Reference no: EM131137577
A small neighborhood restaurant is staffed by a hostess, five wait staff and four cooks. The hostess seats the guests and hands out the menu which takes 3 minutes. Then a waiter takes the orders and sends them to the kitchen which takes 5 minutes on average. It takes an average of 5 minutes before one of the cooks picks the order and starts preparing the meals. Once the cook starts the order, it takes an average of 15 minutes to prepare one customer order. When the meals are ready, the waiter brings the food to the table which takes 4 minutes. The waiter also brings the check and processes the payment which also takes 3 minutes.
a) What is the bottleneck activity and what is the capacity of the process?
b) What is the throughput time of a typical order?
c) If an average of 12 customers arrive at the restuarant per hour during the peak demand time (often in the evenings), how many customers will be in the restauarant on average during this time?
d) Suppose the hostess is paid $12/hour, the wait staff are paid $8/hour each, and the cooks are paid $15/hour each. In addition, it costs the restaurant about 30% of the hourly labor rate for overhead. What is the average cost of labor and overhead per order for the restaurant if average demand is 13 customers per hour?
e) Assuming the same pay rates as in (d) above, what will be the average cost of labor and overhead per order for the restaurant when it operates at full capacity?
Calculate the vertical ultimate load
: Calculate the vertical ultimate load. Assume a circular failure surface for the footing and a planar surface for the cut.
|
Explains that needs to be revised in the assessment
: Explains everything that needs to be revised in the assessment. - Just need supporting sources to back up what has already been stated in ALL THREE ASSESSMENTS.
|
Nine determinations of the specific heat of iron
: Nine determinations of the specific heat of iron had a standard deviation of 0.0086. Assuming that these determinations constitute a random sample from a normal population, test the null hypothesis σ = 0.0100 against the alternative hypothesis σ
|
Determine the member end moments for the rectangular ring
: Determine the member end moments for the rectangular ring in Figure, and draw the shear and moment curves for members AB and AD.
|
What is bottleneck activity and capacity of process
: A small neighborhood restaurant is staffed by a hostess, five wait staff and four cooks. The hostess seats the guests and hands out the menu which takes 3 minutes. Then a waiter takes the orders and sends them to the kitchen which takes 5 minutes on ..
|
A random sample from a normal population
: In a random sample, the weights of 24 Black Angus steers of a certain age have a standard deviation of 238 pounds. Assuming that the weights constitute a random sample from a normal population, test the null hypothesis σ = 250 pounds against the t..
|
Explain what people are saying about the subject
: Write 4-5 pages in which you explain what people are saying about the subject. You will then critique the arguments made in the sources, but you will not yet advance your own position.
|
Prepare a post closing trial balance at july 31
: Apachi Company ended its fiscal year on July 31, 2010. The company's adjusted trial balance as of the end of its fiscal year is as shown at the top of page 182.
|
The standard deviation of measurements
: Past data indicate that the standard deviation of measurements made on sheet metal stampings by experienced inspectors is 0.41 square inch. If a new inspector measures 50 stampings with a standard deviation of 0.49 square inch, use the method of E..
|