The existing flash mixer is about 20 years old and needs to

Assignment Help Civil Engineering
Reference no: EM13384333

An existing water treatment plant is producing an average flow of 0.5 MGD. Due to several limitations the plant only has to operate from 9:00 AM to 5:00 PM. As a consulting engineer you are hired to evaluate the operation and the unit processes within the plant and make recommendations for improvements. You are asked to consider the following units.

1. The existing flash mixer is about 20 years old and needs to be replaced. What is your recommended horsepower for a new mixer (calculate both winter and summer conditions). Is there adequate detention time in the flash mix basin?

2. The plant uses a two-stage flocculator with two equal compartments. The flocculator motors in the two compartments are 1 and 1/2 horsepower, respectively. Calculate the "G" values of the two stages and comment on their acceptability for the winter condition. 

3. Calculate the detention time, horizontal velocity, overflow rate, and weir loading rate of the sedimentation basin. Assume a simple weir across each tank (i.e. weir length is the width of the tank). Comment on the value of each parameter calculated.

4. A filter unit is 15 ft by 30 ft. After filtering 2.5 million gallons in a 24 hour period, the filter is backwashed at a rate of 15 gpm/sq ft for 12 min. Compute the average filtration rate and the quantity and percentage of treated water used in backwashing. Explain the concepts of air scouring and filter to waste related to the filter backwash process.

5. A conventional surface-water plant with coagulation, flocculation, sedimentation, and filtration produces filtered water with turbidity less than 0.3 NTU, pH 7, and temperature of 10oC at design flow of 2.5 MGD. After filtration, the water is chlorinated in a baffled reservoir with t10 value of 56 min.
a) What is the significance of t10 and why is it used in disinfection?
b) What is the required disinfection of the filtered water using free chlorine?
c) If the plant were to use direct filtration without coagulation, flocculation and sedimentation, what would be the required disinfection of the filtered water? 

 

Reference no: EM13384333

Questions Cloud

The bolt holes in the flange at a were supposed to align : the steel g 12000 ksi pipe shown in the adjoining figure is fixed to the wall support at c.nbspthe bolt holes in the
A sample of gas is collected over water at a temperature : a sample of gas is collected over water at a temperature of 35 c when the barometric pressure reading is 742 torr. what
The small bubbles that form on the bottom of a water pot : the small bubbles that form on the bottom of a water pot that is being heated before boiling are due to dissolved air
Methane and air in stoichiometric proportions are brought : methane and air in stoichiometric proportions are brought into a calorimeter at 500k. the product compositions is
The existing flash mixer is about 20 years old and needs to : an existing water treatment plant is producing an average flow of 0.5 mgd. due to several limitations the plant only
Calculate the molar mass of the biomolecule for carbon : a 5.00 g sample of a large biomolecule was dissolved in 13.0 g of carbon tetrachloride. the boiling point of this
The balanced equation for this reaction is c3h8 5o2 --gt : propane c3h8 burns im oxygen to produce carbon dioxide and water vapor. the balanced equation for this reaction is c3h8
The freezing point of t-butanol is 2550degc and kf is : the freezing point of t-butanol is 25.50degc and kf is 9.1degc middot kgmol. usually t-butanol absorbs water on
In the barium chloride laboratory activity what change : in the barium chloride laboratory activity what change occurred in the physical appearance of the barium chloride

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd