Reference no: EM132386153
The Sunshine Health Corporation has requested you evaluate their Scottsdale, Arizona facility. The original structure was built in 1965. The facility has undergone several remodels aesthetically, with no real infrastructure changes. The facility is wired with coaxial cable and RJ11 for telephone. In 1995 each office and the production facility were wired with Cat 3 cable. Much of this cabling still exists. In 2001, the executive offices were wired with Cat 5 cable.
Upon inspection, none of the old cabling has been removed. The main communications room where telephone and networking equipment is housed has access to all the old cabling which is unlabeled. The client would like you to assess a modification plan for bringing this facility up to speed. Their previous contractor purchased several networking devices and was never able to get the equipment to operate at capacity. In your preliminary report, it was stated that wiring would need to be brought up to current networking needs in order to make best use of existing equipment. It appears there will be some need for upgrading equipment also as the wrong equipment was purchased.
For this assignment develop a plan of action for cleaning up the wiring structure, laying new fiber cable where necessary, and present the idea of developing wireless LANs, and Wi-Fi capability throughout the facility. Please discuss also potential cost savings upon completion of a plan.
The building is two stories of offices in the front of the building covering approximately 20,000 square feet between both floors. The remainder of the building is just over 200,000 square feet of two story warehouse that is used for storage in the very back, and manufacturing production in the front part a warehouse. All sections of the warehouse must have Internet capability as well as Intranet connectivity.
The assignment is rather broad and speaking in general terms. Have fun with this though please address the key areas. You also submit a proposed budget for the wiring, equipment, installation and testing. The assignment should be 2-3 pages of content not counting title page, reference page or appendices (diagrams, budget sheet, equipment list, etc.). Please follow APA format and use credible supporting materials to make your case.
What is the current value of the stock
: If the required rate of return is 16.0 percent, what is the current value of the stock? (Round answer to 2 decimal places, e.g. 15.25.)
|
How do we figure out carrying amount on these bonds
: How do we figure out carrying amount on these bonds? For me, it's a tough study question.
|
Identify a problem of homelessness in your hometown
: Identify a problem of homelessness in your hometown (this is oftentimes related to poverty, poor policy implementation, mental health issues, lack of relevant).
|
Bond coupon rate equals the market rate of interest
: What should be the current market value of one of these bonds if the option premium per bond is $15? Assume the bond coupon rate equals the market rate
|
Valuate their Scottsdale-Arizona facility
: The Sunshine Health Corporation has requested you evaluate their Scottsdale, Arizona facility. The original structure was built in 1965.
|
What is the price per share of firm a after the acquisition
: The net present value of the acquisition is $2,100. What is the price per share of Firm A after the acquisition?
|
Network access control and cloud security
: Network Access Control and Cloud Security. List and briefly define cloud service models. Describe some of the main cloud-specific security threats.
|
What return does security b bring in bad? times
: Suppose security A brings 6 percent per year in good times and 8 percent per year in bad times.
|
What is the current value of the stock
: Cullumber Corp. will pay dividends of $5.00, $6.25, $4.75, and $3.00 in the next four years. Thereafter, management expects the dividend growth rate
|