What are the processes for developing a new mine

Assignment Help Civil Engineering
Reference no: EM131089506

School of Science, Information Technology and Engineering

1. What are the processes for developing a new mine in Australia? Give your answer as per your geographic location.

2. What are strategic risks? How would you manage these risks?

3. Define short, medium and long term planning?

4. Discuss some of the factors that an engineer needs to account for when planning a mining operation.

5. What techniques of pit optimisation are available?

6. Define the following in relation to network techniques (CPM and PERT)
a) Earliest start time
b) Latest start time
c) Earliest finish time
d) Latest finish time
e) Slack
f) Float

7. Discuss the floating cone process.

8. Describe three problems with regard to the application of the floating cone technique. What are the positive aspects of the floating cone technique?

9. Summarise the steps in the Lerchs-Grossmann 2D algorithm

10. Define the terms:
a) Project year
b) Production year
c) Calendar year

11. Summarise the basic concepts behind Lane's algorithm

12. A project is defined by the list of activities detailed in Table 1.
a) Draw the network as an activity on the arc network
b) Find the critical path
c) Find the slack for each activity

Table 1

Activity

 

Immediate predecessors

Duration days

 

A

-

3

B

-

4

C

-

3

D

C

2

E

B

1

F

A

5

G

B

2

H

B

3

I

C

11

J

D, E

3

K

F, G

1

L

K

4

M

J, H

4

13. The network shown in the next diagram is to be used in the planning of the installation of an underground crusher station. Determine the total project time and the critical path.

754_Figure.jpg

14. Cut-off Grade

Following are the variables for choosing the "Optimum Cut-off Grade":
M = maximum amount of material that the mine can produce in any given time (mine capacity)
C = maximum amount of ore that can be put through the concentrator in any given time (mill capacity)
R = maximum amount of final product that can be produced in the given time period
(production capacity)
m = mining costs, $/t of material mined c = concentrator cost, $/t of ore milled r = smelting, refining, packaging, insurance cost, $/kg of final product f = fixed cost
s = selling price y = recovery
T = length of production period
Qm = quantity of material to be mined
Qc =quantity of ore sent to the concentrator
Qr = amount of product actually produced over this production period

A. Using these above variables, develop the basic equations for

a) total cost, Tc

b) revenue, R

c) profit, P

B. Develop the equations for cut-off grade assuming that

a) mining rate is the governing constraint

b) concentrating rate is the governing constraint

c) refining rate is the governing constraint

15. Define the following terms used with respect to the Lerchs-Grossmann 3D algorithm

a) Directed arc

b) Edge

c) Weight

d) Node

e) Graph

f) Directed graph

g) Sub graph

h) Closure

i) Maximum closure

j) Circuit

k) Chain

l) Cycle

m) Path

n) Tree

o) Root

p) Branch

q) Twig

16. DESIGN PROJECT

The following describes a selection of mineral deposits. The candidate (Note: choose only anyone) is required to select a suitable mining method for the deposit based on the information given and to describe the mining system in detail. For whichever mineral deposit is selected, the candidate should include in their answer the following as required:

1. Describe suitable surface connection(s).

2. Detail development requirements

3. Detail Production requirements including a full description of the method selected.

4. Number of production unit's required/rate of production.

5. Describe loading/haulage requirements

6. Equipment

7. Briefly describe ventilation/drainage/power requirements

8. Personnel

9. Safety

10. Detail permitting and other requirements as required by the local regulator (students can select which jurisdiction the mine is located in from any Australian state or territory)

Students should also report on other salient points as required by the mining system. For economic analysis, use current market prices in A$ for the commodity as required. Accurate costings are not an essential aspect to the project but some notional costings should be undertaken to illustrate the viability of the method detailed.

UNDERGROUND MINING PROJECT

A massive silver/lead/ zinc deposit approximately 250 m in width and 1,500m long ranging in depth from 300m below surface to 900m below surface. Angle of dip is 70°.

SURFACE MINING PROJECT

A copper-gold-silver mine is located in a desert at an elevation of 3,050 m above sea level. Production is 46.9 Mt/y of sulphide ore grading 1.9% copper, containing 776,400 t of copper, 129,000 oz of gold and 3.28 Moz of silver.

The deposit is related geologically to three porphyry bodies intruded along a major fault system. Primary hydrothermal sulphide ore grades at between 0.2% and 1% copper. Subsequent weathering and uplifting created a barren, leached cap, up to 180 m thick, over a high-grade supergene enriched ore, both overlying the primary sulphides. Primary sulphide mineralisation includes pyrite, chalcopyrite and bornite, with covellite and chalcocite in the enriched zone. Some areas contain significant oxide copper oxides overlying the sulphides.

Proven and probable reserves estimated at 1,990 Mt grading 1.23% copper. Initial mining reserves totaled 662 Mt grading 2.12% copper. The stripping ratio will average around 1.7:1 over the full life of the project.

Verified Expert

The attached assignment regarding mining process in Australia is prepared in MS word document. It consists of 26 pages with more than 6000 words count. It answers all the 16 questions asked. It includes three problematic questions and remaining theoretical questions. Needed diagrams and tables were included for some answers where needed. This answers all the questions asked and prepared in the format given.

Reference no: EM131089506

Questions Cloud

Same appeal for older chinese : Why has "OMG! Meiyu" been so successful in China? Why do you think people have responded so well to the program? Do you think it holds the same appeal for older Chinese as it does for younger students?
What is marginal benefit at this level : Your firm’s research department has estimated your total revenues to be R(Q) = 600Q – 4Q2 and your total costs to be 60 + 2Q2. (Note that MB = 600 - 8Q and MC = 4Q). What level of Q maximized net benefits? What is marginal benefit at this level of Q?
Describe an effective leadership style to address a problem : Explain the accountability of the nurse leader for decisions that affect health care delivery and patient outcomes. ?Describe how outcomes or success of the style selected for each situation could be measured.
Formation of the ural and appalachian mountains : How does the theory of plate tectonics explain the existence of this mountain belt in the interior of an expansive continental landmass - Compare and contrast the formation of the Ural and Appalachian mountains, given their similar age.
What are the processes for developing a new mine : What are the processes for developing a new mine in Australia? Give your answer as per your geographic location - what are strategic risks? How would you manage these risks?
Payment systems in services such as medicare : Question:  Analyze the changes that have occurred in recent years regarding the payment systems in services such as Medicare, Medicaid, Managed Care, etc.
Determining the problem of inflation : Monetary policy by the US Federal Reserve is important for the US economy. However,economists disagree about several aspects of Federal Reserve decision-making powers including the composition of the Federal Reserve committees, Federal Reserve goa..
Who is leading the charge to promote safety : A "culture of safety" is a term about which we hear a great deal. Describe the culture of safety at your organization. Who is leading the charge to promote safety? What is your role as a BSN-prepared nurse in ongoing strategies to promote safety?
Effect of importing cheap manufactured goods : What is the effect of importing cheap manufactured goods from out country to the local manufacturers?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Design a simply supported one-way reinforced concrete slab

Design a simply supported one-way reinforced concrete floor slab to span 10 ft and carry a service live load of 175 psf and a service dead load of 25 psf. Use fc' = 3000 psi and fy = 60,000 psi.

  What it the distance after adjusting for sag

A 200ft tape is hung in catenary. It is supported at the 80ft mark the tension is 20lbf and the weight of the tape is 3 lbf 5 0z. The measured distance is 187.01 what it the distance after adjusting for sag?

  Corporate decision making

Corporate Decision Making

  Determine required diameter of each reinforcing steel bar

If the column is subjected to an axial compressive force of 800 kN, determine the required diameter of each reinforcing steel bar so that one-third of the load is carried by the steel and two-thirds by the concrete. Assume Esteel= 200 GPa and Econ..

  Find stresses in ab and bc and the displacement at point

A bar is under uniform axial loads. AB is 1 foot and has a area of .5 in^2 and BC is 1 foot and has an area of .3 in^2. AB has a 1000lb force putting it under tension and BC has a 500lb force putting it under compression. Find stresses in AB and BC a..

  Determine the safety factor of the wire against breaking

The length of the wire is 7,000 m, the weight density of the steel is 78 kN/m3 and its ultimate stress is 620 MPa. Find the safety factor of the wire against breaking from its own weight.

  Determine the required mass of block a from rest

Determine the required mass of block A so that when it is released from rest it moves the 5-kg block B a distance of .75m up along the smooth inclined plane in t=2s. Neglect the mass of the pulleys and cords.

  The opponents of globalization focus their criticism on the

the opponents of globalization focus their criticism on the role of globalization in homogenizing the world and driving

  Explain the process for establishing a centerline for a road

Your response should be a minimum of one (1) single spaced page to a maximum of two (2) pages in length. Explain the process for establishing a centerline for a roadway for an existing road.

  Determine the bearing of polaris is approximated by z

You are planning a Polaris observation at latitude 42 degrees North when the star is at or near upper culmination. You want to know the error in azimuth that will result from a 1 min timing error.

  Determine the value of the dynamic viscosity at conditions

Start from the values for the density and the kinematic viscosity of CO2 at 15o C and standard atmospheric pressure (101.3 kPa), and first determine the value of the dynamic viscosity at the same conditions.

  Draw the shear and moment diagram for a beam

Draw the shear and moment Diagram for a beam that is 10 feet long, supported on the left end by a roler, and the right end by a pin, and has a 1000 lb load placed in the center i.e at 5 feet.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd