Reference no: EM133018649
ARBE3100 Construction Technology - The University of Newcastle
Report - Superstructure Construction Report
Assignment objectives
On completion of this assignment the student should be able to:
1. Demonstrate knowledge of the ground and soil conditions, materials, systems and components used in the construction of commercial buildings;
2. Demonstrate knowledge of the techniques used to incorporate them into the building, including sequencing of operations;
3. Evaluate design alternatives in terms of buildability and cost;
4. Communicate design alternatives using drawings reflecting the statutory standards.
Table 1 shows the matching between the assignment objectives and course objectives.
Assignment Objectives
|
Course Objectives
|
A1
|
C1
|
A2
|
C2
|
A3
|
C3
|
A4
|
C4
|
Assignment brief
Introduction
For Reports 1 and 2, your role is that of an architectural design and build construction organisation which has been approached by a client who wishes you to undertake the design and construction of a medium sized commercial retail development on a site they already own. The client's brief, the site plan and site investigation information will be provided can be found on Blackboard.
Task
You are required to submit a report outlining the design and construction of the superstructure for the commercial retail development. The report should contain:
• An introduction to conceptualize the problem, providing background and site analysis .
• A discussion and analysis of the suitability of the various methods and technologies available for the construction of the superstructure (including cladding), in response to specific site conditions, comparing and contrasting the advantages and disadvantages of each, with a reasoned explanation of why you have chosen your preferred approach and how the requirements of client are fully addressed.
• A tabular cost comparison of the various superstructure/framing options considered.
• A step by step explanation (using drawings and/or diagrams to illustrate) of the major construction sequencing (including cladding) of the tasks and activities involved in the construction of your chosen design. Floor layout plan(s) showing the details of the retailer's arrangement, offices' arrangement and internal access systems etc. should be provided.
• Cross sectional scaled construction drawings (A4) illustrating the fixing/jointing & insulation details of your chosen cladding system.
• A professionally written report, including such qualities as structuring sections and paragraphs to bring out a sound professional discussion, control of the conciseness and relevance of the discussion, and to use appropriate citation and referencing techniques.
You are required to make assumptions or ‘educated' guesses on any information/material that you believe to be missing. If this is the case you are to explain/justify these assumptions.
Attachment:- Superstructure Construction Report.rar
Calculate the cost per equivalent unit for labor
: The balance in beginning Work in Process at Lawn Rubber Company for direct labor was $150,000. Calculate the cost per equivalent unit for labor
|
What are the forward price and the value of forward contract
: Six months later, the price of the stock is $45 and the risk-free interest rate is still 10%. What are the forward price and the value of the forward contract
|
How much interest expense will be paid on august
: Allstar Company signed a $100,000 mortgage on July 1, 2021 for the purchase of their new garage building. How much interest expense will be paid on August
|
Calculate the firm net income
: Garden Pro Corporation has sales of $4,690,516; income tax of $499,836; Calculate the firm net income
|
Superstructure construction report
: Superstructure Construction Report - Demonstrate knowledge of the ground and soil conditions, materials, systems and components used in the construction
|
Determine the required interest rate
: One-year T-bill rates are expected to steadily increase by 1.5% per year over the next six years. Determine the required interest rate
|
Calculate the net taxable capital gains of this sale
: Calculate the net taxable capital gains of this sale for 2020, assuming that Mr. Rhodes deducts the maximum capital gains reserve
|
Record the transactions on the books of culver corporation
: The selling price of the goods is $5,500, and the cost to Pronghorn Company is $2,960. Record the transactions on the books of Culver Corporation
|
What was the per unit price of the actual materials used
: Under Standard Cost System, the material quantity variance was recorded at P1,970 unfavorable, What was the per unit price of the actual materials used
|