Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
One accident mitigation procedure is called emergency material transfer, in which the material is transported away from the accident site before it becomes involved. We plan on mitigating a crude oil tank fire scenario by pumping the tank empty in 1 hr total time. The crude oil storage tank is 30 m in diameter, and the crude oil is typically at a level of 9 m. The transfer will be accomplished by pumping the crude oil through a 200-mm (internal diameter) new commercial steel pipe to another tank 40 m in diameter and 10 m high. The pipeline represents 50 m of equivalent pipe. Estimate the minimum pump size (in HP) required to pump the entire tank empty in 1 hr. Assume a pump efficiency of 80%. If a 100-HP pump (80% efficient) is available, how long will it take to empty the tank? What conclusions can be drawn about the viability of this approach? The density of the crude oil is 928 kg/m3 with a viscosity of 0.004 kg/m s.
suppose you apply a force of 14.4 N to a spring and it stretches 2.4 cm. what is the spring constant?
calculate the amplitude F0 of the sinusoidal excitation force that is necessary to produce a steady-state vibration with a velocity amplitude of 10 m/s at resonance. what is the corresponding amplitude of the acceleration
Describe a soil classified as SW and a soil classified as CH in the Unified Soil Classification System as you would to a person having no knowledge of soil classification procedures or equipment.
Two reservoirs are connected with a 30" diameter pipe with a length of 19,680 ft. The water surface elevation in the upper reservoir of the upper reservoir is 984 ft, lower reservoir 886 ft and the elevation at the midpoint is 918 ft.
A construction company requires to know how much of additives A and B to use to prepare concrete to be used in a freezing environment (northern location). The concrete mix should contain a minimum concentration of nitrate and sulphate.
Using the method of Lee et al., predict the temperature required in an isothermal plug flow incinerator to reduce the xylene level in a waste gas from 100 ppm to 10 ppm. Assume a residence time of 0.7 sec.
The Washington Monument is 169 m tall. What is the stress in the lowermost rock if it is made of Georgia granite?
Three-ply asphalt felt and gravel roof over 2in of insulation board is supported by 18in deep precast reinforced concrete beams with 3ft wide flanges. If insulation weights 3lb/ft 2 and the asphalt roofing weights 5.5lb/ft2, determine the total dea..
The Record-a-Song company has contracted with a rising star to record eight songs. The sizes in MB of the different songs are 8, 3, 5, 5, 9, 6, 7, and 12, respectively. Record-a-Song uses two CDs for recording. Each CD has a capacity of 30 MB.
Does Bernard have an unfair advantage over firms having designed the project on which he wants to bid?
The coal has an ash content of 12% by mass. Forty percent of the ash falls out the bottom of the furnace. The rest of the ash is carried out of the furnace with the hot gases into an electrostatic precipitator (ESP).
Given an 18-in. concrete conduit with a roughness coefficient of n = 0.013, s = 0.02, and a discharge capacity of 15 cfs, what diameter pipe is required to triple the capacity?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd