A venturi meter is placed in a pipeline to measure the flow rate of the liquid flowing through that pipe.The meter inlet and throat are connected by the two legs of a mercury manometer. Use the Bernoulli equation to describe how this manometer can be used to measure the flow rate through the meter.
A direct shear test is performed on a saturated specimen of loose sand. A normal stress equal to 100 kPa is applied and a maximum shear stress of 75 kPa is measured in the shear test. Determine the principal stresses and the orientation of these p..
what is effect of packing factor in self compacting concrete?
Determine the maximum and minimum stress intensities in the section.
The height (in meters) of a projectile shot vertically upward from a point 2 m above ground level with an initial velocity of 24.5 m/s is h2+24.5t-4.9t^2 after t seconds. a) When does the projectile reach its maximum height? b) What is the maximum..
Determine the magnitudes of the additional loads that must be applied at B and F if the resultant of all six loads is to pass through the center of the mat.
Assuming uniformly decelerated motion, determine the velocity and acceleration of point C of the belt, (a) immediately before the power is turned off. (b) 9 s later.
Also, at the failure cross sections the diameters are found to be 0.731 in., 0.645 in., and 0.587 in., respectively. Determine the percent elongation and percent reduction in area of each specimen.
determine the torsional buckling stress for the compression member if the length is 4m and cross section is the form shown. the ends are restrained such that there are not free to warp.given A:5646mm2 Ix:42.63Mmm4 Iy:14067Mmm4 E:210kN/mm2 G:80kN/m..
for this purpose replace this force by its equivalent of two forces at At Ft parallel and Fn perpendicular to the beam. Determine Ft and Fn.
You are a Project Manager on site where work for 3K.m. long Tunnel has been undertaken. The site is remote and takes about 2 days travel to nearest town. Supervisors, Technicians & Skilled Workers are engaged in dangerous / hazardous work.
Is the system within membrane manufacturer's warranty requirement of maximum flux rate of 14 gfd? What is the annual power cost of the RO system?
Determine the deflection of the right end of the pointer and the maximum deflection of the beam.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd