of the free and the forced vortex is 10m.

  Formulate problem as an ip and find optimal solution

The Record-a-Song company has contracted with a rising star to record eight songs. The sizes in MB of the different songs are 8, 3, 5, 5, 9, 6, 7, and 12, respectively. Record-a-Song uses two CDs for recording. Each CD has a capacity of 30 MB.

  Determine what is the equation for average vehicle delay

What is the equation for average vehicle delay Is it averge queue over arrivals Average queue over average arrivals

  Determine diameter of solid shaft if it is to transmit 50hp

If the allowable shear stress is 15ksi, determine the diameter of a solid shaft if it is to transmit 50hp at a frequency of (a) 900rpm, (b) 1800rpm

  Determine the tension t and the reaction at b and d

Two transmission belts pass over sheaves welded to an axle supported by a thrust bearing at B and a journal bearing at D. The sheaves A has a radius of 50mm, and the sheave at C has a radius of 40mm.

  Find the magnitude of r dot and theta double dot at t

If r = (theta)2 and theta = 2t, find the magnitude of r dot and theta double dot when t = 2 s

  Determine was driver exceeding the speed limit at time zero

A car is traveling along a road at a uniform velocity when at time zero the driver recognizes a hazard. At a moment 0.8 seconds later the driver brakes her vehicle , resulting in her vehicle sliding 90 ft in the same direction

  Determine smallest velocity vo for which package will reach

A small package of weight W is projected into a vertical return loop at A with a velocity Vo. The package travels without friction along a circle of radius "r" and is deposited on a horizontal surface at C.

  Determine what is the specific yield of the aquifer material

The area is about 100,000 ha, the ground water pumping about 500 million m3 per year, and the water table drop about 3 m per year. Assuming no replenishment, what is the specific yield of the aquifer material

  Define cad is a better choice then traditional drafting

Think of a situation where CAD is a better choice then traditional drafting. Given multiple ways to input coordinates, is one way better than another? Are there situations where you ell use one method over and other?

  Calculate the linear misclosure and relative precision

Balance by the compass rule the departures and latitudes listed in the following closed-polygon traverse. Calculate the linear misclosure, relative precision, and adjusted lengths and bearings

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd