Reference no: EM133039227
1. What is a Safe Work Method Statement?
2. What are the duties of employers regarding working at heights?
3. What fall protection measures could you implement in your job?
4. What are the weight restrictions for the following scaffolds?
- Light Duty
- Medium Duty
- Heavy Duty
5. What is the maximum height you can erect scaffolding without a Worksafe Certificate of Competency?
6. What rules should you follow when working with mobile scaffolds?
7. Detail how thick the scaffold plank timber should be for the following spans as required by AS1577?
1.5
2.0
2.5
8. How can you control the risk of internal falls within scaffold?
9. What are the advantages of adopting the method outlined above?
10. What is the sequential erection method for erecting scaffolding?
12. Describe the following terms used in scaffolding:
- Tie Bar
- Base Lift
- Closed platform
- Hop up bracket
- Toe board
- Working force