Question 1

The village of pongelton is in the valley of the River Pong. The mean flow of the river is 3.0 m3/s. The population of Pongelton is 6,000. The daily average water consumption is 250 litre/ head/day. Water utilisation (i.e. the water spent for watering gardens, watering animals, etc) is 20%.

Sewers are built in the village and the construction of a sewage treatment works is planned. The local government also wishes to construct a small recreational reservoir downstream & the site of the planned effluent discharge. The Environment Agency requires an assurance that the aquatic environment of the planned reservoir will not be impaired by the discharge of the final effluent from the sewage treatment works. Thus, the Environment Agency will require the sewage treatment works to be designed for phosphorus removal, in order to avoid eutrophication downstrearn of the discharge. To achieve this, the concentration of phosphorus in the inflow to the planned reservoir must be less than 40 mg/m3. The average phosphorus concentration of household sewage is 10 mg/l and the phosphorus concentration of the unpolluted river, upstream of Pongelton is 10 mg/m3.

You are the designer and must address the following issues:

1. If no treatment facility is provided, what will the phosphorus concentration of the river be downstream of the sewage discharge?

2. Does this value meet the EA's quality requirement?

3. If not, in percentage terms, what degree of treatment should be provided for phosphorus removal. Express your answer in percentage terms (i.e. percentage of phosphorus to be removed).

POLLUTION AND WATER QUALITY

Question 2

The town of Prettybrooks (population 65,000) is to build a new sewage treatment works. The Environment Agency requires an environmental impact assessment to be carried out for the project. The water quality targets to be met in the receiving watercourse, 12km downstream of the proposed the  sewage outfall are set as follows:

i) Dissolved oxygen (DO) not less than 6 mg/l, when the flow of the receiving water course, the river Little Lousy, upstream of the proposed Mantis 12 m3/s.

ii) BOD5 less than 6 mg/l within 0.5 days

Water consumption in Prettybrooks is 250 litre/ head / day on average and the estimated water losses of the system in the summer months (evaporation, gardening losses, leakage of the sewer system, etc) are 20%. Estimated raw sewage strength BOD5 is. 550 mg O2/l. Estimated raw sewage DO concentration is 1.5 mg/l. Assume a de-oxygenation rate constant, K1 of 0.37 day-1 at 20oC (to base e).

The Environment Agency has supplied the following background data for the river Little Lousy upstrearrm of the proposed discharge point:

  • BOD5 concentration: 6 mg/I
  • DO: 7 mg O2/1
  • River velocity= 0.4 m/s
  • Mean depth of stream: 1.3 m
  • The mean river temperature is 19 oC

Calculate:

(i) if raw sewage is discharged with no treatment, the critical time corresponding to the critical deficit, and the distance downstream of the discharge point at which it occurs.

(ii) The critical DO deficit

POLLUTION AND WATER QUALITY

(iii) The time and distance for which the BOD criteria are violated if raw sewage is discharged with no treatment.

(iv) The amount of ROD to be removed at the proposed STW in order that the EA requirements are met.

(v) The revised critical time and deficit associated with item (iv).

Verified Expert

We have to find the critical deficit time and distance of the sewage treatment. We have taken Prettybrooks town with population 65,000 and related data for the present problem. Everything that we have calculated or designed must be close enough to Environment Agency requirements for environmental impact assessment. In the present solution quality of water is calculated in terms of BOD. The DO < 6 mg/l, when flow of receiving water course is Q=12 m3/s. Also we have given that BOD < 6 mg/l in 0.5 days. The water consumption in Prettybrooks is 250 litre /head /day on average. The approximate raw sewage DO concentration is 1.5 mg/L. Also de-oxygenation rate constant, K1 = 0.37 day-1 at 200C. The river velocity is 0.4 m/s and mean depth of stream is 1.3 m. By using the equations BOD and related parameters can be calculated.

Reference no: EM131369037

Questions Cloud

Find the rotational speed of the manifold : The total flowrate of 2.3 gpm is divided evenly among the six outlets, each of which produces a 5/16-in.-diameter stream.
Presentations of philosophical teachings : What do you think is beneficial about each of these presentations of philosophical teachings, compared with "traditional" modes of philosophical writing? Which style do you think is most helpful for learning philosophical concepts and why
How detailed do you believe this requirements identification : The first thing the architect, Vince Albright, did with the group was to document the current business services and associated IT resources that might be replaced or modified by Kate's and Jim's proposals. Why do you believe this was a necessary f..
Business section of a major daily newspaper : Article review to select a current article from the Wall Street Journal or the business section of a major daily newspaper such as The New York Times, Chicago Tribune, USA Today, Los Angeles Times
What degree of treatment should be provided for phosphorus : What degree of treatment should be provided for phosphorus removal. Express your answer in percentage terms (i.e. percentage of phosphorus to be removed) - what will the phosphorus concentration of the river be downstream of the sewage discharge?
Analyze the selected companys specific practices or policie : Examine the selected company's specific practices or policies. Speculate on the major influences that these practices or policies have on individual and organizational outcomes.
Create a definition of generalist practice : Create a definition of generalist practice. Identify at least three specific examples of generalist practice. Indicate the characteristics that make each an example of generalist practice
How is information technology transforming health care : How is information technology (IT) transforming health care? The impact of new initiatives which provide patient access to providers is enormous and potentially astronomical.
Use combined push and pull strategy : Aunt Thelma's Real Missouri BBQ Sauce has just been perfected and is ready for market. As the company's marketing consultant you advise them to use a combined push and pull strategy. First, suggest to them what they should do to push the product, the..

Reviews

Write a Review

Other Engineering Questions & Answers

  Find the minimum required channel length

Design the two-stage CMOS op amp in Fig. to provide a CMRR of about 72 dB. If all the transistors are operated at equal overdrive voltages of 0.15 V and have equal channel lengths, find the minimum required channel length. For this technology, / V..

  Application that utilizes principle of finite state machine

Think of a digital system application that utilizes the principle of Finite State Machine (FSM). (Example: Traffic light controller)

  What value of voltage gain in the transition region

For an inverter employing a 2-V supply, suggest an ideal set of values for VM, VIL , VIH , VOL, VOH,NML,NMH. Also, sketch the VTC. What value of voltage gain in the transition region does your ideal specification imply?

  Delay in time between the contraction of the atria

1) There is a delay in time between the contraction of the atria and the contraction of the ventricles. This is called the AV-delay. What structural characteristics (identify more than one!) of the conducting fibers between the AV node and AV bundle ..

  Outline a process to effectively use a use case diagram

Develop a compelling argument on WHY TASER should invest more in the prevention and appraisal - Outline a process to effectively use a Use Case diagram.

  How many pounds of effort would be needed to lif

A fixed pulley system has 4 strands with only 3 supporting. How many pounds of effort would be needed to lift a 600 lb weight?

  Microsoft project software amend your wbs

Make sure that you use your resource sheet in Microsoft project to list all materials, work classification units and resource units. Make sure you show totals for all major headings and the project total itself

  Write down the expressions for the total average delay

Telecommunications System Modelling ECTE 962 - Write down the expressions for the total average delay (W) in the system, as well as other relevant indicators such as the size of queues at intersections. Clearly state any assumptions that you have ..

  Actors will interact with the processes on the use case

create a use-case diagram for the crm system following the uml guidelines in appendix a of the textbook.doc sharing

  Floating point implementation of the radix

Fixed point and floating point implementation of the radix 2 FFT algorithm. Comparison of accuracy of the fixed point with floating point, sensitivity analysis to word size, pre-scaling and rounding.

  Describe the relationship between the inputs to the qws

Develop the truth tables necessary to describe the relationship between the inputs to the QWS and the outputs to the LEDs.

  Determine the voltage gain and calculate the current

Determine the voltage gain and calculate the current - Is the circuit capacitive or inductive and explain.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd