Use the euler methods and heun method to solve

Assignment Help Civil Engineering
Reference no: EM13548034

1.Solve the following initial value problem over the interval from t=0 to 2 where y(0)=1 a. Euler method with step h=0.5 b. Midpoint method with h= 0.5

2.Use the Euler Methods and Heun method to solve d2y/dt2-t+y=0 where y(0)=2 and y`(0)=0 solve from x=0 to 4 using h=0.1

Reference no: EM13548034

Questions Cloud

The annual mean vehicle miles of travel per household : The annual mean vehicle miles of travel per household
What is the probability the acc will have a team : What is the probability the ACC will have a team in the championship game and what is the probability that the championship game will not have a team from one of these two conferences
What is the standard deviation : The variance of some data is 37.33 what is the standard deviation?
What additional factors should terry consider when deciding : Terry wants to purchase a used car for $8000. The dealer offered to finance the deal at 8.5% APR for 4 years with 10% down payment. Terry's bank will provide a loan at 7.8% for 3 years
Use the euler methods and heun method to solve : Solve the following initial value problem over the interval from t=0 to 2 where y(0)=1 a. Euler method with step h=0.5 b. Midpoint method with h= 0.5
Are x and y independent : Are X and Y independent?
Find stresses in ab and bc and the displacement at point : A bar is under uniform axial loads. AB is 1 foot and has a area of .5 in^2 and BC is 1 foot and has an area of .3 in^2. AB has a 1000lb force putting it under tension and BC has a 500lb force putting it under compression. Find stresses in AB and BC a..
Find the optimal order quantity : Find the optimal order quantity.
Find the final stress in the bar : A bar 25in long attached to one wall was heated by 100 degress F. There is a .5 in gap between the bar and the other wall. The area of the bar is .5 in^2.The coefficient for expansion is .0004/F and the modulus of elasticity is 230 ksi. Find the fina..

Reviews

Write a Review

Civil Engineering Questions & Answers

  What is lump-sum equivalent cost of project at present time

A major relining of the combustion vessel will occur during the fifth year at a cost of $30,000. If the interest rate is 15% per year, what is the lump-sum equivalent cost of this project at the present time

  Maximum height of its centre of gravity

If a mass of 500kg is placed centrally on the top face of the buoy, find the maximum height of its centre of gravity above the bottom of the buoy so that the buoy may remain in stable equilibrium.

  Calculate relative velocity of solute front through aquifer

Calculate the relative velocity of a solute front that is flowing through an aquifer. The organic carbon partitioning coefficient (Koc) is 6 mL/g and the friction of organic carbon in the soil is 2%.

  Determine the average normal stress at the critical section

two 10 mm thick steel plates are fastened together by means of two 20mm bolts that fit tightly into the holes. if the joint transmits a tensile force of 45 kn determine the average normal stress in the plates at a section where no holes occur

  Iron and vanadium both have the bcc crystal structure and v

iron and vanadium both have the bcc crystal structure and v forms a substitutional solid solution in fe for

  Calculate the carbon concentration in steps into the depth

If the steel is decarburized in vacuum at 1000 C for one hour, calculate the carbon concentration in steps of 0.2 mm as you go into the depth of the steel (starting with x=0 at the surface) until you reach the overall concentration of 0.3 wt % car..

  Determine what is the maximum normal stress in the bar

If the bar is 90 degrees F. If the bar is cooled to 40 degrees F, what is the maximum normal stress in the bar and what is the maximum shear stress alpha = 13*10^-6 /degF, E = 10*10^3 ksi

  Find the limiting length of an offset of a point on paper

Find the limiting length of an offset so that the displacement of a point on paper is may not exceed 0.025 centimetres.The offset was laid 3 degree out from it's true direction and the scale was 10m to 1cm.

  Estimate the change in pressure over 100 m of pipeline

Water at 20 degrees flows at a velocity of (V =) 2 m/s in a (D =) 250-mm diameter horizontal ductile iron pipe. Estimate the friction factor f in the pipe, and state whether the pipe is hydraulically smooth or rough.

  Describe a soil classified as sw and a soil classified as ch

Describe a soil classified as SW and a soil classified as CH in the Unified Soil Classification System as you would to a person having no knowledge of soil classification procedures or equipment.

  Find an expression for the population after t hours

A bacteria culture grows with constant relative growth rate. After 2 hours there are 600 bacteria and after 8 hours the count is 75000 a.) Find the intitial population.

  Determine the total force needed to overcome axle friction

A 100-ton train traveling on a horizontal track requires 400 hp to maintain a constant speed of 50 mi/h. Determine (a) the total force needed to overcome axle friction, rolling resistance, and air resistance

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd