Reference no: EM132241236
There are FIVE processing station in a production system: P1, P2, P3, P4 and P5. The times taken at each process are as follows 2 minutes, 6 minutes, 4 minutes, 9.8 and 14 minutes. Job request inflow rate is 20 per hour and jobs requests are accepted for six hours only. The systems closes after all accepted jobs have been completed, that is at the closing there are no unfinished jobs in the system.
The system capacity = /hour
The average waiting time in the system in minutes is = minutes
The throughput time of the system is = minutes
The average inventory in the system is = jobs
The average waiting time before P2 = minutes
The average waiting time before P3 = minutes
The average waiting time before P4 = minutes
The average waiting time before P5 = minutes