S M Construction has been awarded a contract to build a new manufacturing plant just outside Cardiff. The activity on arrow table below gives data on the activities involved in the plant's construction.

The total cost in completing the project in normal time is £2 million, excluding site overheads which are £8000 per week.

Table of Activities

Activity

Normal time (weeks)

Shortest time (weeks)

Reduction costs (per week)

1-2

6

4

£7000

1-3

8

4

£8000

1-4

5

3

£3000

2-4

6

3

£5000

2-5

5

3

£4000

3-6

10

8

£15,000

4-6

8

5

£6000

5-6

6

6

-

The board of directors of the company have asked you to produce a precedence (activity on node) diagram and to determine the following:

1. The critical path using normal times, the project's total duration and the total cost of completing the project.

2. The shortest time in which the project can be completed and the associated costs.

3. The lowest cost for which the project can be completed and the corresponding time.

All charts and derives costs, table etc. should be made available to the Board for inspection.

Critically appraise the use of appropriate project management software in carrying out this exercise.

What other software could you use to perform this exercise?

Reference no: EM13503182

Questions Cloud

Human spinal cord lumbar region : May I have help finding microscopic images with labels of the Human Meissner's Plexus Section and the Human Spinal Cord Lumbar Region?
Determine the magnitude of the jetliners momentum : A jetliner has a mass of 2.8 x 105 kg and flies at a speed of 190 m/s. If the speed of light in a vacuum had a hypothetical value of 350 m/s, what would be the magnitude of the jetliner's momentum
Explain saturated calomel electrodes to find the endpoint : Consider the titration of 25.0 mL or 0.010 M Sn^2+ by 0.050 M TI^3+ in 1 M HCL, using pt and saturated calomel electrodes to find the endpoint.
Estimate the final relativistic momentum of the ion : The speed of an ion in a particle accelerator is doubled from 0.400c to 0.800c. The initial relativistic momentum of the ion is 4.20 x 10-17 kg·m/s. estimate the final relativistic momentum of the ion
Use of appropriate project management software : Critically appraise the use of appropriate project management software in carrying out this exercise and what other software could you use to perform this exercise?
Different method of observational research : A friend of yours is absolutely convinced that he has a positive influence on the friendliness of conversations in which his is a participant. He has reached this conclusion on the basis of his everyday observations. You convince him that a system..
Explain titration of metal ion with edta : Titration of metal ion with EDTA. using the spreadsheet equation 11-11 to compute the curves (pM versys mL of EDTA added) for the titration of 10 mL of 1.00 mM M2+ (=Cd 2+ or Cu2+) with 10.0 mM EDTA at pH 5.00. Plot both curves on one graph.
Determine the average power carried by the wave : A piano wire with mass 2.65g and length 79.0cm is stretched with a tension of 34.0N. Calculate the average power carried by the wave
Explain the name and formula of the chromium oxide : 2.20 grams of chromium reacts with excess oxygen to give 3.22 grams of a chromium oxide. What is the name and formula of the chromium oxide. Write a balanced equation for the reaction

Reviews

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd