Reference no: EM132460518
An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total time for all tasks is 18 minutes. The line will operate for 450 minutes per day.
a. What are the minimum and maximum cycle times? Round answers to 1 decimal place.
Minimum cycle time minutes/uni
Maximum cycle time minutes/unit
b. What range of daily output is theoretically possible for the line? Round answers to 1 decimal place. Enter the lower end of the range in the left (first) box and upper end of the range in the right (second) box.
Range of output ___ to ___ units/day
c. What is the minimum number of workstations needed if the maximum output rate is needed? Round answer based on information provided in lecture.
Minimum number of workstations _____
d. What cycle time will provide an output rate of 125 units per day? Round answer to 1 decimal place.
Cycle time min/unit
e. What output should result if the cycle time is (1) 9 minutes? (2) 15 minutes? Round answer to whole number.
Cycle Time Potential Output
(1) units/day
(2) units/day
Dollar inflation and the future exchange rate
: AvtoVAZ OAO, a leading auto manufacturer in Russia, was launching a new automobile model in 2001, and is in the midst of completing a complete pricing analysis
|
Define why you believe planning is important
: Select one of the following businesses: a large bank, a government agency, or a hospital, and explain which systems you feel are mission critical. Then explain.
|
Explain approach to ensure successful implementation of erm
: Explain the best approach to ensure successful implementation of ERM? Please provide a few different elements. Discuss the benefits of virtualization software.
|
Find the market price per share
: Assuming Sunland Corp. has an ROE of 10% and investors require a 9% return on shares, estimate the firm's P/E ratio and market price given an EPS
|
What are the minimum and maximum cycle times
: What are the minimum and maximum cycle times? Round answers to 1 decimal place.
|
Discuss basic concept and algorithms of association analysis
: Discuss the basic concepts and algorithms of Association Analysis in Data mining. Need 2 replies for other 2 students as well. The response must be typed.
|
Determine third financial instrument was a forward contract
: Determine how to account for these under ASPE and IFRS.Determine third financial instrument was a forward contract,The company established a stock appreciation
|
What would be the price of share of steady stock
: What would be the price of share of Steady stock, assuming a required rate of 8%?
|
Mini-case analysis-amazing brentwood inc
: Amazing Brentwood Inc. bought a long-term asset for $100,000. The asset has a 30% CCA rate. At the end of year 5, the firm sold the asset for 25%
|