Case Study: BUILDING COLLAPSES A REGULAR OCCURRENCE FOR CONSTRUCTION PROJECTS After a building collapsed in Kenya last week, killing at least 33 people, experts look at some reasons why such incidents occur in Africa. The six-storey residence in Kenya's capital Nairobi came down in heavy rain, with more than 80 people still missing. While investigations are still underway into the cause of this collapse, we look at some common problems associated to building collapses. Adequate foundations can be costly. They can cost up to half the price of a building, observes professor of civil engineering Anthony Ede at Covenant University in Ota, Nigeria. He says two things should be considered when you are building the foundations - the solidity of the soil and the heaviness of the building and its contents. In the commercial capital of his country, Lagos, the swampy ground requires strong foundations. Far stronger than solid ground. But he says developers save money that should be spent on foundations when building on the city's swampy ground and many buildings have collapsed in Lagos as a result. Even on solid ground, foundations need to be strong enough for the load. Inadequate foundations for a four-storey building was one of three reasons given by investigators for a building collapsing in northern Rwanda in 2013 and killing six people. Materials that just aren't strong enough to withhold the load are used, says Hermogene Nsengimana from the African Organization for Standardisation, whose organisation met last month in Nairobi to discuss why so many African buildings collapse. He suggests there is a market for counterfeit materials - going as far as to say that sometimes scrap metal is used instead of steel. When a six-storey building in Uganda's capital Kampala collapsed in April, the director of the city authority suggested it had been constructed with counterfeit materials. Mr Nsengimana says there are even cases of counterfeiters faking authentication certificates. But he suggests contractors also knowingly use the incorrect materials to cut costs. So they may use concrete intended to bear the load of a one-storey building in a four-storey building. Mr Ede adds that this is something regulators are not policing. Even when workers are given the right materials to make the concrete, they mix them incorrectly, says Mr Ede. This results in concrete which is not of the sufficient strength to hold the load. He accuses developers of cutting costs by employing unskilled workers who are cheaper than trained builders. This is one of the reasons put forward by civil engineers Henry Mwanaki Alinaitwe and Stephen Ekolu why a building in Uganda collapsed in 2004. Their research shows that the workers misunderstood the mixing ratios of the concrete. It suggested that people used wheelbarrows instead of measuring gauges to measure cement. The five-storey BBJ new hotel collapsed in construction and 11 people died. "You find bricklayers and even technicians calling themselves engineers," cautions the president of the Nigerian Institution of Structural Engineers Oreoluwa Fadayomi in Nigeria's The Punch news site. To those who want to save money on professionals, he advises: "One should not be penny wise and pound foolish". Mr Ede says a building collapses when the load is beyond the strength of the building. He gives the example of asking a baby to carry a heavy box: "The baby will not be able to withhold the strain." Even if the foundations and the materials are strong enough for what they were originally built for, that purpose may change. So, Mr Ede says, if a building was designed to be a home and is then turned into a library where boxes and boxes of books are piled up, the building may strain under the weight. He says another reason why the load is often heavier than the original design is because extra storeys are added. In March an upmarket apartment block which had more storeys than planned collapsed in Lagos, killing 34 people the Guardian reported. This came two years after a church accommodation for the famous preacher TB Joshua collapsed, also, authorities said, because it had more floors than it could hold. In that case more than 100 people lost their lives. At all points of construction, the strength of the building should be tested, says Mr Ede. "You have to be strict," he says, about policing building. "The law says you must test. It's the enforcement of the law which is the problem," he says. That's a big problem, he says, when at every stage of construction there is someone with a strong motivation to save money or take money. There are many physical reasons a building can collapse but only one driving motivation for that to happen, says Mr Ede. That's money. And for him this is the real reason buildings collapse - corruption.

Question 1

1.1 light of the case study provided, critically discuss the implications of failing to manage project quality in construction projects. (15 marks)

1.2 Mr Hermogene Nsengimana from the African Organization for Standardisation, whose organisation met last month in Nairobi to discuss why so many African buildings collapse has proposed the adoption of Kaoru Ishikawa in solving the quality problems affecting the construction phase of these project. Do you think this is a relevant proposal? Substantiate your response. 1.2 (20 marks)

1.3 What are some of the factors that have been responsible for building collapses in Africa?

SECTION B

QUESTION 2

Project quality planning is defined as the process of identifying quality requirements and/or standards for the project and its deliverables and documenting how the project will demonstrate compliance with relevant quality requirements. As a competent project quality manager examine the elements that you will consider essential in starting the quality planning process.

QUESTION 3 

Project quality management is a process that considers how a project should proceed to achieve the desired quality for the project's deliverables. It requires project managers to continually measure the quality of the activities and processes involved in the project. In project quality management, standards are set ahead of time to measure deliverables against, and action needs to be taken throughout the project to course-correct (Heizer and Render, 2021). Considering the statement provided, you have been requested to critically discuss the contents of a project quality plan. You should make use of the relevant examples.

QUESTION 4

With reference to any relevant examples of your choice, critically discuss the significance of project quality audits.

QUESTION 5

International Organizations for Standardization (ISO) is a network of national standards institutes that work in partnership with international organisations, governments, industries, businesses, and consumer representatives. As the lead project manager for a construction firm, you have been requested to critically discuss the focus areas of ISO in improving project quality.

Reference no: EM133315692

Questions Cloud

What is the problem of dominos pizza : What is the problem of Dominos Pizza and What your specific recommendation to this company - Please make industry-attractiveness analysis score both Astra
Summarize information about two of best companies in canada : Summarize information about two of the best companies in Canada for diversity and explain what makes them so successful
How should engage its workforce with such drastic downsizing : The Postal Service will reduce the number of jobs by over a third - how should leadership inform and engage its workforce with such drastic downsizing?
How can leader help develop a strong culture in organization : How can a leader help develop a strong culture in an organization and How can two companies with very different cultures that operate in the same industry
What are some of the factors that have been responsible : What are some of the factors that have been responsible for building collapses in Africa?examine the elements that you will consider essential in starting
Identify levels of jurisdiction of arizonas court structure : Identify the three levels of jurisdiction of Arizona's courts structure. Explain one of the levels and what types of cases are heard at this level.
Explain three models of representative democracy : Develop an argument that explains which of three models of representative democracy--participatory, pluralist.
Why is there resistance to organizational change : Share examples of resistance that can be encountered, or anticipate encountering, from subtle to overt. Why is there resistance to organizational change
Implement the linear optimization model : Implement the linear optimization model that you developed for ColPal Products in Problem 5 on a spreadsheet and use Solver to find an optimal solution

Reviews

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd