Use a suitable technique to calculate the cross sectional

Assignment Help Civil Engineering
Reference no: EM13581785

Task 1

You have been asked by your construction director to provide a prediction of short term sales growth for your company and to provide an assessment of several types of project that have been undertaken over the recent period. Your research has provided you with the following data:

Table 1

Year

Group Sales Value (£ million)

2001

18.2

2002

18.5

2003

21.9

2004

20.6

2005

22.7

2006

24.8

2007

26.9

2008

20.5

2008

17.3

2010

18.5

2011

19.4

          2012

20.8

Table 2

Project Type

No of Units

Sales value       (£ million)

Construction Cost (£ million)

Site Acquisition Cost (£ million)

Overhead Cost            (£ million)

Project Duration (months)

1

3

5.6

2.7

2.1

0.5

12

2

20

12.4

6.1

3.8

1.8

18

3

10

8.2

2.7

2.0

0.7

15

4

59

15.7

7.1

4.7

2.0

24

5

1

3.9

1.1

1.3

0.3

11

6

10

6.1

3.9

1.1

0.5

15

Predict the possible group sales values from table 1 for 2013, 2014 and 2015. You must use graphical means to support your prediction. 

Indicate which type(s) of project in table 2, in your opinion, would be the most suitable for the group to pursue in future. Use suitable data presentation analysis and comparison figures to justify your opinions. 

Task 2 - Surveying and setting out (LO2)

You are the QS for a project consisting of an apartment block being constructed on a site containing a hill.

The hill is of regular cross-section as indicated on the sketch below.

385_Graph.jpg

Use a suitable technique to calculate the cross sectional area of the hill indicated. Justify your use of that particular technique. 

If the development requires a 30m long length of the hill to be fully removed what would be the volume of soil to be excavated? 

Assuming an average bulking factor of 2.1 and density of 1400 kg/m3, how many lorry trips would be required to remove the excavated material, if the average lorry is loaded with 13 tonnes of material?

If the excavation above is to be carried out by two machines, A and B, what is the hourly output of each machine if it had been recorded on previous sites that:

If A worked for 5 hours and B worked for 8 hours 320 m3 of material could be excavated, and if A worked for 8 hours and B for 2 hours 270 m3 of material could be excavated. 

Task 3

Below are the co-ordinates of the corners of the basement for the above development that have been given by the architect, but the drawings will not be ready for another week.

Calculate the volume of  material that will have to be removed if the whole basement has a raft foundation of 600mm. 

Assume an even reduced dig to top of foundation level has been undertaken and all sides will be close dug with no shuttering.

Provide suitable drawings to illustrate your calculations.

Point

Easting

Northing

1

120.000

300.000

2

137.321

310.000

3

140.821

303.938

4

146.017

306.938

5

148.517

302.608

6

143.321

299.608

7

126.000

289.608

Piles are required for the above foundation. Provide a justification for how many piles are required and their diameter, if the total frictional area needs to be 560 m2 and the depth of each one has to be 5m. The base of each pile is taken as providing no friction. You should use multiple scenarios to provide data on which to base your opinions. 

Task 4 - Quality control

Below are the concrete cube crushing test results for a site earlier this year. You have been asked to provide feedback on the results obtained for a quality assurance audit.

All pours used the same specification concrete from the same batching plant. The specified 28 day strength is 40 N/mm2.

Pour Ref

01

02

03

04

05

06

07

08

09

10

Test Age

7

26.7

22.9

25.6

24.1

27.3

24.1

28.2

25.0

26.9

24.7

14

37.2

35.1

35.9

37.8

35.8

34.9

38.2

39.1

35.5

37.1

14

36.9

34.5

36.6

36.6

36.2

34.8

35.6

37.7

36.8

38.3

28

42.6

40.8

43.3

42.9

44.2

41.6

43.8

41.9

43.8

40.6

28

43.6

41.2

41.3

44.5

42.8

43.7

44.2

41.6

44.9

41.4

 

Pour Ref

11

12

13

14

15

16

17

18

19

20

Test Age

7

28.1

24.6

25.2

20.1

24.2

27.1

24.7

18.9

25.7

25.1

14

38.2

35.9

34.7

20.3

34.7

38.2

36.2

19.8

34.8

37.5

14

37.8

37.2

35.8

31.5

34.2

39.6

35.8

29.0

35.5

38.1

28

45.9

42.5

41.0

39.7

41.1

46.6

42.3

30.6

44.0

45.1

28

44.2

45.9

40.1

39.2

45.9

42.8

40.6

37.1

42.6

46.3

Use statistical analysis to obtain data to provide the basis for assessing the information.

Provide graphical representations of data that represents the information.

Provide your opinions and recommendations  based on the data. This should be based on both the raw data and your statistical analysis.

Reference no: EM13581785

Questions Cloud

Chan and fox have been able to reduce the companys fixed : chan and fox have been able to reduce the companys fixed costs by eliminating certain unnecessary expenditures and
A company had a beginning balance in retained earnings of : 1.a company issued 155 shares of 100 par value stock for 35500 cash. the total amount of contributed capital is
Savallas company is highly automated and uses computers to : savallas company is highly automated and uses computers to control manufacturing operations. the company uses a
A researcher conducted a study on the effects of stress on : a researcher conducted a study on the effects of stress on migraines. the researcher computed the number of migraines
Use a suitable technique to calculate the cross sectional : task 1you have been asked by your construction director to provide a prediction of short term sales growth for your
Bates company issued 1000000 9-year bonds and agreed to : bates company issued 1000000 9-year bonds and agreed to make annual sinking fund deposits of 73800. the deposits are
Mason co issued 840000 of five-year 13 bonds with interest : mason co. issued 840000 of five-year 13 bonds with interest payable semiannually at a market effective interest rate of
Gruden company produces golf discs which it normally sells : gruden company produces golf discs which it normally sells to retailers for 6.95 each. the cost of manufacturing 22400
Manley company planned to sell 40000 units this year at : manley company planned to sell 40000 units this year at 6.00 per unit. actual results indicate that 42000 units were

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the location e of the shear center

Determine the location e of the shear center, pt. O, for the thin-walled member having the cross section shown. The member segments have the same thickness t.

  What is friction of k and how does it work into the reaction

A 400 lb crate is on a 20 degree incline. If a 120 lb horizontal force (P), pushes on the crate (upwards), determine the normal and frictional forces acting on the crate. Take friction of surface = 0.3 and friction of k = 0.2?

  How many customers would be served pertruck if each home has

Making two runs per day, how many customers would be served pertruck if each home has once-per-week service and the truck is usedfive days per week?

  Determine what diameter pipe would be recommend

A circular concrete pipe (n = 0.012) carries a discharge of 450 cfs with a slope of 0.008 and is designed to run no more than 60% full (by depth). What diameter pipe would you recommend

  Determine the change in storage during

Athletic Lake has a surface area of 75.96 km2. In September, the evaporation was estimated to be 3.20 inches and the precipitation was 3.45 inches. The average flow rate of the River Tiger into the lake was determined to be 3.5 m3/s and the average f..

  Is the state water-quality standard being met downstream

If the state standard downstream is not met, the state has informed town 1 that it must treat its sewage further so the downstream standard is met. Use a mass balance approach to show that the state%u2019s request is unfeasible.

  Calculate the fraction of vocs in the exhaust

For a circular concrete column in a building with a diameter of 12" and subjected to an axial load of 200 kips, determine the stress exerted on the x-section of that column. What type of stress would it be?

  Determine the internal loads acting along the z-directions

The sign is attached to the post that is built-in at the ground. Treat the sign as having uniform mass. Neglect the contribution of the post weight. The length d is from the center plane of the sign to the center of the post.

  How to compute the normal depth of a trapezoidal channel

A trapezoidal channel with a bottom width of 4 feet and side slopes 2:1 (H:V) and a bed slope of 1 percent conveys a discharge of 50,000 gpm. Assume n = 0.025. Compute the normal depth.

  Determine the crest and sag vertical curves required

Two level sections of an east highway (G=0) are to be connected. Currently, the two sections of highway are seperated by a 4000-ft (horizontal distance), 2% grade. The westernmost section of highway is the higher of the two and is at elevation 100 ft..

  Diameter circular concrete pile required to take a design

Using a safety factor of 2.00 and neglecting the pile dead weight, find the length of a 1' diameter circular concrete pile required to take a design load of 50 kips in a soil composed of two layers.

  Calculate average flow rate and hydraulic gradient

A field sample of an aguifer is packed in a test cylinder. The cylinder has a length of 120 cm and a diameter of 12 cm. The field sample with a porosity of 0.24 is tested under a constan

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd