What distance on 5% grade should be laid out with a tape that measures 30.010 m under field conditions if the horizontal distance is to be 430.00m?
Your boss has assigned you the job of designing a rapid-mix tank for the new water treatment plant for the town of Waffle. The design flow rate is 0.050 m^3/s. The average water temperature is 8 degrees celcius.
the 3.5mg engine is suspended from a 500 kg spreader beam and hoisted by a crane which gives it an acceleration of 4m/s^2 when it has a velocity of 2m/s. determine the force in chains AC and AD during the lift.
A water supply system is being designed to serve a population of 200,000 people with an average per-capita demand of 600L/Person-day (peak demand factor is 1.8) and a needed fire flow of 28,000 L/min.
If a 96-inch brick sewer (n = 0.015) is laid on a slope of 0.01% is set to be rehabilitated with GIPL (n = 0.01) that will need 2-inches all around it. How much more flow, in cfs will be attained with this project
A horizontal curve was designed for a four-lane highway for adequate SSD. Lane widths are 12 feet, and the superelevation is 0.06 and was set assuming maximum fx.
A wastewater is discharged to a stream with a reoxygenation constant of 0.5 day-1 and a velocity of 1 m/sec. The oxygen saturation concentration in the stream is 11 mg/L.
A two stage crushing operation feeds 0.6 m diameter ore into a primary crusher at a rate of 25mt/hr. 80% of the ore feeds through an 0.2m screen into a secondary crusher. 65% of the ore from the secondary crusher comes out of a 50mm screen.
A one meter diameter cylindrical mass is connected to a 2 meter wide rectangular gate. the gate is to open when the water level drops below 2.5 meters. Determine the required value of the mass of the cylinder in kgs.
A crest vertical curve and a horizontal curve on the same highway have the same design speed. The equal-tangent vertical curve connects a +3% initial grade with a +1% final grade and has a PVC at 101+78 and a PVT at 106+72
Wheeling-Pittsburgh Steel is investigating whether it should it should replace some of the basic oxygen furnace equipment now or wait to do it later. The cost later (i.e. 3 years from now) is estimated to be $1,700,000.
Are either of the Ax or Jx forces relevant to finding the tension between H and J. If so, what is the easiest way to solve for those 2 unknowns.
The wet bulb and dry bulb temperatures for humid atmospheric air (at 100 kPa) are measured to be 20 C and 25C respectively. Determine: a. using the psychrometric chart, the relative humidity b. using the psychrometric chart, the humidity ratio
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd