MINI-CASE :

The city of Hong Kong has a dense population with limited land suitable for housing. As a result, building trends have been toward taller apartment units, with many in excess of 140 m. With water resource management a large concern for city planners, the design of efficient building water supply systems is very important. A key component of the design process is estimating the maximum total simultaneous water demand in such buildings so that engineers can limit the water supply failure rate to less than 1%. The challenge for city engineers is to balance the cost of the water supply system with its reliability. A variety of methods have been used to estimate the maximum load. They typically involve using the flow rate of each water fixture, the number of water fixtures in a building, and an estimated parameter that captures the probability that all of the fixtures are in use simultaneously. These "fixture-unit" methods were initially developed in the mid-1900s, and were parameterized with empirical data from medium-rise housing. Hong Kong engineers were concerned that the methods might not be suitable for high-rise buildings.

To address this concern, the engineers conducted a survey of close to 600 households to find out the typical daily usage patterns of various water consuming appliances for each family member. Combining this with sampled flow rates and flow duration for each of the appliances, they were able to construct probabilitv distributions for each of these sources of variation. The engineers then used this information as input to a Monte Carlo simulation, which was used to construct a cumulative risk profile for the peak water load on the system. The simulation predicted a peak load of only 50%-60% of that computed by the "fixture-unit" method, and implied a much lower cost for the high-rise buildings' water supply system. These findings were thought to be useful in updating the methodology for computing water demand in high-rise residential construction and were seen to be a step forward in balancing cost with water supply reliabilitv.

Discussion
As a result of technological change and the emergence of new societal needs, engineers must constantly review and update design processes. In this mini-case, increases in the height of apartment towers and the need to better manage natural resources were the driving forces behind consideration of new design parameters for load estimation for sizing water plants and piping systems. The design parameters developed vears previously for low-rise or medium-rise buildings were not considered appropriate for the very highrise housing common in Hong Kong. Also, the need to manage fresh water consumption through the use of efficient water supply systems was considered necessary. The process of estimating overall peak water needs started with studying the individual components of an aparnnent water system-the typical domestic appliances one would find in an apartment.

By collecting data on the water consumption of each appliance, and then by sampling appliance usage patterns by time of day, day of week, and by time of year, the engineers were able to build up a profile for water usage patterns. The sampling allowed them to establish probability distributions for the number of users served by a particular appliance, the flow rate of an appliance, its operating time and the hourly use of the appliance. Using this as their basic unit of analysis, they could then build up a model of an apartment system by specifying its size, and how the individual components interacted.

For many engineering projects, system-level behaviour can be difficult to predict, even if there is a good model of how individual components behave. For example, in this mini-case, older peak water consumption models assumed that all appliances in the same washroom could be in use simultaneously. A more realistic assumption, validated by the interview results, was that only one could be in use at a time. While the older model might have been more mathematically tractable, the model developed in this mini-case allowed for more complex and realistic interactions. As a result, the engineers were able to produce a predictive model that met the needs of technological change and societal need.

Questions
1. Many projects can be implemented without an initial simulation study. Name a few examples, and explain why decisions about their acceptability can be made without a simulation study.

2. What are the characteristics of projects where simulation makes sense? Provide several examples of this type of project.

3. Simulations can help with evaluating different design alternatives, including the possibility of pinpointing potential problems. Can you think of other benefits provided by a simulation?

4. The output of a single simulation trial is a random variable. What is the problem with using only one trial for the purposes of decision making?

5. Ji-Ye is evaluating a proposal to build a plant that will cost 7670 000 000. A consultant has offered her a simulation that was developed to model the performance of a similar plant in the United States. If she wanted to use the American simulation, what considerations would she need to make for its application in a Chinese setting? How might she judge how much to spend on the simulation?

Reference no: EM131375611

Questions Cloud

Discuss about the post given below : Cratejoy is a company that creates a platform for dealers to unveil a subscription exchange in business. The main reason why I decided to choose this company and base my arguments on it is that the business was launched last year and it has been p..
Important to strategic management : What are stakeholders, and why are they important to strategic management?
Web customer uses our web site to make purchases online : Draw a use case diagram for the system described below: Web Customer uses our web site to make purchases online. Top level functionality given by the web site are View Items, Make Purchase and Client Register. View Items use case have several optiona..
Managers who are not self-aware : What do you think is the best approach with managers who are not self-aware?
What are the characteristics of projects : What are the characteristics of projects where simulation makes sense? Provide several examples of this type of project.
Calculate the heat load for walk-in coolers or freezers : What are the approximate ventilation requirements for aircooled condensing units located in an indoor environment?
Describe the needs of communication networks in a business : Your new corporate CIO has devised a nine-point mission statement for the company. As one of the operations managers in the department, you have received a memo on the new policy and an associated task. The CIO wants to address the new strategy in..
Operational process flow : Process improvement requires the analysis of processes and of data. In this Assignment, you will develop a process flow for an operational activity that takes place in your organization, whether or not you work in the field of health care.
Construct a pcm for the criterion cost : John considers a cost difference of S100 or more to be of strong importance, and a difference of S50 to be of moderate importance. Construct a PCM for the criterion cost.

Reviews

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd