Unit 53 Utilization of Electrical Power - Pearson BTEC Level 5 Higher National Diploma in Engineering

Assignment - Analysis of Electrical Power systems & create balanced energy budget.

Learning Outcome 1: Examine the demands, sources and construction of electrical power generation and distribution systems.

Learning Outcome 2: Explore the interconnections of power systems and their protection to explain the critical processes and the effects of failure and the importance of electrical safety.

Assignment brief

Purpose of this assignment is to test your understanding on
• Key aspects of country's energy supply, demand and losses for creating a balanced energy budget.
• Quantifying the data and forecasting the energy trends.
• Key aspects of three phase power systems using distributed generators, loads and protection.
• Power factor correction techniques and methods used to maintain good Power quality.

Scenario

Pinnacle Energy Consultants provides the best Energy solutions for residential, colleges, universities and commercial buildings by conducting systematic energy audits. Assume you are doing apprenticeship under a Registered Electrical Energy Manager (REEM) of Pinnacle Energy Consultants.

REEM does the audit of the energy generation, conversion and consumption, also ensures that the energy being used efficiently maintain high power quality. To be a young Energy auditor you are supposed to know the features of energy supply, conversion systems, losses and the demand consumption. Also in order to provide the energy solutions you should be able to apply forecasting methods to predict the future trends, able to have good understanding on power factor improvement techniques and various methods applied to maintain good power quality.

At the end of your apprenticeship period your Manager has set the below tasks to certify you as a registered Energy Auditor.

Task 1 This task provides evidence

Energy is an vital commodity for a country's development and its economic growth.
Submit a detailed report on the following tasks

1. Produce a report on quantitative analysis on the electricity production and consumption in Bahrain, by referring to the government websites given in sources of information.

2. Being done the quantitative analysis in task1.1, discuss the key aspects that you had examined to create a country's balanced energy budget. Choose a simple electric system (kettle, coffee maker, egg boiler, room heater, electric pump etc.,) as an example to produce the energy balance budget for the same. Map the energy chain system to the country level (Bahrain) by discussing the primary energy forms, conversion mechanisms, transmission, and final energy consumption considering the losses and efficiency factors at various stages.

3. Apply any of the forecasting methods to predict the future trends of the electricity load demand and supply availability for the annual data given in table.1.

4. Critically evaluate the governmental policies/actions/initiations for managing the Bahrain's energy supply demand balance with justified comments and recommendations.

 

Month

Average Peak Load Demand (MW)

Average System Generation Availability (MW)

January

1428

2934

February

1525

2346

March

1659

3648

April

2293

3475

May

2845

3557

June

3247

3814

July

3315

3914

August

3418

4003

September

3346

3914

October

2540

3348

November

2263

3168

December

1699

3094

Table 1

Task 2 This task provides evidence

538_task.jpg

Figure 1

Figure.1 represents the single line diagram of three phase power system interconnecting two areas. The following assumptions are applied for the power system in figure.1 the Area-2 cumulative loads are represented in approximate proportionates, the transformer connections at bus links is not shown and assumed their reactance and losses to be negligibly small.

The Area-2 load is supplied from 11kV, 50Hz bus by L km long three phase transmission line having resistance of 0.12Ω/phase/km and reactance of 0.36Ω/phase/km respectively from power generating station bus (area-1). The sector wise power demand at 11kV bus of area-2 is given in table.2 as separate data set against each trainee's Identity number.

Trainee Id.No

Length     of tr. Line.

( L kM)

Industry Load (KW)

Club house (KW)

Residential complex (KW)

20190535

65

10000, 0.8 P.F

460, 0.88 P.F

2800, 0.8 P.F

Table.2

1. Calculate the transmission line losses and efficiency of the two bus three phase power system.

2. Determine the capacitor rating and value to improve the power factor at 11kV bus to Unity power factor.

3. Calculate the transmission line losses and efficiency for the modified three phase power system placing the designed capacitor to improve power factor and compare the results with task2.1. There by list the advantages of power factor improvement.

4. Simulate the two three phase power systems of task2.1 and task2.3 and analyse and interpret your calculation results to simulation results.

5. If the club house at area-2 is required to be powered from a distribution generation station, explore the key aspects of the three phase system shown in figure.1 using distributed energy generation, nature of loads and the different protection schemes adopted.

6. List the possible power quality issues that could be encountered in the power system shown in figure.1. Critically evaluate at least two technologies used to improve power quality and illustrate the advantages of application of such methods through Matlab simulations or otherwise (high technical English language).

Attachment:- Analysis of Electrical Power systems.rar

Reference no: EM132849905

Questions Cloud

How treatment for depression has evolved over the past years : How treatment for depression has evolved over the past 100 years.Requirements for enlisting in the U.S. military (whether the Army, Air Force, Navy, Marines)
Significant impact on businesses and industries : We have viewed how Blockchain has made a significant impact on businesses and industries.
What are challenges to mobile forensics : What are challenges to mobile forensics? What are some mobile forensic tools? Should the analysis be different on iOS vs Android?
How many dresses that the company needs to sell : Currently, each dress is selling at $50 and the variable cost per dress is $20 per dress. How many dresses that the company needs to sell
Unit 53 Utilization of Electrical Power Assignment : Unit 53 Utilization of Electrical Power Assignment Help and Solution, Pearson BTEC Level 5 Higher National Diploma in Engineering - Assessment Writing Service
Legal exceptions to employment at will doctrine : Define employment at will. Are there legal exceptions to the employment-at-will doctrine?
Provide the maintenance efficiency variance : You have standard of 5 minutes of machine time per unit produced and $20 of maintenance cost per hour. Provide the maintenance efficiency variance
Discuss some of the software engineering : Discuss some of the "Software Engineering " constraints that must be overcome in order to build a successful system.
Fastest-growing forms of online marketing : Today, social, mobile, and local marketing are the fastest-growing forms of online marketing.

Reviews

Write a Review

Other Engineering Questions & Answers

  Write an analysis function to call optimistic median

Correct the program you wrote in the previous exercise to copy from u into v. Write an analysis function to call optimistic median.

  Describe each of the major components in a plc system

Describe each of the major components in a PLC system. What is the difference between fixed and modular I/O? The Allen Bradley SLC system input address is I:3/12. Describe what each value in the address represents.

  Why is the given device also referred to as a transducer

Why is this device also referred to as a "transducer"? What are some other common types of transducers that you are familiar with?

  Determining pile design by using standard method

DETERMINING PILE DESIGN BY USING STANDARD AND MEYERHOFF METHOD. DETERMINING SUBSURFACE CONDITIONS BY LOOKING AT BORING DATA.

  Determine the incremental areas and pipe lengths

ENEC14017 Water Resources Engineering - Determine the rainfall depth and Draw the 10 histograms - Estimate the hydrograph

  Implement speech coding algorithms

Understand and implement predictive coders - implement speech coding algorithms and gain an understanding of their computational complexity.

  Given an arithmetic equation or data conversion

1. Given an arithmetic equation or data conversion, develop an assembly-language algorithm to implement the correct sequence of operations. 2. Learn how to design assembly-language programs that require decision logic in order to accompli..

  Analyze an existing design of a small UAV

CS 8803-O09 Project Crazyflie design and analysis using AADL. For this project, we aim at using AADL to analyze an existing design of a small UAV

  Evaluate the reasons for the great depression

Discuss the early formation of the political system of the newly independent United States of America.contrast slavery in the Americas with slavery

  Write the minimal sum-of-product equations

Write the minimal sum-of-product equations through the K-map. One equation for each input of the flip-flops and one equation for the output.

  How fema works with local emergency management services

Identify improvements instituted by the Post-Katrina Emergency Reform Act of 2006 and how they affected emergency response and recovery

  Simulation of industrial systems

To provide you with the experience of performing a substantial simulation study. With Rockwell Arena software, you will model a real world system.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd