Question 1: What is defined in OSHA Standard 1926.32(f)?
General Duty Clause
General Inspection Procedure
Qualified Person
Competent Person
Question 2: Which list is in the order of OSHA's priorities for inspections?
Fatalities, referrals, complaints, planned
Planned, complaints, follow-ups, referrals
Fatalities, complaints, referrals, follow-ups
Imminent danger, complaints, planned, follow-ups
Question 3: Training requirements for gas welding can be found in:
29 CFR 1926.350
29 CFR 1926.351
29 CFR 1926.651
29 CFR 1926.957
Question 4: Employers are required by OSHA to review emergency evacuations with employees at specific times. Which of the following is NOT one of those times?
Whenever the plan is changed
Initially when the plan is developed
Annually once implemented
Whenever designated actions under the plan change
Question 5: OSHA uses a two-step process to determine if a citation is warranted under the multi-employer worksite policy. The second step of the process is to:
determine if an OSHA standard was violated.
determine if the employer's actions were sufficient to meet obligations of OSHA requirement.
determine if the employer willfully violated the standard.
determine which employer is the controlling employer.
Question 6: What are the four classifications of employers under OSHA's multi-employer worksite policy? How do they relate to each other?
Question 7: According to the OSHA construction standards, what is a competent person? Discuss two examples of competent person requirements from the construction standards.
Question 8: Using the requirements for General Duty violations in Chapter 4 of the OSHA Field Operations Manual (FOM) describe a situation that could be cited as a violation of the General Duty Clause. Remember that the General Duty Clause can only be applied if there is no OSHA standard for the hazard. Explain how your citation meets the four elements listed in the FOM as necessary to prove such a violation.
Question 9: Imagine that you are the safety manager on a large construction site and are notified that an OSHA inspector has arrived at the site gate, inspection warrant in-hand, requesting access. Describe the procedures you would follow to accommodate the inspector's request and how the inspection should proceed.
Different scheduling techniques for different size projects
: There are different scheduling techniques for different size projects but all benefit from a best-case, expected-case, and worst-case scenario. Compare and contrast these three scenarios.
|
How has the rise of electronic channels affected wholesaling
: How has the rise of electronic channels affected wholesaling? How has the rise of electronic channels affected retailing? Why are certain products more appropriate for electronic channels? What types of products are less appropriate for electronic ch..
|
What is the magnitude of the sum of these two vectors
: Vector V1 is 6.69 units long and points along the negative x-axis. Vector V2 is 2.84 units long and points at 45 degrees above the positive x-axis. What is the magnitude of the sum of these two vectors?
|
Find the electric field e in a region
: An electron has an initial velocity of (12.0j + 15.0k) km/s and a constant acceleration of (2.00 x 1012 m/s2)i in a region in which uniform electric and magnetic fields are present. If B = (400μT)i, find the electric field E.
|
What are the four classifications of employers
: What are the four classifications of employers under OSHA's multi-employer worksite policy? How do they relate to each other
|
Two major approaches to quality improvement
: Your readings and lecture this week provide essential background on quality in healthcare, including the two major approaches to quality improvement. Compare and contrast the continuous quality improvement (CQI) and Six Sigma approaches to quality im..
|
Process of encoding and decoding messages
: Symmetric encryption is the process of encoding and decoding messages using the same key. An important aspect of this type encryption is to ensure that the key is not compromised and that only the sender and receiver have access to the key used t..
|
Pay for the power that is generated by the solar panels
: Joe is considering installing solar panels on the roof of his home, in Sun City, Arizona. If he goes forward, he will pay the installation firm but will save money on its electric bill. Draw an influence diagram. Now suppose that another uncertainty ..
|
Describe the potential hazards
: Think of a job common to construction worksites (for example, hanging drywall). List the steps for the job. For one of the steps, describe the potential hazards and suggest some possible control measures
|