In microsoft project.
1) What is a resource?
2) Why aren't resources assigned to summary tasks?
3) What is the difference between Start, Prorated and End in association with costs?
4) Give a real-world example of the difference between a fixed cost and a cost per use?
5) Why is a fixed cost entered with the task and not the resource?
6) Why is the resource cost for the Wiring Contractor $0.00?
7) Which resource is Overallocated and why?
Formulate a linear programming solution to be used to determine what the composition of a can of dog food should be to meet the various requirements at the minimum cost.
Illustrate what is the percent change in multifactor productivity if the manufacturer can reduce the energy bill by $2000 per day without cutting production or changing any other inputs.
Discuss several advantages of using the M/M/1 waiting line queuing model. Clearly explain the reasons for your choices.
Project involves 12 activities and the precedence relationship is provided below in brackets. Draw an activity on arrow network to represent the project tasks and their dependence.
Compare and contrast the three organizational structures discussed in the text: functional, project, and matrix. Provide examples that show the difference between the three, including some of the advantages and disadvantages of each.
Address the impact on the project parameters as a result of these changes.
Based on your findings, write a two- to three-page paper in APA format.Type your question here.
Analyze the flow chart drawn above utilizing the basic question. Suggest improvements for increasing the efficiency or effectiveness of the above chosen function.
A farmer in Lowa owns 45 acres of land. He is going to plant each acre with wheat or corn. It clearly indicates how the derived value has been reached.
Illustrate what are advantages also disadvantages of each model as it pertains to coordination. Networking.
What Is The Primary Reason People Buy And Own Major Appliance Such As Washing Machine. Is there a secondary reason as well?
Groundz can place orders only once a month. Inventory and ordering costs would remain the same. Is it more cost-effective for Groundz to switch suppliers? Should Groundz switch? (new total cost $3042.67, switch)
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd