SVY2302 Mine Surveying Assignment

Assignment Help Civil Engineering
Reference no: EM133135048

SVY2302 Mine Surveying - University of Southern Queensland

Underground Surveying Problems

Question 1: As Mine Surveyor of an underground mine you have been instructed to design a tunnel to join a crosscut to a haulage drive. The details of the crosscut and drive are shown below.

Crosscut

Bearing:

61°06'25"

 

Grade:

1:50

 

Last Survey Station:

5417.744 E

 

 

2448.954 N

 

 

1099.439 RL Floor

 

Haulage drive

 

Bearing:

 

321°43'10"

 

Grade:

-1:100

 

Last Survey Station:

5594.088 E

 

 

2384.402 N

 

 

1107.549 RL Floor

The face of the crosscut is 80m ahead of the last station. Both the crosscut and haulage drive are 5m wide and 4m high.

The tunnel is to have a circular horizontal alignment turning right from the crosscut with a radius of not more than 50m and not less that 30m with a maximum grade of 1 in 10.

a) Calculate the co-ordinates of the two tangent points for the most cost effective solution.
b) Plot the crosscut and drives at suitable scale showing all relevant information. Show the proposed walls as dashed lines on the plan.
c) Calculate the co-ordinates of a point (STN 45) that is 5m along the centreline of the tunnel from the TP in the crosscut (TP1). Check your calculations using the plan.
d) From this point (STN 45) a chord line bearing 82°43' is to be set out. At 2m intervals calculate the centreline offsets from this line and reduced levels of the floor.
e) At what chainage from STN 45 should mining cease and why?

Question 2:

To establish horizontal control on a new level the surveyor has traversed between two single wires hung in separate shafts.

 

The surveyor has set up the instrument at IS100 sighted to Wire X and has installed and made observations to wall stations WS150 and WS151. The observations at IS1000 are as follows.

To

Wire X

FL

215°44'30"

25.382

 

 

FR

35°44'16"

 

 

WS150

FL

60°19'45"

39.838

 

 

FR

240°19'31"

 

 

WS151

FL

67°14'48"

115.986

 

 

FR

247°14'56"

 

The surveyor then sets up at IS101 observed to the wall stations as well as Wire
Y. The observations at IS101 are as follows.

To

WS150

FL

254°26'41"

121.766

 

 

FR

74°26'53"

 

 

WS151

FL

262°56'09"

45.983

 

 

FR

82°56'17"

 

 

Wire Y

FL

115°18'40"

38.340

 

 

FR

295°18'32"

 

a) Calculate the final adjusted co-ordinates for the two wall stations WS150 and WS151. Outline your steps clearly.

Question 3

The Falk underground coal mine has been mining the Hero seam which is a 4m high steaming coal, and the 3m high Devil seam, which is high grade soft coking coal, to allow blending and to produce coal for extra marketing potential.

It is proposed to join the present workings in the Hero seam with the workings in the Devil seam with a curved drive through the rock to allow vehicular access between the workings. The interburden is competent sandstone.

All survey stations are in the roof. The grades of both existing drives can be regarded as consistent.

Survey data is as follows:

Workings in Hero Seam

Survey Station

Easting

Northing

RL

Location

FH337

3402.123

4239.437

767.921

On heading centreline at the present face

FH336

3526.326

4174.498

772.919

On heading centreline

Workings in Devil Seam

Survey Station

Easting

Northing

RL

Location

FD113

3212.396

4125.585

758.881

On heading centreline at the present face

FD112

3179.369

3942.687

757.592

On heading centreline

The proposed drive will be 3m high and 5m wide, drivage to start at the floor at FH337. Mined material will be loaded out and dumped in back headings in the Hero workings.

The proposed drive will be a circular curve with a tangent at FH337 and tangential to centreline FD112 - FD113. Grade is to be consistent from FH337 to FD113.

a) Design the proposed drive. Calculate the radius and length of drivage.

b) Calculate where the drive meets the centreline FD112 - FD113 (the coordinate of TP).

c) Calculate the grade of the drive to meet the floor of the Devil seam at FD113.

d) Plot the drive plan showing all relevant information (show the proposed walls as dashed lines on the plan).

e) Calculate the total volume of material to be mined.

Reference no: EM133135048

Questions Cloud

Understanding of cultural competency and diversity : Share one or two quotes (include the source) that capture your understanding of cultural competency and diversity.
Bad job of performance management : Why do supervisors typically do a bad job of performance management?
Skills of reflection of feelings : The crisis counselor attempts to engage the husband but has difficulty establishing rapport as he avoids eye contact and offers short answers to questions.
Record the period-end adjusting entry to cost of goods sold : Record period-end adjusting entry to cost of goods sold on August 31, assuming the company has no beginning inventory and ending inventory has cost of $3,510
SVY2302 Mine Surveying Assignment : SVY2302 Mine Surveying Assignment Help and Solution, University of Southern Queensland - Assessment Writing Service
Contract-specific fixed investments : Froeb discussed post-investment holdup as a sunk cost problem associated with contract-specific fixed investments
Why are values important to od practitioners : Why are values important to OD practitioners?
How a firm strategy affects its recruiting effects : Explain how a firm strategy affects its recruiting effects?
Fairly compete in the job market : Employement equity legislation helped designated groups to fairly compete in the job market. Mention 4 designated groups

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd