Two pieces of steel are held together with six bolts one

Assignment Help Civil Engineering
Reference no: EM13384049

Two pieces of steel are held together with six bolts. One end of the first piece of steel is welded to a beam and the second piece of steel is bolted to the first. There is a load of 54,000 pounds applied to the end of the second piece of steel. The tensile strength of steel is 74,000 psi, the shear strength is 48,000 psi.
a) Calculate the diameter of the bolts needed to support the load.
b) Find the width of the steel if the thickness of the steel is 1/4Â?. The bolt holes are 1/16Â? larger than the bolt.  

Reference no: EM13384049

Questions Cloud

In the non-inertial cs fixed at the top of the vertical : the linkage shown below is made up of two 3-kg rectangular members 0.4 m by 0.1 m and is flying through the air. at the
Effect of acidic water on strength of soil used to store : effect of acidic water on strength of soil used to store the water. the reduction in strength at various acidic ph
The rate constant for the first order decomposition of a : the rate constant for the first order decomposition of a compound a in the reaction 2ap is k 2.7810-7s at 25oc. what is
An environmental chemist needs a carbonate buffer of ph : an environmental chemist needs a carbonate buffer of ph 10.00 to study the effects of acid rain on limestonerich soils.
Two pieces of steel are held together with six bolts one : two pieces of steel are held together with six bolts. one end of the first piece of steel is welded to a beam and the
The solubility of silver sulfate in water is 0223 wv at : the solubility of silver sulfate in water is 0.223 wv at 35degc. calculate the solubility product of this salt at this
Using only the category of property damage what would the : 1.what would the bc ratio be if the light poles were twice as far apart as assumed above?2. what is the ratio of night
Determine the mass of aluminum acetate that can be made if : determine the mass of aluminum acetate that can be made if you do the reaction with 125 grams of acetic acid and 275
A drinking water treatment plant will be designed to : a drinking water treatment plant will be designed to process a flow of 15000 m3d. the sedimentation tank will have a

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the moisture content and overall specific weight

A sample of argillaceous soil with a volume of 1x10-3 m3 and a mass of 1.762 kg, after oven dried, has a mass of 1.368 kg. The relative density of the grains is equal to 2.69. Determine, for the sample in its original condition

  What is the minimum chain length for the application

A motorcycle sprocket on the rear wheel has a diameter of 24 cm, and trhe driver sprocket has a diameter of 4.0 cm. The driver sprocket shaft and rear axle are 60 cm apart.

  What is the total volume of the vocs emitted each day

Assume that there were 1,100,000 vehicles making a 28.5-mi round trip per day, the average vehicle emission rate for VOCs is 1.3 g/VM , and the molecular weight of the VOC emissions from the mobile sources can still be represented by that of metha..

  A 1 18 45 mix has a watercement ratio of 06 and a cement

a 1 1.8 4.5 mix has a watercement ratio of 0.6 and a cement content of 300 kgm3. the temperature of the ingredients

  What is nominal yearly interest rate on a loan with interest

what is the nominal yearly interest rate on a loan with quarterly interest of 3% with quarterly compounding

  Determine the pressure variation in the flow field

A plane flow field is developed by addition of a free vortex and a uniform stream in the positive x direction. If the vortex is located a distance a from the origin, find the pressure variation in the flow field.

  Determine the minimum footing length l of the columns

Assume a value of B, compute the allowable bearing capacity, then solve for B. Show at least 1 iteration with whatever assumed width irrespective of whether or not you get the desired Factor of safety.

  What is the maximum height

The height (in meters) of a projectile shot vertically upward from a point 2 m above ground level with an initial velocity of 24.5 m/s is h2+24.5t-4.9t^2 after t seconds. a) When does the projectile reach its maximum height? b) What is the maximum..

  How many rapid sand filters are needed for the plant

A water treatment plant is being designed for a flow of 1.6 m^3/s. How many rapid sand filters, using only sand as the medium, are needed for this plant if cross-sectional area of each filter is 10 m x 20 m

  Calculate the rate of removal and the rate constant

A toxic compound being is removed from solution in a CSTR at Steady State according to a first order reaction rate. The upstream concentration of the pollutant is 14 mg/L and the downstream concentration is 1.7 mg/L.

  Determine the maximum bending stress in the strap

An L2 steel strap having a thickness of 0.125 in. and a widthof 2 in. is bent into a circular arc of radius 600 in. Determine the maximum bending stress in the strap.

  Find what was the pan evaporation rate in inches per day

Over the course of 3days, she added another 6lbs of water and at the end of 3days, there was 67lbs of water remaining. A nearby rain gage recorded 0.4 inches of precipitation over the period.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd