Unit 4 Construction Practice and Management Assignment

Assignment Help Civil Engineering
Reference no: EM132607713 , Length: 3000 Words

Unit 4 Construction Practice and Management - Higher National Certificate/Diploma in Construction and the Built Environment

Learning Outcome 1: Describe the construction industry with reference to company structures and other activities

Learning Outcome 2: Explain different types of construction companies within the market and their relationships within the tendering process.

Learning Outcome 3: Discuss the key stages in a construction project, and how Building Information Modelling informs the different stages.

Learning Outcome 4: Analyse how the construction industry has developed suitable collaboration strategies in support of greater recognition of health & safety

Assignment Brief

You have been working for a medium sized family-owned construction firm. Much of the work of this firm has been in private residential work, but under new management there is a desire to begin to undertake larger scale non-domestic work. In order for this change to be managed effectively, the company will need to change its structure. The management team recognises a relationship between the structure of the company and the relationships that they may form, through contracts, tendering and other activities.

You have been asked to prepare a report on the different options available to the company, in terms of company structure, and the benefits and/or challenges that the options present.

They were the winning bidder to be the principal contractor on a new purpose built industrial park

This assignment has four sections in line with the four learning outcomes covered by all Tasks provided starting with an initial holistic scenario acting as a case study:

Scenario:

You have been appointed to prepare an initial conceptual design and implementation report on Industrial Complex (2 km by 2 km) near a couple of near parallel highways 12km apart that both link the megacity of London to an international airport in the outskirts of London, Heathrow to be specific. The site of this complex is separated from one of the highways by a large fast flowing River that flows parallel to these highways and finally finds its way into the River Thames. This River which is about 20m wide lies in the middle of the 4 kilometer land space between the chosen Industrial complex site and one of the two highways.

The Client who is a private investor needs twenty (20) industrial building(s) and factories manufacturing baby foods, soaps, perfumes amongst several other commodities. This site is proposed together with some inter-connecting Infrastructure to the highway on the other side of the site 6 km away the river, which is not only necessary but required as a key element of the project. The factory buildings are made of both steel, concrete and other materials (to be specified). These industrial and factory buildings are provided as key structures of high specification that are intended to be built for the long term duration in this part of south of England, around the Heathrow Airport. The Industrial complex can be developed with steel or concrete or alternatives or a combination. The access interconnecting infrastructure roads to both highways can be flexible or rigid and the bridge across the stream and the walkway across the highways can be made of either RC concrete or steel, all in line with your choices for the project

Part 1
(a) Explain how the construction industry has developed and encompassed professionalism within its structures.
(b) Demonstrate the scope and linkage between all parties within a construction organisation. In general and with respect to the scenario provided.
(c) Identify different types of contractual work tendered by contractors and justify the use of the specific type of tender for the given industrial complex scenario.
(d) Analyse how the construction industry has developed overall in terms of company structures, its employees and contracted work. Justify the company structure you will choose for the current scenario.
(e) Critically evaluate how construction companies have developed their structure and business ethos. What is its impact on the scenario provided?

Part 2
(a) Identify the different types of construction companies in the market and the key features of different types. Suggest the type of Construction Company for the given scenario and justify its suitability.
(b) Explain the relationship that may exist between the companies working on the construction project.
(c) Analyse the link which connects construction companies.
(d) Compare the main factors which differentiate between construction company contracts and tenders.

Part 3
(a) Identify, with examples, modern construction processes and sequences used within today's industry, highlighting the way they respond to sustainability needs in the current scenario.
(b) Explain contract planning techniques used within micro and macro projects. Choose the most suitable contract planning techniques for the current scenario and justify their suitability.
(c) Identify where BIM impacts upon operations and construction companies in the current scenario
(d) Analyse how construction has developed in terms of innovation, designs, and within contracts for micro and macro projects, and the interrelationship with BIM. How it will benefit the current scenario.

Part 4
(a) Explain how health & safety has now become an integrated part of the construction process.
(b) Describe the government legislation which has benchmarked health & safety within construction. In general and with reference to the current scenario.
(c) Discuss the role of collaboration and communication in ensuring safe working practices. By considering the current scenario as an example.
(d) Demonstrate how the construction industry has benefited through changes in health & safety legislation.
(e) Evaluate the impact of health & safety legislation, how it has evolved the drivers for it, and its advantages or weaknesses within construction.

Attachment:- Construction practice and Management.rar

Reference no: EM132607713

Questions Cloud

Which product features best suit a hybrid costing system : Which product features would best suit a hybrid costing system? Identical and very similar features./ Identical and unique features
Determine upton projected external capital requirements : Upton Computers makes bulk purchases of small computers, stocks them in conveniently located warehouses, ships them
What is the result for underestimated the manufacturing : If a manufacturer underestimated the manufacturing overhead budget and overestimates the activity base for the year, what is the result?
Secure internet messaging application : Your imaginary company is in need of a secure Internet messaging application for your employees.
Unit 4 Construction Practice and Management Assignment : Unit 4 Construction Practice and Management Assignment Help and Solution, Higher National Certificate/Diploma in Construction and the Built Environment
What would be the pros and cons of margin financing : Consider an an investor who purchases 100 shares of Company XYZ stock at $100 per share. The investor funds half the purchase price
Write down the description of the organism or virus : Review global news and find an article that discusses a relationship between a microorganism/virus and the health of another animal (which may include humans!).
What are the two principal reasons for holding cash : What are the two principal reasons for holding cash? Can a firm estimate it's target cash balance by summing the cash held to satisfy each of the two reasons?
Which is ethical standard of conduct for managerial account : Which of the following is an ethical standard of conduct for managerial accountants? Confidentiality./ Objectivity./ Confidentiality

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd