THE BIG D COMPANY

The Big D Company of Dallas, Texas, was a family-owned, conservatively managed company. For over forty years the company enjoyed slow, steady growth in reaching its current employment level of just over 200. All expansions were financed entirely out of earnings. As the company grew, its operating procedures were periodically reexamined and modified to cope with the complex problems that accompany growth. The company developed, manufactured, and sold metering and flow control devices used in the chemical industry. Recently, as a result of declining profits, management was considering the advisability of installing a more formal system for controlling its cost of materials.

The company’s product line contained about forty items, ranging in size from gauges and simple fittings to large flow meters weighing up to 150 pounds. Most of these were made in a number of different models and sizes, so that the total number of separate products was about 300. About half were standard models whose design had not changed greatly in the last ten years; others were subject to considerable technological change; a few involved special features for different customers, sometimes being made of special alloys to resist corrosive action of certain chemicals. Some of the more complex items were supplied with or without certain fittings and refinements. The company’s position in the industry depended on its ability to keep ahead of its competitors in design, quality of product, customer service, and price—roughly in that order.

It was the responsibility of the supply manager to obtain the castings, materials, and parts indicated. Castings were purchased in the exact quantity required for the manufacturing order. For the most part, the same was true as to bar stock, plate, and similar materials. On the highly standard material sizes, more than enough for one order might be purchased, and in most cases full lengths would be ordered, rather than the exact fraction required. On odd sizes of expensive alloys, the exact amount would be purchased even down to the inch. Standard nuts, bolts, studs, pipe fittings, and similar items were usually bought in standard commercial lot quantities, but even here the quantities did not greatly exceed immediate requirements, and frequently even these items were bought by the piece. Molded plastics and special fittings or stampings were sometimes bought in excess of immediate needs, especially when costs of small lot procurement were prohibitive. The supply manager did not alter the quantities shown on the make-and-buy sheet without discussion with the superintendent.

When materials began to come in, they were checked off the make-and-buy sheet and taken to the storeroom, to the production floor, or, if they were finished parts, to assembly.

Little attempt was made to schedule work to the shop, and the machine shop foreman was free to work on any manufacturing orders on which materials had been received. It was up to him to keep his staff and machines busy and to meet the estimated completion dates. As parts were completed, they moved on to assembly, where they were placed in the tote box with other parts accumulated against that order. When all parts were completed, assembly could take place. Finished units were placed in stock in the shipping room or were shipped out immediately against orders.

Completion of the lot was not posted to the sales and production record until the entire lot was finished. Inasmuch as some units were often assembled well in advance of the completion of the entire lot, the sales and production record frequently indicated earliest delivery as some time in the future when, in fact, completed units were in storage on the shipping room shelves. In this way sales had been lost to competitors who quoted earlier deliveries. Other sales had been lost because in setting estimated completion dates the superintendent usually allowed himself more time than was necessary for ordering, machining, and assembly.

The company had no formal inventory control system. No record was kept of raw materials, purchased parts, or manufactured parts on hand. An informal tabulation of finished goods, the sales and production record, was maintained for each item. This showed the balance on hand, the amount currently being manufactured, orders received, customers’ names, and dates of shipments made. It also showed the minimum stock balance and the standard manufacturing quantity. These had been determined at a top management level, taking into consideration past sales of the item, the time required for a production run, manufacturing economies, potential obsolescence, storage space available, and the financial resources of the company. In the last year, the minimum stock balance and the manufacturing quantity on most items had been revised upward because of a substantial increase in volume, delivery delays, and more frequent manufacturing runs. The company felt that about three to four runs per year was about right for each item. A typical manufacturing run required about nine to twelve weeks, most of which was consumed in obtaining castings. Actual processing in the plant required two to four weeks. Recently, it was found that jobs were frequently sold before completion and a second lot started before the first lot was finished. Currently, about fifty to sixty shop orders were initiated each month.

As customer orders were received, they were posted to the sales and production record. When such orders reduced the balance on hand and in process to the predetermined minimum, a notice of depletions was prepared, showing the balance on hand and the standard manufacturing quantity. This notice was sent to the plant superintendent.

Big D did not have a formal production planning and inventory control activity. The plant superintendent, in determining the exact quantity to manufacture, was guided by the previously set quantities but consulted informally with the engineer, development, sales, and finance departments before each run. He then made out a make-and-buy sheet showing for the item in question the various parts required, the shop print numbers, the materials from which the parts were made, the quantity of each part required per completed unit, and the estimated completion date.

The make-and-buy sheet was forwarded to the assembly foreman, who checked off for each part the quantity of that part which had been accumulated from overruns on previous orders. No records were kept on such accumulated parts. The parts were stored in bins in the assembly department, and those counted out against the make-and-buy sheet were separated in a tote box against the time when that order would be assembled.

The make-and-buy sheet was returned to the plant superintendent, who edited it to determine whether certain parts should be made or ordered in larger quantity than required for that particular order. Where parts were interchangeable, he might also consolidate them with other orders. The plant superintendent was familiar with the manufacturing process and setups involved, knew the price breaks on materials, and had a general knowledge of probable future demand. Before forwarding the make-and-buy sheet to the supply manager, the superintendent entered an estimated completion date, which in turn was posted to the sales and production record.

The plant superintendent’s secretary performed the traffic function. Three young employees who were more or less under the control of the superintendent performed receiving and warehousing. Normally, when an incoming shipment arrived, the foreman would oversee its receipt. Supply reported to the plant superintendent.

Certain executives felt that the company should establish a more systematic control over raw material, manufactured and finished parts, and finished goods inventories. They pointed to the orders lost, the waste of buying and producing in small quantities, delays in production and assembly occasioned by absence of materials and parts, and losses by misplacement, breakage, and pilferage. These concerned officials also felt that Big D might be able to make significant savings through a systematic control of surplus and salvage. Two of the officials expressed concern over the amount of money spent on transportation. No survey had been made to evaluate potential savings in these areas since no records were kept. Inventory losses could not be measured. Pilferage was probably negligible, because the only items having real intrinsic value (thermometers and similar components) were kept in a locked cabinet by the assembly foreman. Transportation costs were estimated to be 12 percent of the cost of purchased material.

Those who opposed changing the inventory control procedure pointed out the risks of obsolescence in any inventory accumulation, and, more importantly, the amount of funds that might be tied up in inventory and the space that would be necessary if substantial stocks of materials, parts, or finished assemblies were to be built up. They resisted the introduction of changes in the areas of production planning and control, receiving, warehousing, and traffic. They also pointed out that other uses of company buildings, equipment, research, and development would yield greater returns.

1. What specific action should the company take in the area of inventory control? Support your proposal with an analysis of its strengths and weaknesses.

2. What is your reaction to the argument of those who oppose tighter controls?

3. How would your recommendation in answering question 1 differ if this company were making a single product?

4. How does the inventory control problem change as the company’s overall volume of business increases? 5. Do you think that Big D could benefit from the establishment of a supply chain management department? If so, what functions should it include?

Reference no: EM132214238

Questions Cloud

Blind eye to illegal maneuver performed by certain employees : John heard that the board of directors had turned a blind eye to illegal maneuvers performed by certain employees,
Starbucks adopted in entering foreign? markets : How would you evaluate the entry mode strategy that Starbucks adopted in entering foreign? markets? Evaluate both strategic and profitability dimensions.
Two types of members-care seeker and caregiver : There are two types of members: care seeker and caregiver. Non-member care seeker can browse for location-based candidate caregivers but cannot post a job.
Moving marketing dollars from traditional advertising : What did they gain and what did they sacrifice by moving marketing dollars from traditional advertising?
The company take in the area of inventory control : What specific action should the company take in the area of inventory control? Support your proposal with an analysis of its strengths and weaknesses.
Review concepts of unethical violations to business : Review concepts of unethical violations to business. In particular, focus on “bribery.”
Contrast structured versus unstructured decisions : Using your life, contrast structured versus unstructured decisions that you regularly have to make (2-3 examples)
Personal level of intercultural communication competence : Critically examine your personal level of intercultural communication competence.
The capabilities behind the spanish fast fashion : The Capabilities behind the Spanish “Fast Fashion” Retail Giant Amancio Ortega built the world’s largest fashion empire through his Zara branded products

Reviews

Write a Review

Operation Management Questions & Answers

  Book review - the goal

Operations Management is about a book review. Title of the book is "Goal". This book has been written by Dr. Eliyahu Goldartt. The book has been appreciated by many as one of those books which offers an insight into the operations and strategic capac..

  Operational plan in hospitality enterprise

Operational plan pertaining to a hospitality enterprise is given in detail in the solution. The operational plan is an important plan or preparation which gives guidelines regarding the role and responsibilities of each and every operation at all lev..

  Managing operations and information

Recognise the importance of a strategic approach to the development and deployment of organisational information systems. Demonstrate an understanding of the importance of databases and their integration to the organisation's overall information mana..

  A make-or-buy analysis

An analysis of the holding costs, including the appropriate annual holding cost rate.

  Evolution and contributor of operations management

Briefly explain Evolution and contributor of Operations management.

  Functions and responsibilities of an operations manager

A number of drivers of change have transformed the roles, functions and responsibilities of an operations manager over recent years. These drivers have not only been based on technological innovations but also on the need for organisations to develop..

  Compute the optimal order quantity

Compute the Optimal Order quantity of DVD players. Determine the appropriate reorder point.

  Relationship to operations practice in the organisation

Evaluate problems in operations and identify approaches to overcoming them. Critically evaluate operating plans and identify areas for improvement. Justify, implement and evaluate changes to operations in line with modern approaches.

  A make or buy analysis

Develop a report for Figi Fabricating that will address the question of whether the company should continue to purchase the part from the supplier or begin to produce the part itself.

  Prepare a staffing plan

Prepare a staffing plan showing the change of your unit from medical/surgical staffing to oncology staffing.

  Leadership styles in different organizations

Ccompare the effectiveness of different leadership styles in different organizations

  Risk management tools and models

Be able to understand the concept of risk, roles and responsibilities for risk management and risk management tools and models.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd