Reference no: EM133159116 , Length: 14000 word
Prepare Thesis on The Role of Monitoring and Control in the successful delivery of Construction Projects
1. INTRODUCTION (500 words)
1.1 Introduction
1.2 Study Background
1.3 Research problem
1.4 Research Aimsand Objectives.
Aim:
The main aim of the research study is to develop a framework that can provide procedures and solutions to implement effective Monitoring and Control processes in construction projects that can help in increasing the chances of achieving successful project outcomes - A study in Development countries.
Objectives:
For the successful accomplishment of the above research aim, the objectives of this study will include the following:
• To assess the most commonly used methods and approaches to Monitoring and controlling construction projects, particularly in the developed countries.
• To create a robust, complete, and comprehensive approach to Monitoring and controlling construction projects.
• To determine the key elements of the Monitor and Control process and analyzehow they can be implemented during the project lifecycle.
• To recommend the appropriate Tools, Techniques, and methodologies that can be utilizedto enhance construction project performance through effective Monitoring and Control.
Research Questions.
The main research question which will be answered in the current research work is as follows:
• What are the commonly used methods, tools, and approaches for Monitoring and controlling construction projects in the GCC countries?
• How can an effective model of Monitoring and controlling construction projects be developed?
• What are the key elements of the monitor and control process, and how can they be implemented during the project lifecycle?
• What are the most effective Monitoring and control tools and techniques that can enhance the construction project performance?
CHAPTER TWO
2. LITERATUREREVIEW(5000 words)
2.1 Overview of the Construction Industry
2.2 Delay Causes in Construction Projects
2.3 Success Factors of Construction Projects
2.4 The Role of Monitoring and Control in Construction Projects
2.5 Tools, Techniques, and approaches ofMonitoring and Controlin Construction Projects.
CHAPTER THREE
3. RESEARCH METHODOLOGY(2000 words)
CHAPTER FOUR
4. RESULTS AND DISCUSSIONS(5000 words)
The results should be presented in a logical manner using tables and figures as necessary.This section should not be just a description of your results but should include a discussion and evaluation of the findings you have made, and relate your results back to your aim and objectives and literature review.
CHAPTER FIVE
5. CONCLUSIONS AND RECOMMENDATIONS(1500 words)
Your conclusions are a summary of your overall findings and should relate to your original aim, objectives, and hypotheses.
6. REFERENCES
Attachment:- Construction Projects.rar