What are the masses of gravel-sand and water per cubic meter

Assignment Help Civil Engineering
Reference no: EM13313346

The design of a concrete mix requires 1173kg/m3 of gravel in SSD condition, 582 kg/m3 of sand in SSD condition, and 157kg/m3 of free water. The gravel available at the job site has a moisture content of 0.8% and absorption of 1.5%, and the available sand has a moisture content of 1.1% and absorption of 1.3%. What are the masses of gravel, sand, and water per cubic meter that should be used at the job site?

Reference no: EM13313346

Questions Cloud

Find probability that vehicle pulling out will get accident : The driver of the vehicle does not look for oncoming traffic. Road conditions and vehicle speeds on the highway are such that it takes 1.5 seconds for an oncoming vehicle to stop once breaks are applied.
Compute the amount naoh that is acetic acid : Calculate the amount (in mL) of a 1.520M NaOH that is required to add the following acetic acid solutions to prepare a buffer with the corresponding pH: pKa of acetic acid = 4.74
With what speed is the kereru travelling after the collision : a kereru new zealand wood pigeon travelling at 1.5 m/s due west has an elastic collision with an airbus a380 aeroplane. with what speed is the kereru travelling after the collision?
What is product positioning : What is product positioning? Product repositioning? Why and when would Rollerblade need to reposition?
What are the masses of gravel-sand and water per cubic meter : The design of a concrete mix requires 1173kg/m3 of gravel in SSD condition, 582 kg/m3 of sand in SSD condition, and 157kg/m3 of free water. The gravel available at the job site has a moisture content of 0.8% and absorption of 1.5%
Door-to-door sales department and released all employees : A cable company closed its door-to-door sales department and released all employees of that department after settling a discrimination complaint by one of the department's employees.
How long is it before the rain will come to a complete stop : a 40 x 10^3 kg train is travelling at 8.3m/s when the engineer sees a sheep on the tracks. she throws the emergenxy brakes on. How long is it before the rain will come to a complete stop
Explain what is the ph of the equivalence point : What is the pH of the equivalence point of the two solutions if you then titrate these solutions separately with the NaOH solution? The Ka for acetic acid is 1.8e-5.
Determine discharge-q and depth of flow in the gutter : The continuity equation is just the water balance for the slope or any small portion of the slope and can be given as: p - fp = RO where i = rainfall rate, fp = infiltration capacity, and RO = runoff rate, all expressed as a depth per time

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd