The aim of this project is for you to discover how to use a

Assignment Help Computer Engineering
Reference no: EM13347172

The aim of this project is for you to discover how to use a spreadsheet to "model" a typical engineering problem, in this case a heat transfer situation. And to discover how this model can be used to solve problems that would otherwise require lengthy analytical or trial and error solutions. The model can then be used as a design/analysis tool to try out various "what if" scenarios.

Hot oil is used as an alternative to steam for providing process heat in some industries. In our scenario the hot oil is being pumped to the process equipment through an insulated pipe and we want to determine the rate of heat loss per metre of pipe. The pipe is made from mild steel and is insulated with fibreglass and clad with stainless steel. Heat is being lost from the stainless steel cladding surface by convection and by radiation. The initial problem is to determine the heat loss and cladding surface temperature for various thicknesses of the fibreglass insulation.

826_Computer Systems Management.png

The following data is given:

hot oil temperature, Thot oil............................................................ 180°C

steel pipe internal diameter, di..................................................... 80 mm

steel pipe external diameter, do.................................................... 90 mm

pipe length, L................................................................................. nominal, 1 m

inside convection heat transfer coefficient, hi............................... 50 W/m2°C

steel pipe thermal conductivity, kpipe............................................ 35 W/m°C

initial fibreglass insulation thicknesses kins........................................... 25 mm

insulation thermal conductivity, kclad............................................. 0.039 W/m°C

stainless steel cladding thickness Eclad................................................... 2.6 mm

stainless steel cladding thermal conductivity, ho........................ 14 W/m°C

stainless steel emissivity, Tsurr ....................................................... 0.2

outside convection heat transfer coefficient, ........................... 18 W/mC

ambient/surrounding surface temperature, .......................... 22°C

At first glance this looks to be a relatively simple problem, however to solve it we need to find the surface temperature, before we can find the heat loss, . To solve for analytically would require the solution of a polynomial (quartic) equation. With the spreadsheet we can solve this fairly easily using a trial and error approach or using one of the advanced tools available in Excel to automate this process...

You are required to:

  • Set up a spreadsheet model of the heat transfer situation, using Microsoft Excel, as detailed below.
  • Write a Report with comments and results as also detailed below.

1. Spreadsheet Model

2. Further Analysis

3. "What if" analysis

Reference no: EM13347172

Questions Cloud

Question 1rodney brick is completing a master of accounting : question 1rodney brick is completing a master of accounting part-time and has taken on a role as an auditing assistant
Problem 1nbsp as you know utility functions incorporate a : problem 1nbsp as you know utility functions incorporate a decision makers attitude towards risk. lets consider that the
You work for a major consultancy firms in corporate finance : you work for a major consultancy firms in corporate finance. your firm has been approached by one of its major clients
Question 1partners ma running-buck and mcfarlane own a : question 1partners ma running-buck and mcfarlane own a hotel. mcfarlane decides that the business has far fewer linens
The aim of this project is for you to discover how to use a : the aim of this project is for you to discover how to use a spreadsheet to model a typical engineering problem in this
Prepare a research proposal based on a business : prepare a research proposal based on a business issue.approaching the assignment1.identify the key terms and
To identify and encourage the discussion of some of the : to identify and encourage the discussion of some of the current issues which are affecting businesses especially those
Question 1 evaluate the following recurrence relations but : question 1. evaluate the following recurrence relations but do not solve. make sure to state for which values of n your
Foundations of logistic regression1 what values can the : foundations of logistic regression1 what values can the response variable y take in logistic regression and hence

Reviews

Write a Review

Computer Engineering Questions & Answers

  Mathematics in computing

Binary search tree, and postorder and preorder traversal Determine the shortest path in Graph

  Ict governance

ICT is defined as the term of Information and communication technologies, it is diverse set of technical tools and resources used by the government agencies to communicate and produce, circulate, store, and manage all information.

  Implementation of memory management

Assignment covers the following eight topics and explore the implementation of memory management, processes and threads.

  Realize business and organizational data storage

Realize business and organizational data storage and fast access times are much more important than they have ever been. Compare and contrast magnetic tapes, magnetic disks, optical discs

  What is the protocol overhead

What are the advantages of using a compiled language over an interpreted one? Under what circumstances would you select to use an interpreted language?

  Implementation of memory management

Paper describes about memory management. How memory is used in executing programs and its critical support for applications.

  Define open and closed loop control systems

Define open and closed loop cotrol systems.Explain difference between time varying and time invariant control system wth suitable example.

  Prepare a proposal to deploy windows server

Prepare a proposal to deploy Windows Server onto an existing network based on the provided scenario.

  Security policy document project

Analyze security requirements and develop a security policy

  Write a procedure that produces independent stack objects

Write a procedure (make-stack) that produces independent stack objects, using a message-passing style, e.g.

  Define a suitable functional unit

Define a suitable functional unit for a comparative study between two different types of paint.

  Calculate yield to maturity and bond prices

Calculate yield to maturity (YTM) and bond prices

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd