Reference no: EM131389686
Assignment
As you will recall from Unit 1, product costs include manufacturing overhead, as well as direct costs such as labor and materials. In Job-order costing this manufacturing overhead needs to be computed and included in the cost of the "job". However, there are some problems with computing how much of the overhead should be assigned.
• Manufacturing Overhead is an indirect cost, so it is almost impossible to figure out how much overhead each job uses up.
• Manufacturing Overhead includes some fixed costs. So, if a company has a seasonal production (producing a lot of units in one period, but not many in another), the individual product cost will vary widely. Conversely, if the company has a level-production schedule, but a widely fluctuating level of fixed costs (such as high utility bills in the summer or winter), then the per unit cost will also vary widely.
The way around these problems is to allocate manufacturing overhead by using a common base. An allocation base such as direct labor hours or direct machine hours allows managers to proportionately assign costs to a job. Typically, managers estimate the total amount of the allocation base that they believe they will need for the reporting period before the reporting period starts. In this way, they can assign costs to a job through-out the period. The estimate is called the predetermined overhead rate. It is computed using the following formula:
For example: if a company estimates that its overhead will be $1,500,000 over the coming year, and that they will need 200,000 labor hours to produce their product, the predetermined overhead would be:
$1,500,000 / 200,000 labor hours = $7.50 per labor hour
This means that for every labor hour (or fraction thereof) needed to produce one unit, the proportionate amount of $7.50 will be added to the per unit product cost. If it takes half an hour to make one unit then the per unit cost will increase by $3.75.
As you can see, these estimates can play a very crucial role in the bottom line of a company's financial statements. If the predetermined overhead rate is very high (overestimating product costs) then estimated net profit will be low. Conversely, if the predetermined rate is low, the profit estimates are better. Can you see how this may affect a manager's decision on choosing an allocation base, or in making the estimates?
Discussion Questions
Discuss the following questions in your initial post:
Suppose that the estimated overhead was estimated to be between $1.2M and $1.6M and estimated labor hours are 175,000 to 195,000.
• Which amounts would you use to calculate the overhead rate?
• What are the advantages of using the high or low estimates?
• Are there any ethical situations involved?
• What are the ramifications or under- or overestimating the overhead?
Renegotiating labor contract with union representative
: You are barganing coordinator for Sun Car Manufacturers. At present you are renegotiating the labor contract with the union representative. You are bargaining over an expected 20% increase in earnings over the next three-year contract period. The uni..
|
Examine one of favorite products
: Examine one of your favorite products, and describe how the manufacturer utilizes the marketing channels to get the product to you, the end user. Evaluate the company's distribution channels. What changes would you make (list at least two) and wh..
|
Distinguish between income effect and substitution effect
: Distinguish between the income effect and the substitution effect. Explain what would happen, if the income effect and the substitution effect were to offset one another exa
|
Monitoring online conversations
: Define Online Reputation Management (ORM) and Search Engine Results Page (SERP). Using specific examples, describe how your chosen company is managing ORM well. Using Google Alerts, select 10 alerts that you would set up for your company and explain ..
|
What are the advantages of using the high or low estimates
: What are the advantages of using the high or low estimates? Are there any ethical situations involved? What are the ramifications or under- or overestimating the overhead?
|
How long was she in a persistent vegetative state
: BULGL 319: Do a little research, find the name Karen Ann Quindlan, and answer the following:What happened to Karen Ann?How long was she in a persistent vegetative state?What were the wishes of her parents as far as using artificial means to keep her ..
|
Can they succeed in given action
: After discovering the actual purchase price paid by the promoters, the other shareholders desire to have $200,000 of the common stock canceled. Can they succeed in this action?
|
Find the drain-to-source voltage for the ph sensor circuit
: Find the drain-to-source voltage for the pH sensor circuit in Figure 8-59 when a pH of 5 is measured. Assume the rheostat is set to produce 4 V at the drain when a pH of 7 is measured.
|
Has she a cause of action against the times printing company
: C. A. Nimocks was a promoter engaged in organizing the Times Printing Company. - Has she a cause of action against the Times Printing Company?- Has she a cause of action against Nimocks?
|