What does the words leads and lag represent in factor

Assignment Help Electrical Engineering
Reference no: EM13250437

(1) What does the words leads and lag represent in factor? In waveform?

(2) How would you change the power factor if you needed to ?

Reference no: EM13250437

Questions Cloud

How would you organize your company : You are CEO of a rapidly growing video rental company and have plans to go international in the very near future. What steps would you take to enter the international marketplace? How would you organize your company? Why?
Determine the output y in each of the given cases : For a discrete-time LTI system, the imput signal is x[n], impulse response is h[n] and output is y[n]. Analytically determine the output y[n] in each of the above cases. x[n]=anu[n-2],|a|
Compute in how many years these signs will be replaced : Calculate in how many years these signs will have to be replaced. Assume that the end lifetime is when the emission from the tritium is down to only 37% from the initial emission when installed
Find the macroscopic total cross section of heavy water : A beam of 2-MeV neutrons is incident on a slab of heavy water (D2O). The total cross-sections of deuterium and oxygen are 2.6b and 1.6b respectively.what is the macroscopic total cross section of D2O at 2 MeV?
What does the words leads and lag represent in factor : (1) What does the words leads and lag represent in factor In waveform (2) How would you change the power factor if you needed to
Explain a balanced equation for the combination reaction : Write a balanced equation for the combination reaction described, using the smallest possible integer coefficients. When zinc oxide combines with water, zinc hydroxide is formed.
What is the 4th non-zero value of z from the left : Consider two discrete sequences: x = [7.7, 5.2, 2.2] y = [1.0, 9.3, 3.1] Let z be the convolution of x and y. What is the 4th non-zero value of z (from the left)
Which costs are controllable by the project manager : What are the major types of costs? Which costs are controllable by the project manager?
Determine the correct banking angle of the road : A highway curve of radius 560m is designed for traffic moving at a speed of 94.0km/hr. What is the correct banking angle of the road

Reviews

Write a Review

Electrical Engineering Questions & Answers

  Determined capacitor voltage and charging current

A series of combination having R=2Mohm and C=0.01 UF is connected across a D.C. voltage source of 50V. Determined capacitor voltage and charging current after 0.02s, 0.04s and 1 hour.

  Determine minimum required bandwidth and baud rate

For a 128-PSK modulator with an input data rate equal to 56 Mbps and a carrier frequency of 100 MHz, determine (a) minimum required bandwidth and (b) baud rate.

  What is the magnitude of the impedance at an frequency

A parallel-resonant RLC circuit has R = 75 I, L=50mh, and C=45pF. A) Sketch and label the circuit. B) Find fo, the resonant frequency. C) At what frequency is impedance a maximum D) What is the magnitude of the impedance at this frequency

  What is the net profit for each digital thermometer sold

Consider the financial aspects of the digital thermometer project. The project cost is estimated at $10,000. The total manufacturing cost of the digital thermometer, as called for in the specifications, total $150(that is, $95 parts

  How is the tcnt timer used to generate an interrupt

1.The S12G128 CPU board has one IRQ pin. You have four devices that will request interrupt service. How do you determine which device(s) need service 3.A communications channel has a bandwidth of 2,000 Hz and a signal-to-noise ratio (SNR) of 40 dB.

  How long in seconds would take to instead rotate degrees

If it takes 1 sec to rotate 45 degrees after starting from rest, how long in seconds would it take to instead rotate 81 degrees after starting from rest under the same constant angular acceleration.

  How to load each number in the accumulator one at a time

There are three numbers stored in Memory Locations 10-12. Write a machine language program to load each number in the accumulator one at a time. Use the immediate addressing mode to add four to each value that is loaded to accumulator.

  Calculate the magnetizing branch impedances

A 10kVA, 200/400V 50Hz single-phase transformer gave the following test results. O/C test: 200V, 1.3A, 120W, on l.v. side. S/C test: 22V, 30A, 200W on h.v. side. (a) Calculate the magnetizing current and the component corresponding to core loss

  Give the polar plot of the frequency response

1. Sketch the polar plot of the frequency response for the following loop transfer functions: Gc(s)G(s) = 1 / ((1 + 0.25s)(1 + 3s)) Gc(s)G(s) = 5(s^2 + 1.4s + 1) / (s - 1)^2 Gc(s)G(s) = (s - 8) / (s^2 + 6s + 8) Gc(s)G(s) = 20(s + 8) / (s(s +2)(s + 2)..

  Explain eigenfunctions and lti systems

Eigenfunctions and LTI systems, The eigenfunction property is only valid for LTI systems. Consider the cases of nonlinear and of time varying systems.

  Estimate the primary current with secondary open

The laminated silicon steel core of a transformer has a mean length of 0.06 m and a cross section of 0.005 meter square. there are 150 turns on primary winding and 450 turns on the secondary. the input is 200 V rms at 50 Hz.

  How to write a subroutine in assembler for the hcs12

In and Th are inputs and Out is the result. All parameters are 8-bit unsigned integers. A typical calling shows that the two inputs, In and Th, are passed on the stack and the return parameter Out, is returned in RegB.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd