Referring to the multi station serial system in the Series Simulation.xlsm file, let si and 1/µi be the number of machines and the mean processing time at station i. Then the mean processing rate at station i is siµi. You might expect the system to operate well only if each siµi is greater than λ, the arrival rate to station 1. This problem asks you to experiment with the simulation to gain some insights into congestion. For each of the following parts, assume a Poisson arrival rate of λ = 1 per minute, and assume that processing times are exponentially distributed. Each part should be answered independently. For each, you should discuss the most important outputs from your simulation.
a. Each station has si = 1 and the µi s are constant from station to station. There are 100 (essentially unlimited) buffers in front of all stations after station 1. Each processing time has mean 1/µi = 0.6 minute and there are three stations.
b. Same as part a, except that there are 10 stations.
c. Same as part a, except that each processing time has mean 0.9 minute.
d. Same as part c, except that there are 10 stations.
e. Repeat parts a to d but now assume there are only two buffers in front of each station.
Hubbard argues that the Fed can control the Fed funds rate, but the interest rate that is important for the economy is a longer-term real rate of interest. How much control does the Fed have over this longer real rate?
Coures:- Fundamental Accounting Principles: - Explain the goals and uses of special journals.
Accounting problems, Draw a detailed timeline incorporating the dividends, calculate the exact Payback Period b) the discounted Payback Period. the IRR, the NPV, the Profitability Index.
Term Structure of Interest Rates
Write a report on Internal Controls
Prepare the bank reconciliation for company.
Create a cost-benefit analysis to evaluate the project
Theory of Interest: NPV, IRR, Nominal and Real, Amortization, Sinking Fund, TWRR, DWRR
Distinguish between liquidity and profitability.
Your Corp, Inc. has a corporate tax rate of 35%. Please calculate their after tax cost of debt expressed as a percentage. Your Corp, Inc. has several outstanding bond issues all of which require semiannual interest payments.
Simple Interest, Compound interest, discount rate, force of interest, AV, PV
CAPM and Venture Capital
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd