Unit 6 Construction Information Assignment

Assignment Help Civil Engineering
Reference no: EM132912214

Unit 6 Construction Information (Drawing, Detailing, Specification) - Higher National Certificate/Diploma in Construction and the Built Environment

Assignment - Evaluating and Critiquing Collaborative Construction Information

Learning Outcome 1: Interpret different types of construction information in order to explain a construction project.

Learning Outcome 2: Assess ways in which construction professionals collaborate in the production of construction information.

Scenario:

Using an actual construction project that you have agreed with your tutor, prepare a drawing comments schedule, to relate the project's drawings to its specification, and evaluate the information provided, highlighting any issues such as clarity, annotation, symbols and particularly ‘clashes' that will result in construction site issues (LO3).
Use the same project to describe how the design team members, such as the structural engineer, contribute to construction-status information using digital design media, focusing on the process of design coordination (LO4).
Tutor's commentary -

A drawing comments schedule is one way in which a designer, typically an Architect or Engineer, will provide feedback on design proposals drawn by other members of the project team, such as a sub- contractor with design responsibility.

In the context of a small project, this schedule could be as simple as ‘red-lining' drawings, to show where further work is required (such as parts of construction which are not clear, areas of annotation which are confusing, or where information is lacking).

With larger projects, the process becomes more complex because there may be many people whose input is essential. Scheduling drawing comments therefore becomes a live ‘fluid' and interactive process. Current examples include output recorded in a pdf file (which ‘freezes' the construction information at that point in time) or within a shared BIM model, controlled by a project administrator. Ideally, such methods also enable notifications to be sent automatically to key personnel, such as designers, contractors and stakeholders.

To achieve task M3, you will need to evidence your understanding of construction information protocols. You will also need to discuss best practice. This could be done by highlighting relevant standards, such as BS1192, or researching common methods within the industry.

To achieve task M4, you will need to evidence your understanding of each method of providing drawings and documents, both CAD and BIM. This could be achieved by explaining each process in turn and highlighting the differences in the actual information inputted and outputted.

To achieve task D2, you will need to be familiar with methods of correcting construction information. You will also need to explain your rationale behind tackling the corrections in the way you have.

Attachment:- Construction Information.rar

Reference no: EM132912214

Questions Cloud

Find a recent article or video describing the competition : Find a recent article or video describing the competition between two or more businesses. Post a link to the article or video in the discussion thread
Identify the challenges faced by the london health sciences : Identify the challenges faced by the London Health Sciences Centre and What sort of leadership style should be used to push for improvement
Develop paper describing how the knowledge : Develop a paper describing how the knowledge, skills, or theories of this course (Operational Excellence) have been applied or could be applied,
Define business intelligence : How would one define business intelligence (BI)? Identify and briefly discuss a real-world application of BI?
Unit 6 Construction Information Assignment : Unit 6 Construction Information Assignment Help and Solution, Higher National Certificate/Diploma in Construction and the Built Environment - Assessment
Most popular countries for it outsourcing : According to recent surveys, China, India, and the Philippines are the three most popular countries for IT outsourcing.
Better job minimizing the risk of failure : Discuss what went wrong, what went right, and how the company could have done a better job minimizing the risk of failure.
Describe some of main cloud-specific security threats : Provide a brief definition of network access control. What is the function of IEEE 802.1X? Describe some of the main cloud-specific security threats.
Impacts of leadership : An important step in a dissertation is the theoretical basis that might help explain and shed light on why the problem is happening

Reviews

Write a Review

Civil Engineering Questions & Answers

  Develop equation that determines mass of finishing rods

When in use, a fishing rod can be approximated to act as a cantilevered beam. Assume that the force (P) is applied to the end of the beam by a fish while the fisherman rigidly holds the other end of the beam.

  Design a drainage and pumping system

You are required to design a drainage and pumping system to deal with the mine water for the next 10-15 years based on the data - Describe your proposed drainage and pumping system with the aid of diagrams where required and explain the general phil..

  Calculate the per capita contribution of domestic flow

A rural town with sewered population of 4,500 has a daily wastewater flow of 1,590 m3/day with an average BOD of 280 mg/L including industrial wastes. The industrial discharges to the municipal sewers are 57 m3/day at 1,800 mg/L BOD

  Describe a piece of john deere agricultural equipment

Describe a piece of John Deere agricultural equipment that utilizes GPS hardware and software. Describe how many RECs are placed on the equipment and where it is placed.

  What are the northing and easting coordinates

Circular contours tightly spaced around each other with increasing contour interval elevations towards the inner most contours indicate the presence - For a traverse of perimeter P = 574.66 feet, a summation of latitudes equal to +0.15, and a summ..

  Estimate the time of submersion in years of the plate

Apiece of corroded steel plate was found in a submerged ocean vessel. it was estimated that the original area of the plate was 62.5cm 2 and approximately 2.8k had corroded away during the submersion.

  Determine the magnitude of the average force acting

Determine the magnitude of the average force acting on a highway bumper when a 5000-lb car traveling at 60 mph crashes against it. The time interval during which the car is brought to rest is 0.3 s.

  Find the specific heat capacity of iron at steady state

an iron cube at 400 degrees Celsius is dropped into a insulated bath containing 10kg of water  25 degrees Celsius. the water finally reaches a temperature of 50 degrees Celsius at steady state.

  Spreader beam and hoisted by a crane

The 3.5mg engine is suspended from a 500 kg spreader beam and hoisted by a crane which gives it an acceleration of 4m/s^2 when it has a velocity of 2m/s. determine the force in chains AC and AD during the lift.

  Calculate the magnitude of the total force supported

Calculate the magnitude of the total force supported by the connection at A if the truck starts from rest with an acceleration of 5 m/s2

  What distance will the concentration of the metals be

Another way to treat acid mine drainage is to add limestone at the beginning of a narrow AMD stream to precipitate the metals. The first order rate constant is 10/day. Assume the stream is 3ft wide and 1ft deep

  Determine what is the resultant thermal energy

The specific heat (C sub p) of aluminum is 0.214 calories per gram degrees Celsius (0.214 cal/g-C). If a cube of aluminum with a mass of 13.6 kg exhibits a change in temperature of +30 degrees Celsuis, what is the resultant thermal energy

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd