Assignment 1- AWBM modelling

1. Overview

This assessment is designed to test your achievement of course objectives 4 to 8 focussing on model calibration and rainfall-runoff modelling. This assignment is based on a hypothetical project and is divided into two main activities:
1. Familiarisation with AWBM software -described in Section 2
2. Calibration of AWBM for the Emu Creek catchment - described in Section 3

Details of the submission requirements for Assignment 1, as well as how the assignment will be marked, is described in Section 4.

2. Familiarisation with the AWBM model
Some students may have been previously introduced to a ‘cut-down' version of the Australian Water Balance Model (AWBM) when completing ENV3105 Hydrology. It is now important to understand the basic workings of the full AWBM which incorporates the attenuation of surface flows and base flows.

The AWBM is included in the suite of rainfall-runoff models contained within the Rainfall Runoff Library software (RRL Version 1.05). Download the RRL software from the eWater website and install. The RRL User Guide (Podger, 2004) is provided as a resource for Module 3 and gives information on how to install and run RRL. The guide also provides brief descriptions of AWBM (Chapter 4.1) and parameter optimisers (Chapter 5). It also provides useful advice on model calibration (Chapter 6).

AWBM has been progressively developed by Professor Walter Boughton and several publications are available that document its history, capabilities and application. Table 1 gives a list of selected papers and key information that they contain for you to complete this assignment. It is recommended that you peruse the selected papers.

Table 1 Selected AWBM publications

Publication

Key information

Boughton (2004)

Provides a general description of AWBM, including the 'self- calibrating' version AWBM2002 within RRL (under Custom method of calibration). This is also referred to as 'auto- calibration' based on an average storage capacity.

Boughton (2007)

Monthly potential evapotranspiration (PET) values considered acceptable as an AWBM input. Highlights the importance of areal rainfall as a critical AWBM input.

Boughton (2009)

Recommends to use PET adjusted by 0.85 as an AWBM input. Lists average sets of AWBM parameter values for various Australian states.

AWBM Familiarisation Activity - Jardine River

This activity is assessable and is included as a way for you to trial the RRL software before embarking on the full calibration exercise (See Section 3). Refer to Section 4 on the submission requirements for this part of the assignment.

Open the Jardine River project file (AWBM_Jardine.jobf) and use the RRL software to complete the following:

1. For the available data from 1974 to 1989, what is the average annual rainfall, evapotranspiration and observed runoff for the Jardine River?

2. Setup the following simulation periods: Warmup from 1 January 1974 to 31 December 1974 and a calibration period to 31 December 1986. Use the SCE-UA optimisation method and the RMSE objective function to optimise the AWBM. What are the AWBM calibrated parameter values that are generated from this optimisation? In terms of the degree of fit with the observed data, what are the RMSE, Nash-Sutcliffe E and Coefficient of Determination (Correlation) values?

3. Extract a scatter plot of monthly observed and predicted runoff. Also provide a ‘zoomed in' plot of observed and calculated runoffs covering the 1976 wet season.

As well as becoming familiar with the use of RRL, you should also understand the AWBM model algorithms (see good modelling practice Module 2.4). In particular, you should gain an appreciation of how the model results change when a parameter value is adjusted (see the ‘electronic control box' analogy Module 2.3). This understanding will assist you in calibrating the AWBM to measured streamflows. Complete the following:

4. The scatter plot and 1976 wet season plot generated from the above Step 3 provides a benchmark or starting point to compare how the AWBM streamflows may change in response to adjustment of the AWBM parameters. The total runoff which can be found under Data Statistics is also a useful measure of model results.
5. Taking each AWBM parameter in turn, rerun the AWBM with a higher and lower parameter value and regenerate the above outputs. Keep the values of the other parameters constant, so the effect of the selected AWBM parameter is isolated. You may need to substantially vary some parameters.
6. Describe the effect of adjusting each AWBM parameter on the plotted results. Describe, based on your knowledge of the AWBM model structure, why this effect has occurred.

3. AWBM Validation - Emu Creek streamflows

This part of the assignment involves the calibration and verification of an AWBM of the Emu Creek catchment, based on the modelling practices and validation procedures described in the Study Book Module 2 and 3. A gauging station is operated by the Queensland Department of Natural Resources and Mines (QDNRM) on Emu Creek at Emu Vale (GS 422313B). Details of the streamgauge can be found at the QDNRM Watershed website.
https://watermonitoring.derm.qld.gov.au/host.htm

As a background, the purpose of the analysis is to establish calibrated AWBM parameters for the catchment. These parameter values would assist in the development of an AWBM model required for proposed dam reservoir located on Emu Creek (this work is outside the scope of the assignment). It is intended that estimates of monthly streamflows over several decades covering a range of dry and wet conditions will be produced as inputs to a dam water balance assessment.

Data and Resources

Data and resources in order to complete the AWBM modelling are listed in Table 2 and can be downloaded from external websites.

Table 2: AWBM data and resources

Description

Source

Topographic map of the catchment and surrounding region

A topographic map can be extracted from the QDNRM QTopo online mapping tool.

Daily and monthly streamflows at GS 422313B for period of record

Available at QDNRM Watershed website.

Daily rainfalls at local raingauges and evapotranspiration data

Available at Bureau of Meteorology (BOM) Climate Data Online website

eWater River Analysis Package (RAP) software

Available from eWater website. Useful for gap filling timeseries data using Time Series Manager and for computing the base flow index at a streamgauge using Time Series Analysis.

Methodology

The following methodology is recommended to validate the AWBM and to apply the model to generate the required monthly streamflows. The tasks generally correspond to the good modelling practices described in Study Book Module 2.4. Chapter 6 of the RRL User Guide also provides useful information. The tasks are:

1. Check and prepare input data
2. Calibrate and verify the AWBM
3. Undertake a sensitivity analysis
4. Conduct a sanity check of the AWBM outputs
5. Generate monthly streamflow estimates
6. Document your work as a report

The tasks are described in more detail below.

Check and Prepare Input Data
BOM Climate Data Online provides a map showing rainfall stations in the local region of the Emu Creek catchment. Rainfalls are also measured at the streamgauge. Identify potential rainfall sites based on proximity and data availability. The hydrology data from BOM have quality codes indicating missing data or other problems that may affect the reliable use of the data. It is thus critical to review the data and to identify time periods when data is of poor quality or missing and unsuitable for modelling. This is essential to have confidence in the simulation periods that are selected to validate the AWBM.

The River Analysis Package (RAP) freely available from the eWater Toolkit website is useful software that can be used to identify gaps in timeseries data and plot the data. It also has the capability to fill in missing data by linear interpolation or by multiple linear regressions using data from other rainfall gauges.

The following tasks are suggested:

1. Download the historical streamflow data and identify missing periods and/or poor quality data. Evaluate the likely accuracy of the streamgauge rating curve based on the number and magnitude of the gaugings that have been done. This will provide an indication of the overall quality of the streamflow discharges derived from the rating curve. Identify periods of record that would be useful to test the AWBM streamflow estimates and generate a daily discharge file to load into AWBM. Ensure that days with missing data are assigned the correct RRL value (e.g. -9999).

2. Generate a topographic base plan using the QTopo website. Draw the catchment boundary of the Emu Creek gauge and the locations of nearby rainfall stations. If you do not have access to mapping or CAD software, it is suggested that a pdf editor will be adequate to do this task. PDF XChange Editor has basic polygon drawing and measurement tools. A free version can be downloaded from Tracker Software.

3. Plot the rainfall timeseries and check the available rainfall data for completeness and quality. Tabulate time periods for each station that you consider have data suitable for the AWBM modelling.

4. If rainfall sites have comparatively small gaps of missing data, use RAP to infill these gaps

5. Use the recommended activities described in RRL User Guide 6.1.2 to select rainfall sites and generate a catchment-average daily rainfall input file for AWBM

6. Obtain monthly potential evapotranspiration from BOM online maps. Generate a daily evapotranspiration input file for AWBM. RAP software may be useful for this purpose.

AWBM utilises daily rainfalls representative of the spatial average (or areal rainfall) across the catchment, whereas the measured rainfall data are point rainfalls. Thus, a geographical spread of rainfall stations should be selected that allow you to estimate the areal rainfall - stations outside of the catchment boundary may be required.

The BOM Water Data Online website includes the Emu Creek streamgauge within its compilation of Australian water information and also shows useful information for this site.

Calibrate and Verify the AWBM

The rainfall, evapotranspiration and observed streamflow data used for AWBM need to be loaded into the RRL. After the data files have been inputted into RRL, make use of the Input statistics to check that no errors have been made.

The setup and validation of the AWBM involves the use of three different approaches:

1. Testing of the AWBM using ‘initial guess' parameter values adopted from available publications.

2. Calibration using AWBM Auto Calibration

3. Calibration using a selected optimisation method Details of the three approaches are provided in Table 3.

Table 3: AWBM testing and validation approaches

Approach

Description

Test 'initial guess' parameters

Based on the AWBM publications given in Table 1 (and other resources that you can find), determine preliminary estimates of the model parameters applicable to the catchment. In the case of BFI, this parameter can be (approximately) estimated using the base flow analyser in RAP Time Series Analysis. Do a Manual AWBM run based on these 'initial guess' values for the full streamflow record. Report the fit with observed monthly streamflows.

AWBM Auto Calibration

Split the simulation period into a calibration and a verification run. As noted in the RRL User Guide (Section 6.2.2) ideally the calibration period should include both wet and dry extremes and has an average annual flow that is similar to that of the whole streamflow record.

Identify AWBM parameter values using Auto Calibration. Report the fit with observed monthly streamflows.

Selected optimisation

Use the same calibration and verification periods as above. Select one of the available AWBM optimisation methods (in the Generic tab) and justify your choice. Identify AWBM parameter values using the selected optimiser and report the fit with observed monthly streamflows.

Tabulate the sets of ‘calibrated' AWBM parameters based on the outcomes of the three different approaches and also summarise their performance in matching observed streamflows. Identify the AWBM parameter set that you consider to perform the best in predicting streamflows. If your selected approach is not based on ‘initial guess' parameters, rerun the AWBM using a single calibration over the entire simulation period (i.e. no split sampling). Report whether the fit with observed runoff has been significantly changed and/or improved.

AWBM Sensitivity Analysis
Computer modelling always carries a level of uncertainty and one approach to address uncertainty is to undertake a sensitivity analysis of the model parameters. The simplest approach is referred to as a ‘one-at-a-time' analysis. This involves selecting a parameter, increasing the parameter value by a fixed proportion (typically +10%), rerunning the model (keeping the other parameters to ‘calibrated' values) and reporting the model results. This process is repeated for a reduction of the parameter value (typically -10%). The whole process is then repeated for a different AWBM parameter until the sensitivity of model results to each individual parameter is established.

Use the selected AWBM parameter set as the starting point for the sensitivity testing. From the sensitivity analysis, you should be able get an appreciation of which parameters are more important in terms of their effect on model outcomes. This will guide you on which parameters should be closely checked (refer next task).

Sanity Check of AWBM Outputs
Sanity checks should (always) be made to give you confidence that the AWBM model is providing acceptable results and that no major errors of analysis or data input/output has been made. The sanity checks should include:

1. Checking that the selected AWBM values are consistent with the underlying principles of the model. For example, the store capacities should increase in size (i.e C1<C2<C3)
2. Computing the observed and predicted mean annual runoff (ML/yr) for the full streamflow period. As a guide, these mean estimates should match to within 5%.
3. Compare the above estimate with the average annual runoff for the catchment based on Boughton and Chiew (2007).


4. Closely inspect how well AWBM daily flow estimates match recorded flows for a selection of large individual floods within the streamgauge record. This includes the peak discharge and the recession curve of the flood.
5. Compare flow duration curves for observed and predicted daily flows. These curves can be prepared within RRL.

These sanity checks may necessitate some adjustments to the AWBM parameter values. Manual changes to AWBM parameter values can be made in RRL.

Generate Monthly Streamflows

Once you are satisfied with the accuracy of model predictions, run the AWBM with the final set of parameter values to generate monthly streamflows for the available period of record. Provide a timeseries plot of monthly flow volumes..Also compute and plot the average flow volume for each month of the year to show how flows vary seasonally within Emu Creek. (Note, these volumes are the average over the simulation for each month of the year). The RAP software can generate monthly average statistics.

Reference no: EM131157492

Questions Cloud

Does emotional intelligence affect happiness : My research question is: Does emotional intelligence affect happiness? What statistics test would be best to use since all my subjects were issued one survey at one time. I am not comparing age or gender. Just collecting responses.
What genetic diseases were determined to be potential issues : What genetic diseases or problems were determined to be potential issues? Provide an introduction of the disease, outlining the major signs/symptoms of the disorder and the reason why this was selected as a genetic/inherited disease?
What can people do to break free from media hypnosis : In what ways are people manipulated by the media that they consume? Make sure to give specific examples. What types of consequences can follow from people having more choices of what media they can consume? Do we control our media or does it contr..
Determine the impact of the company mission and vision : Determine the impact of the company's mission, vision, and primary stakeholders on its overall success. Analyze the five (5) forces of competition to determine how they impact the company
Testing of the awbm using initial guess parameter : Testing of the AWBM using ‘initial guess' parameter values adopted from available publications - Calibration using AWBM Auto Calibration
Analyze views of nature expressed by ralph waldo emerson : Analyze the views of nature expressed by Ralph Waldo Emerson and Henry David Thoreau in this week's readings. Then compare and contrast them to one another. You might also want to apply these themes of nature to overall thought of the Transcenden..
What are the companys enterprise value : What are the company's enterprise value and capital structure weights? - What is the company's cost of equity according to CAPM.
Design an electromagnetic cannon : Two molecules interact in a complicated way that can be described by the potential energy (V) vs. separation (r) graph shown. They are placed 16 nm apart and released from rest.
Explain how your individual values drive your actions : Explain how your individual values drive your actions and behaviors, and analyze the alignment between your values and actions and behaviors

Reviews

Write a Review

Other Subject Questions & Answers

  Pivotal role in miamis economic and political transformation

how Cubans played a pivotal role in Miami’s economic and political transformation. how Cubans played a pivotal role in Miami’s political transformation

  Describe your personal values and spiritual beliefs

Describe your personal values and spiritual beliefs.2) Using the elements of cost, quality, and social issues to frame your description, differentiates your beliefs and opinions about health care policy. Give examples of relevant ethical princip..

  Health care reimbursement

Health Care Reimbursement

  Different types of buyers and consumers

What are the different types of buyers and consumers? How does the type of buyer or consumer affect marketing strategy? As part of your response, consider the characteristics of buyers and the factors that influence their purchasing decision.

  Design and demonstrate an understanding of the principles

Describe the specific methods employed for collecting and processing all of the various sets of data - Compare the major approaches to research design and demonstrate an understanding of the principles and processes involved in developing and addre..

  Describes both glucose and fructose

Which description BEST describes Fructose. Which description BEST describes Glucose. Which description BEST describes both Glucose and Fructose

  Aspects of health policy formation and implementation

To understand health policy, choose two aspects of health policy formation/implementation that are particularly challenging and explain why

  Summarize the information in the article

Choose from one of the forensic related subjects presented in the text/lecture , Identify at least six articles and describe how they support/apply to the subject selected.

  What major safety and health hazards

What major safety and health (including ergonomic) hazards can you identify and control? Can you link these to their potential impact on worker health and safety?

  Increase the value of a real option

Which of the following will NOT increase the value of a real option?

  How topic relates to one academic and professional pursuits

To help prepare for your Final Research Project, write an annotated bibliography to indicate the quality of the sources you have read. The bibliography must include no less than five scholarly sources that will be used to support the major points ..

  What is the importance of customer care

Customer care is at the heart of any successful service organization. What is the importance of customer care? Integrated Marketing Communications is a term used to describe a holistic approach to marketing. It aims to ensure consistency of mess..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd