What alternatives are available to resolve the issues

Assignment Help Operation Management
Reference no: EM13224964

Peach Computer Company needs a facility in order to expand its business. It held a meeting with the project team and key stakeholders. At the meeting, the decision was made to utilize detailed design and engineering specifications so as to obtain competitive bids on the project. The executive committee required completion of the building within 12 months because the new facility would allow for production necessary to meet a new government contract. The facility was of vital importance to Peach because it would yield additional net income of $4,000,000 annually. Within 2 months after the meeting, Don, the project manager, issued a request for proposal using the recommended specification method with a specific construction time of 9 months. Four proposals were received. Don reviewed them quickly because he had 3 weeks to award the project and execute a contract.

Below is a summary of each response.

Winstrom Construction was a local Ohio firm that had completed much of the construction at Wright-Patterson Air Force Base. It submitted a bid of $5,960,000 with a required deposit of $1,000,000. Winstrom had worked previously on a similar project for Peach and had finished it on time. Don was concerned with the deposit given that Peach would have to supply these funds from capital reserves, which were invested at 8% annually, but he rated their quality an A because he heard Peach had a partnership attitude in dealing with the inevitable problems on the AFB projects.

Frazier Construction was a firm from Florida that had completed several projects around the country for competitors of Peach. Known for speed and flexibility, it had a reputation of finishing projects in 95% of the required time. Don had invited the company to bid because he noticed the Peach competitors tended to give Frazier repeat business. Its bid was $6,100,000.

Foreman Builders was following Peach from Minnesota, where it had completed three projects for Don. A small, minority-owned firm, Foreman was not well capitalized but Don liked the fact that he dealt directly with the owner, Chuck, and his son, Jay. Foreman had not worked in Ohio, but knew the building type quite well and felt that 9 months was sufficient time to complete the project. Don felt its quality was second to none, and was not surprised with Foreman's bid of $6,025,000 with a required deposit of $850,000.

D.A. Evans Company was a national builder of strong reputation. Highly sought after, it was known for on-time, on-budget delivery of high quality. Don had not worked with the company before and knew this only from articles in the national construction magazine, ENR. A large corporation, Evans was also in the market to replace PCs throughout its offices within the next 18 months-a fact that Don became aware of through his marketing group. This potentially represented sales of $20 million for Peach and a boost to the bottom line of $800,000 if Evans decided to purchase Peach computers instead of IBM. Its bid was 1 hour late and was $6,500,000.

What are the main issues in the case, and how would you begin to resolve them using some of the concepts we have discussed in class?

What alternatives are available to resolve the issues?

What type of contract incentive(s) could you adopt to make this case more successful and why?

Provide an analysis of the four bidders. What are the benefits and disadvantages of each supplier? Which bidder would you select and why?

What factors should be considered or addressed in the implementation? How would you implement your recommendation?

Do you feel that company politics would have an impact on the selection of the supplier?

Reference no: EM13224964

Questions Cloud

Define the mechanism for maleic acid to fumeric acid : Can anyone show a picture or a link to show me the mechanism for maleic acid to fumeric acid and include where the electrons are transferred from and where they are going
Find out the equlibrium constant for the reaction : At a certain temperature, reaction has equilibrium constant (Kc) of 1.9 x10^19. Determine the equlibrium constant for the reaction based on this information at the same temperature.
Formulate a linear programming solution to be used : Formulate a linear programming solution to be used to determine what the composition of a can of dog food should be to meet the various requirements at the minimum cost.
Find out the equlibrium constant for the reaction : At a certain temperature, reaction has equilibrium constant (Kc) of 1.9 x10^19. Determine the equlibrium constant for the reaction based on this information at the same temperature.
What alternatives are available to resolve the issues : What type of contract incentive(s) could you adopt to make this case more successful and why?
What would happen to fill rates and cycle service levels : Would fill rates go up, go down, or stay the same? Would cycle service levels go up, go down, or stay the same?
Calculate the most likely radius : For an electron in a hydrogen atom, compute the most likely radius (in Angstroms) of the electron in each of the following states:
Consider a project to develop new software inventory system : Consider a project to develop a new software inventory system. What are some of the resource constraints that would make the project challenging?
Explain reaction between nitrogen oxide and oxygen : the following statements is incorrect for the reaction between nitrogen (II) oxide and oxygen below

Reviews

Write a Review

Operation Management Questions & Answers

  Effectiveness of planning and consulting department

Assess the performance measures by which senior management will evaluate the effectiveness of the planning and consulting department regarding the department's role in the justification of the new hospital.

  Regular voting for directors of company

Discuss the pros and cons of cumulative voting vice regular voting for Directors of a company. Why would a company choose one over the other? Who benefits from each type: shareholders, management, directors, or some other entity

  Estimate the total storage square footage required

Two products are to be stored in a warehouse. Product A is 10" wide x 12" long x 3" high and is stored on 40" x 48" pallets. Product A can be stacked 7 layers high on each pallet and pallets of Product A are to be stacked 3 high in the warehouse.

  Illustrate range of output is theoretically possible line

Line will operate for 450 minutes per day. Illustrate what is minimum number of workstation needed if maximum output rate is to be sought. Illustrate what range of output is theoretically possible for line.

  Illustrate what networking avenues will you use to better

Illustrate what steps you will take to obtain additional skills you might need. Illustrate what networking avenues will you use to better understand your field of interest get advice also help you self-market.

  What are todays workers and americas view of the unions

What are today's workers and America's view of the unions

  True or false questions - mrp system

Bill of material errors can cause serious problems for MRP system calculations of dependant demands. No matter what forecasting technique is used, the probability of a production forecast being exactly correct is almost zero.

  Describe a project selection process

Describe a project selection process from either the literature or an organization of your choice. If it's from the literature, please submit the article; if it's an organization.

  A manager wants to determine the number of containers

A manager wants to determine the number of containers to use for incoming parts for a kanban system to be installed next month. The process will have a usage rate of 68 pieces per hour

  Analyze the different approaches to innovation

Analyze the different approaches to innovation discussed in this chapter to determine which approach you think would be the greatest value to the greatest number of organizations.

  Illustrate what are barriers to achieving se characteristics

Illustrate what are barriers to achieving se characteristics. Explain how would I know if organization was making progress towards becoming a learning organization.

  Product go through in order to produce an innovative change

Which one of the 4 Ps of innovation did the product go through in order to produce an innovative change? Is there any overlap with another one of the Ps? If so, which one? Explain.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd